SlideShare uma empresa Scribd logo
1 de 3
Cooling glass factories: ventilation is a tricky business
Natural gravity ventilation is the best cooling solution
The benefits of natural ventilation in large industrial buildings are clear and well accepted: no electricity
is needed to operate the system, as it simply uses the energy present in the warm air – and there is
plenty of this in a glass factory – and this buoyancy-driven airflow is virtually maintenance free.
You can read more about the benefits of natural ventilation in our previous blog post: Natural
ventilation is the solution for most heat intensive industries.
The issue with ventilating glass factories
This said, ventilation in glass factories has always been a hot issue. You need to evacuate the surplus
of thermal energy generated by the oven, at the hot end of the factory. However, if this isn’t done
exactly right, it might create air currents in the cold end of the factory depositing dust on the brand new
glass – a big concern for the quality of your product. Please see below for images which illustrate this
point.
A well-engineered system is the answer
To safeguard the quality of your production, it is important that you rely on experts with specialist
experience in the glass industry to design your ventilation system. Every building has its own
characteristics and dynamics, depending on its shape, layout and the distribution of the production
equipment within the factory.
It is critical that the designer has the capacity to get a clear picture of the airflows in and around the
building in order to ensure the system efficiently evacuates excess heat from the hot end without
creating undesired currents at the cold end. Computational Fluid Dynamics (CFD) simulations carried
out by experienced engineers have proven to be invaluable tools to develop and validate a well
engineered system.
Call in the experts
At Colt we have a long history of designing ventilation systems. We have studied a vast number of
factories that house production processes that generate extreme heat, such as smelters and glass
factories. Over the years we have taken measurements in a wide variety of ambient conditions and
completed a large number of CFD analyses, gaining the experience that enables us to get the best
possible match between our simulations and the actual measurements.
If you would like to evaluate the ventilation system in your glass factory or install a new one, why not
get in touch with us and request a free consultation?
© 2013 Colt International Licensing Ltd.
Here is a section through a glass factory showing the oven area. In this part of the building heat load is
significant, sometimes in excess of 20 MW. Natural ventilation allows massive release of heat to the
outside.
But air leaving through the ventilators needs replacement inlet air. At the cold end there needs to be
sufficient inlet ventilation
The NPP (Neutral Pressure Plane) in this kind of building is high up because of the lack of inlet
openings high enough below the roof in the oven area. Any opening below that line could lead to
undesired air currents high up in the roof space spreading fumes and dust to where we don’t want it at
all – and that’s in the cold end.
© 2013 Colt International Licensing Ltd.
We can use CFD simulations to solve these kinds of problems. We would look to enlarge the
openings, spread them along the length of the building and make their operation automatic.
© 2013 Colt International Licensing Ltd.

Mais conteúdo relacionado

Mais de Colt UK

CPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtainsCPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtainsColt UK
 
CPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresCPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresColt UK
 
People feel better in colt conditions
People feel better in colt conditions People feel better in colt conditions
People feel better in colt conditions Colt UK
 
CPD Presentation: Pressurisation
CPD Presentation: PressurisationCPD Presentation: Pressurisation
CPD Presentation: PressurisationColt UK
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsColt UK
 
CPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationCPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationColt UK
 
CPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlCPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlColt UK
 
You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?Colt UK
 
Can your factory be more productive?
Can your factory be more productive?Can your factory be more productive?
Can your factory be more productive?Colt UK
 
Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Colt UK
 
When is a U value real?
When is a U value real?When is a U value real?
When is a U value real?Colt UK
 
Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Colt UK
 
The Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksThe Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksColt UK
 
Not all “Class A” weather louvres are equal
Not all “Class A” weather louvres are equalNot all “Class A” weather louvres are equal
Not all “Class A” weather louvres are equalColt UK
 
Green micro-algae façade becomes reality in Hamburg
Green micro-algae façade becomes reality in HamburgGreen micro-algae façade becomes reality in Hamburg
Green micro-algae façade becomes reality in HamburgColt UK
 
The CPR and mandatory CE marking: what is changing and what will it mean for you
The CPR and mandatory CE marking: what is changing and what will it mean for youThe CPR and mandatory CE marking: what is changing and what will it mean for you
The CPR and mandatory CE marking: what is changing and what will it mean for youColt UK
 
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
5 reasons why it’s wrong to use HVAC control systems for smoke ventilationColt UK
 
How to boost your ventilation system’s cooling capacity
How to boost your ventilation system’s cooling capacityHow to boost your ventilation system’s cooling capacity
How to boost your ventilation system’s cooling capacityColt UK
 
Adding attenuation to a Natural Ventilation System retrospectively can be an ...
Adding attenuation to a Natural Ventilation System retrospectively can be an ...Adding attenuation to a Natural Ventilation System retrospectively can be an ...
Adding attenuation to a Natural Ventilation System retrospectively can be an ...Colt UK
 
Construction products regulations – are you ready?
Construction products regulations – are you ready?Construction products regulations – are you ready?
Construction products regulations – are you ready?Colt UK
 

Mais de Colt UK (20)

CPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtainsCPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtains
 
CPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresCPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvres
 
People feel better in colt conditions
People feel better in colt conditions People feel better in colt conditions
People feel better in colt conditions
 
CPD Presentation: Pressurisation
CPD Presentation: PressurisationCPD Presentation: Pressurisation
CPD Presentation: Pressurisation
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using Shafts
 
CPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationCPD Presentation: Car Park Ventilation
CPD Presentation: Car Park Ventilation
 
CPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlCPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke Control
 
You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?
 
Can your factory be more productive?
Can your factory be more productive?Can your factory be more productive?
Can your factory be more productive?
 
Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?
 
When is a U value real?
When is a U value real?When is a U value real?
When is a U value real?
 
Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar
 
The Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksThe Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocks
 
Not all “Class A” weather louvres are equal
Not all “Class A” weather louvres are equalNot all “Class A” weather louvres are equal
Not all “Class A” weather louvres are equal
 
Green micro-algae façade becomes reality in Hamburg
Green micro-algae façade becomes reality in HamburgGreen micro-algae façade becomes reality in Hamburg
Green micro-algae façade becomes reality in Hamburg
 
The CPR and mandatory CE marking: what is changing and what will it mean for you
The CPR and mandatory CE marking: what is changing and what will it mean for youThe CPR and mandatory CE marking: what is changing and what will it mean for you
The CPR and mandatory CE marking: what is changing and what will it mean for you
 
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
5 reasons why it’s wrong to use HVAC control systems for smoke ventilation
 
How to boost your ventilation system’s cooling capacity
How to boost your ventilation system’s cooling capacityHow to boost your ventilation system’s cooling capacity
How to boost your ventilation system’s cooling capacity
 
Adding attenuation to a Natural Ventilation System retrospectively can be an ...
Adding attenuation to a Natural Ventilation System retrospectively can be an ...Adding attenuation to a Natural Ventilation System retrospectively can be an ...
Adding attenuation to a Natural Ventilation System retrospectively can be an ...
 
Construction products regulations – are you ready?
Construction products regulations – are you ready?Construction products regulations – are you ready?
Construction products regulations – are you ready?
 

Último

办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...mrchrns005
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一A SSS
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
cda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptcda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptMaryamAfzal41
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social MediaD SSS
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 

Último (20)

办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
cda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptcda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis ppt
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 

Cooling glass factories: ventilation is a tricky business

  • 1. Cooling glass factories: ventilation is a tricky business Natural gravity ventilation is the best cooling solution The benefits of natural ventilation in large industrial buildings are clear and well accepted: no electricity is needed to operate the system, as it simply uses the energy present in the warm air – and there is plenty of this in a glass factory – and this buoyancy-driven airflow is virtually maintenance free. You can read more about the benefits of natural ventilation in our previous blog post: Natural ventilation is the solution for most heat intensive industries. The issue with ventilating glass factories This said, ventilation in glass factories has always been a hot issue. You need to evacuate the surplus of thermal energy generated by the oven, at the hot end of the factory. However, if this isn’t done exactly right, it might create air currents in the cold end of the factory depositing dust on the brand new glass – a big concern for the quality of your product. Please see below for images which illustrate this point. A well-engineered system is the answer To safeguard the quality of your production, it is important that you rely on experts with specialist experience in the glass industry to design your ventilation system. Every building has its own characteristics and dynamics, depending on its shape, layout and the distribution of the production equipment within the factory. It is critical that the designer has the capacity to get a clear picture of the airflows in and around the building in order to ensure the system efficiently evacuates excess heat from the hot end without creating undesired currents at the cold end. Computational Fluid Dynamics (CFD) simulations carried out by experienced engineers have proven to be invaluable tools to develop and validate a well engineered system. Call in the experts At Colt we have a long history of designing ventilation systems. We have studied a vast number of factories that house production processes that generate extreme heat, such as smelters and glass factories. Over the years we have taken measurements in a wide variety of ambient conditions and completed a large number of CFD analyses, gaining the experience that enables us to get the best possible match between our simulations and the actual measurements. If you would like to evaluate the ventilation system in your glass factory or install a new one, why not get in touch with us and request a free consultation? © 2013 Colt International Licensing Ltd.
  • 2. Here is a section through a glass factory showing the oven area. In this part of the building heat load is significant, sometimes in excess of 20 MW. Natural ventilation allows massive release of heat to the outside. But air leaving through the ventilators needs replacement inlet air. At the cold end there needs to be sufficient inlet ventilation The NPP (Neutral Pressure Plane) in this kind of building is high up because of the lack of inlet openings high enough below the roof in the oven area. Any opening below that line could lead to undesired air currents high up in the roof space spreading fumes and dust to where we don’t want it at all – and that’s in the cold end. © 2013 Colt International Licensing Ltd.
  • 3. We can use CFD simulations to solve these kinds of problems. We would look to enlarge the openings, spread them along the length of the building and make their operation automatic. © 2013 Colt International Licensing Ltd.