AZMET Technology and Projects (Pty) Ltd specialises in
the supply of professional engineering design and project
management services. 
Our services include but is not limited to:
>>	 Project management
>>	 Project engineering and construction
>>	 Project studies
>>	 Production optimisation
>>	 Process plant optimisation and expansions
>>	 Process plant audits
>>	 Project evaluations
>>	 Operations
>>	 Cashflow development and financial modelling
>>	 Testwork management and review
>>	 Modular Gold Desorption and Recovery Plants
>>	 Process Technologies
The main content of this newsletter provides a summary
of work conducted and successfully executed by AZMET
over the past 12 months. Should any of our services be of
interest please do not hesitate to contact us. 
>>From the Directors’ Desk
It’s safe to say that the global mining and metals industry for
2015/2016 has been one of the most volatile ever experienced.
A violent negative ripple effect across the global private sector
was caused by most commodity prices plummeting to record low
trade values resulting in operational closures, budget cuts and
long term stoppages on capital projects. The past 12 months has
seen the unfortunate diminishing and closure of many corporate
engineering firms.
The current global economic crisis is certainly driving profound
changes across the metals and mining industry. Future growth
is recognised through expanded production, with minimal capital
budgets, without losing sight of operational efficiency and cost
optimisation.
This has forced AZMET to pro-actively invest in optimisation
opportunities through engineering innovation and new
technologies and processes that will increase the profitability
of current metallurgical operations.
An AZMET company vision on adding value to our clients was
embedded during the current global recession. This has led
to the development of numerous innovative and cost effective
products and processes that positively impacted on OPEX
and CAPEX for green and brown fields’ projects, converting
uneconomical projects into viable projects.
Working alongside our clients and understanding their needs,
being flexible, timeous and committed to service excellence
made what started out as a year of uncertainty, a year filled
with blessings and growth.
We would like to thank our clients for their support and trust
in AZMET over the past year. We look forward to continue to
add value to your organisations and hopefully will gain more
market share in 2016/17, which by all indications will proof to
be another year filled with challenges.
Regards,
AZMET BOARD OF DIRECTORS
“Excellence through
dedication, motivation and technology
innovation.”
}}
NEWS
AZMET
AZMET’s newsletter
brings you highly targeted
information on project and
process engineering design,
management, technologies
and development
AZMETTECHNOLOGY & PROJECTS
>>Optimising your Operation
Historically most mining companies designed and constructed their
processing facilities with huge safety margins to enable possible
future expansions. However, it is quite a costly exercise to establish
a new mineral processing facility. In today’s recession mining
companies cannot always afford to construct new facilities when
considering significant expansions, but rather investigate ways to
improve on their underutilised processing equipment.
AZMET assist current mining houses to explore expansion
possibilities in their operating processing facilities in the form
of plant evaluations. Once an evaluation has been conducted
AZMET will share its findings and recommendations with the client.
AZMET will then assist in the engineering functions required to
realise these recommendations.
Optimisation Objectives
Major optimisation objectives include but is not limited to:
•	 Minimise Operating Cost (OPEX)
•	 Optimise throughput and/or maximise efficiency
•	 Maximise Recovery
“In Q1, 2015 AZMET was awarded a SMPP contract for the Kibali
operation, in the DRC, to implement the Desliming Cyclone Circuit
which was part of an optimisation project to improve the overall
pumpcell plant recovery. The SMPP contract period ran over
26 weeks, which included procurement, fabrication, shipment,
erection and commissioning. The circuit comprises of two sets
“In Q1, 2015 AZMET was awarded a LSTK contract for the
Tongon operation, in the Ivory Coast, to implement a Gold Room
Scrubber System as part of an optimisation project to clean the
fumes generated in the Gold Room. The LSTK contract included
procurement, fabrication, shipment, erection and commissioning.
The circuit comprises of a vertical scrubber unit complete with an
extraction fan and circulating medium pump. The scrubber unit
tied into the gold room via ducting.
>>Tongon – LSTK Gold Room Scrubber System
>>Kibali – SMPP Desliming Cyclone Project
of cyclone clusters complete with their respective feed, overflow
and underflow systems. Various modifications and tie-ins were
required to retrofit the circuit in the existing gold processing plant.
Approximately three (3) kilometres of HDPE piping were installed.
AZMET started the erection in Q4, 2015 and handed over the
circuit in the same quarter 2015.”
>>2 3 <<
AZMETtechnology & projects
AZMETtechnology & projects
AZMETtechnology & projects
>>Tongon – Quarternary Crusher Upgrade Project
“In Q4, 2015 AZMET was awarded a contract for the Tongon
operation, in the Ivory Coast, to implement a 4th Stage Crushing
Circuit as part of an optimisation project to improve the overall
plant capacity. The contract included procurement, fabrication,
shipment, erection and commissioning. The circuit comprises
of two dewatering screens, a fines transfer tank, a crusher feed
bin and three quarternary cone crushers complete with their
respective feed and discharge conveyors. Two new motor control
centers (MCC’S) were also part of the upgrade project. Various
modifications and tie-ins were required to retrofit the circuit in the
existing crushing plant. AZMET started the erection Q4, 2015 and
completed construction by end of Q1, 2016.”
		
>>Gauteng Fine Carbon Toll Treatment Incineration Project
AZMET was contracted to manage the procurement and installation
of two (2) carbon incinerators for a client in Gauteng. For more
information see article under “Products”.”
>>LSTK Gold Desorption & Recovery Plant for a plant in Ethiopia
AZMET has been awarded a contract for the design, supply
and commissioning for a 2t Carbon Batch Gold Desorption and
Recovery Plant, incorporating Carbon Loading and Attritioning,
Acid wash including Hydrochloric Acid reagent dosing, Elution
including Caustic reagent dosing, Electrowinning, Goldroom, MCC
& PLC and Security.
Modular Modules were ordered for supply and completed
in Q2, 2016.
For more information see article under “Products” or visit our
website to view the product brochure.
>>4 5 <<
AZMETtechnology & projects
AZMETtechnology & projects
AZMETtechnology & projects
AZMETtechnology & projects
AZMETtechnology & projects
>>6 7 <<
“Professional Engineering
Design & Project Management
Services.”
}}
>>LSTK Gold Desorption & Recovery Plant and reagent packages for a
gold mine in Turkey
In Q1,2016 AZMET has been awarded a contract for the
design, supply and commissioning for a 2t Carbon Batch Gold
Desorption and Recovery Plant, incorporating Carbon Loading
and Attritioning, Acid wash, Elution, Electrowinning, Carbon
Regeneration, Mercury Retort, Goldroom (civil design), MCC &
PLC and Security.
Our revolutionary design is of the highest quality and make use
of only reputable mechanical equipment suppliers. AZMET’s
desorption and recovery plants holds numerous CAPEX benefits
which includes, but is not limited to:
In addition to the AZMET DR Plant, modular reagent make-
up and dosing systems formed part of the supply contract,
incorporating Cyanide, Caustic, Lime, Hydrochloric Acid and
Detox (CuSO4 & SMBS).
Modular Modules were ordered for supply with completion
planned for Q4, 2016
For more information see article under “Products” or visit our
website to view the product brochure.
•	 Design cost (EPCM) savings
•	 Reduction in project site establishment and P&G costs
•	 On-site installation and fabrication cost reduction
•	 Overall project schedule reduction
AZMETtechnology & projects
AZMETtechnology & projects
AZMETtechnology & projects
>>8 9 <<
>>AZMET’s Modular Gold Adsorption, Desorption & Recovery Plant (ADR)
AZMET’s Modular Desorption and Recovery Plant for Gold &
Silver hold numerous advantages for the end user and EPCM
contractor. The total modular plant is assembled and cold
commissioned prior to shipment. Thus, the time to install and
hot commission on site is limited with minimal changes. Design
of supply is flexible and can be adjusted according to the client’s
needs; with a total supply consisting of six (6) independent
modules.
Over the past 12 months AZMET has seen a drastic increase
in the clients’ needs for modular plants across the globe. This
again is confirmation of the benefits and project savings that
can be recognised when procuring our plants.
Current execution projects for respective clients and end users
in Austria, Ethiopia and Turkey.
>>Activated carbon incinerator package (fine carbon treatment)
AZMET has identified a need in the gold industry to process
rejected loaded carbon and carbonaceous material. Many a gold
plant has hundreds of tons of rejected loaded carbon.
The reasons for the plant rejecting this carbon can be numerous.
Carbon is often stockpiled due to the fact that a production driven
plant does not always have the spare elution capacity to process
the carbon.
The stockpiled carbon is often stockpiled in the sun and this can
cause the carbon to become extremely brittle.
This potentially brittle carbon cannot be reintroduced into the
normal gold plant carbon circuit due to the risk of gold losses
onto fine carbon within the tails.
AZMET acts as agent for this product and has designed this
product as an addition to the gold desorption and recovery plant.
This product will be able to process this rejected loaded carbon
and carbonaceous material with the following modules:
•	 Attritioning, Grading and Separation Module
•	 Carbon Desorption Module
•	 Carbon Fines Incinerator Module
•	 Goldroom Module
Attritioning, Grading and Separation Module
This module will be used to load the stockpiled carbon from bags
into an attritioning tank where any brittle carbon will be broken
into fine particles.
After attritioning of the carbon, the carbon will be sized on a screen
to separate the carbon into two (2) fractions using a 1mm deck.
The +1mm coarse carbon is then discharged into a bulk bag for
later treatment in the desorption module. The -1mm fine carbon,
which often can contain contaminants like fine silica, is fed to a
spiral to separate the gangue from the carbon. The cleaned -1mm
carbon fines is then discharged into a bulk bag for drying and later
treatment in the carbon fines incinerator.
Carbon Desorption Module
The +1mm coarse carbon is fed from the bulk bags to a
desorption plant where the carbon will be subjected to Acidwash,
Elution and Regeneration. An electrowinning section is also
provided to recover the gold into sludge that can be smelted in
the goldroom module.
The regenerated and sized carbon can then be returned to the
main plant for re-use in the CIP/CIL circuit.
Carbon Fines Incinerator Module
The -1mm fine carbon is sun dried in bulk bags before being fed
into the carbon fines incinerator. The incinerator will be able to
process about 1t/day of carbon fines. The resulting ash from
the incinerator is screw fed to the goldroom module for smelting
in the smelting furnace.
Goldroom Module
Gold sludge from electro-winning is first dried in a calcining
oven before being combined with the ash from the incinerator
for smelting in a smelting furnace.
These combined modules offer an elegant solution to unsightly
large carbon stockpiles that many a mine has to deal with.
These modules have the following benefits:
•	 Recovery of gold lock-up, thus improving plant recovery
•	 Recovery of carbon for re-use in the processing plant, thus
reducing OPEX
•	 Freeing up of precious space on site
•	 Employment opportunity for local labour
Below are a few pictures of the Carbon Incinerator
and Desorption Plant.
AZMETtechnology & projects
AZMETtechnology & projects
AZMETtechnology & projects
>>10 11 <<
Background
This study was conducted to develop an understanding of the
metallurgical and infrastructure requirements for the retreatment
of flotation tailings dams in Zambia.
Summary
Earlier studies identified direct acid leaching as the flowsheet
of choice for the metallurgical plant. Due to very high acid
consumptions during testwork this flowsheet option was
demonstrated as non feasible when assessed economically.
This study considered various flowsheet options and tested
these in the laboratory to identify the reagent consumptions
and recoveries for each. Throughout the testwork phases
the key consideration was to identify a process flowsheet
which resulted in reduced acid consumption or alternative
reagents but at the same time achieved reasonable recoveries
of both copper and cobalt that resulted in an economic viable
project.
The study looked at methods to reduce the reagent utilisation
by identifying conditions under which lower consumption of
reagents was achieved. This thought process was duly followed
in carrying out further testwork. This resulted in the identification
of a flowsheet with shorter leaching times and in particular the total
acid consumption was reduced down to less than 40kg/t.
The chosen flowsheet is simplistically described as:
•	 The recovery of tailings.
•	 AZMET Reduced Leaching (AZ-RLT) of the recovered tailings
with sulphuric acid.
•	 Separation of cobalt and copper in a solvent extraction plant.
•	 Electrowinning of copper to produce a copper cathode.
•	 Cobalt will be precipitated out separately as a cobalt salt.
AZMET’s proprietary Reduced Leach Technology (AZ-RLT)
was used, which resulted in an economical process on the
samples tested.
For more information view “New Technologies & Develpments”
Cu & Co Tailings Retreatment - Overall Flowsheet
>>Cu & Co Tailings Retreatment - Technical Assessment
“Technical solutions
through innovation.”
}}
Background
This Desktop study was conducted to develop an understanding
of the metallurgical requirements for the Treatment of an existing
tailings stockpile in the DRC.
Summary
The establishment of operations for the Stockpile Project is based
upon a simple dry recovery of the tailings from the stockpile using
front end loaders (FEL).
The study assumes that acid leaching will provide the required
dissolutions recovery based on historical sample assay results.
This study considered various flowsheet options which evaluated
conventional direct acid leaching to generate a copper and cobalt
pregnant solution (PLS) that can be sold to the neighbouring
process plants as the base case. Alternative options also
considered a final copper cathode and cobalt precipitate salt to
increase the possible LME value. A high level financial trade-
off resulted in selecting a small plant throughput, with the least
capital cost, but still producing a final copper and cobalt product
for maximum metal revenues.
Different flowsheets were compared. This included the provisional
development of operating and capital costs for each flowsheet as
part of an options study, before a choice was made to take the
preferred flowsheet forward.
>>Cu & Co Stockpile Treatment – Desktop Study
The chosen flowsheet is simplistically described as:
•	 The recovery of material from the stockpile.
•	 Curing and leaching of the recovered stockpile material with
reagents.
•	 Solid/liquid separation.
•	 Separation of copper and cobalt in a solvent extraction plant.
•	 Electrowinning of copper to produce a copper cathode.
•	 Cobalt will be precipitated out separately as a saleable
cobalt salt.
Cu & Co Stockpile Treatment - Overall Flowsheet
“Engineering
solutions for your
requirement.”
}}
AZMET has been focused on the development of new processes and technologies specifically within the
Au, Cu and base metal industries. With the downturn in commodity prices the need for alternative process
routes with lower operating costs increases, as well as finding solutions for “difficult to treat” complex ores.
AZMET has developed the following technologies over the past 12 months; two of these are pending patents:
AZMET has developed on a cost effective process methodology
to recover cyanide from the plant tails stream. This process is
based on proven process technologies that have been used in
the industry for over 50 years. The benefit of this process will
include but not be limited to:
OPEX savings:
•	 Recovery of cyanide.
•	 Eliminating costly detox reagent costs.
•	 Environmental benefit on tailings disposal.
Recovery benefits – Increasing plant economics:
•	 Recovery of Copper, if present in tails stream.
•	 Additional gold recovery from tails solution.
>>AZMET Cyanide Recovery Process
(AZ-CRP)
“Cost effective
process
methodologies.”
}}
AZMET was contracted for the engineering process design, for
the completion of a Refractory Gold Project, Definitive Feasibility
Study (DSF), located in Mozambique.
The Refractory Gold Project process flow consisted of two stage
crushing and ball milling followed by an ultra-fine grind and a
floatation circuit for concentration of the gold.
Flotation concentrate is oxidised through reactors and processed
in a standard gold CIL circuit from where the loaded carbon is
harvested and gold recovered through AZMET’s Modular Gold
Desorption and Recovery Plant.
>>DFS Refractory Gold Project in Mozambique
AZMET’s scope of work included but was not limited to all
process design deliverables to DFS level of accuracy for the
following process unit operations:
•	 Carbon In Leach Circuit (CIL)
•	 AZMET Desorption and Recovery Plant comprising of:
>> Loaded Carbon Handling including Carbon Attritioning
& Transfer
>> Acid wash
>> Elution
>> Electrowinning
>> Goldroom including security
>> Regeneration
>> MCC & PLC
•	 Reagent Packages
>> Lime
>> Cyanide
>> Caustic
>> Hydrochloric Acid
AZMET started the study late Q4 of 2015 and
executed all contractual deliverables early Q1 2016.
M
M M
M M
M M
M M
A
B
C
D
E
F
G
H
Refractory Gold – Overall Flowsheet
DATE DWG NO PROJECT REV
20/04/2016 AZ-XXXX-PR-OFS-00-02 Refractory Gold DFS 0D
SHEET 1 OF 1
D
C
B
A
4 3 2 1
D
C
B
A
4 3 2 1
M
Gravity
Concentrator
M
M
M
M
M
M
M
M
M
M M
M M
To Fine
Grind Mill
Pre-leach
Thickener
M
Gravity Conc
Process Water
Header
TSF
Flotation
CIL
DR Plant
Ball Mill
Crushing
Fine Grind Mill
Leach
Conditioning
Mill Stockpile
M
Concentrate
Thickener
M
Process Water
Fresh Dilution
Water
Refractory Gold Project - Typical flowsheet
“Your partner
in mineral
beneficiation.”
}}
>>12 13 <<
A
B
C
D
E
F
G
H
M
M
M
M
M
M
M
Cyanide Recovery Process - Flowsheet
“Technology that provides
increased recovery and lower
operating costs.”
}}
>>AZMET Basic Leach Technology
(AZ-BLT)
AZMET has developed a cost effective process route to recover
copper from low grade secondary copper minerals utilising a
basic leach process. The process can be used on existing tailings
dumps and on the tails streams of operating flotation plants
treating Supergene ores (secondary or cyanide soluble copper).
This process is based on proven process technologies that have
been used in the industry and has been optimised to provide
lower operating and capital cost requirements. The benefit of
this process will include but not be limited to:
•	 A process circuit for the treatment of both copper and precious
metals.
•	 Simpler mine plan for complex ores (copper with gold and
silver).
•	 OPEX savings.
•	 CAPEX savings.
>>AZMET Reduced Leach
Technology (AZ-RLT)
AZMET has developed an acid leach process for the beneficiation
of base metal complexed ores, using a combination of proven
technologies that has been used in the mining industry for more
than 20 years.
The process which is AZMET’s proprietary process can be tested
in our partner laboratories and holds the following benefits:
•	 Reduced leach retention times compared to conventional
leaching.
•	 Reduction in reagent consumptions which results in the cost
effective processing of “difficult to treat” ore bodies.
•	 Lower CAPEX requirement compared to conventional acid
leaching.
Primary classification inefficiencies should be a problem of
the past!
Ultra-fine screening technology has developed in recent
years and can be successfully installed as a reliable primary
classification processing unit.
Although a larger footprint will be required, the comminution and
recovery benefits to date have shown project CAPEX payback
periods from as little as a couple of months.
In addition, the additional mill capacity created as a result of
improved classification efficiency can be utilised by either a finer
mill product grind or additional ROM throughput.
AZMET has developed an IP test procedure in which the
comparative hydrocyclone vs ultrafine screening testwork can
be conducted. The testwork results together with the client’s
plant operating data is used to conduct trade-off and financial
models which will indicate the possible payback period and NPV
on implementing such a change.
The principal advantages are:
•	 Higher classification efficiency.
•	 Lower maintenance in mill circuit.
•	 Substantial reduction in recirculating load (up to 500%
reduction).
•	 Finer grind achievable through utilisation of available power.
OR
•	 Additional throughput (up to 40% ROM)
•	 Less overgrinding of metal fines resulting in flotation recovery
benefits (up to 9% increase)
•	 Eliminates ultrafine metal medium formation in cyclones
AZMET’s latest test results has shown a considerable increase
in recoveries on base metals.
Contact AZMET should this technology be of immediate interest.
>>Ultra-fine Screening Classification Testwork Procedure (AZ-UFS)
“Primary classification
deficiencies are a
problem of the past.”
}}
>>14 15 <<
>>Azmet Offices
retain the vibrant and professional culture nurtured by AZMET
management.
The new office space also allows for the expected growth of AZMET,
and enables the company to ensure the continued delivery of great
service to their existing and future clients.
The sustained growth of AZMET, has forced the dynamic company
to relocate to new offices mid-2015. The new modern building is
situated close to the R21, in Glen Eagle Office Park, centrally located
between Johannesburg and Pretoria.
Office layout was done in an open plan manner to enable
collaboration and flow of ideas between staff, and in doing so,
AZMETtechnology & projects
AZMETtechnology & projects
>>New Employees
Johan Bezuidenhout
With 15+ years in the construction industry
Johan is a valuable addition to the AZMET
team. He has over 5 years’ industry re-
lated experience in project management,
plant construction and commissioning. By
combining his experience with his organ-
isational and technical skills he has suc-
cessfully completed multiple projects and
looks forward to many more at AZMET. He
has recently completed a diploma in project
management. Johan brings a dynamic and
innovative force to the AZMET team.
Nadia Scapin
Nadia joined AZMET with 10+ years’
experience in project management,
contract management, plant design,
bulk materials handling, conveyor de-
sign, cost estimation, feasibility stud-
ies, construction and commissioning.
Her qualifications include B. Eng (Mech),
B. Eng (Management of Technology),
Post graduate diploma in Project and
Program Management, and CMII (Configu-
ration Management) certification.
Liza Jacobs
Liza has joined the AZMET team
with 10 years’ experience in project
and contract administration. She has
worked on international and local proj-
ects pertaining to bulk materials han-
dling, process plants, turnkey projects
and feasibility studies. Liza is currently
busy obtaining her contracts law degree.
>> contact
details
Anton Botha
Anton joined AZMET with technical
background in mechanical draughting.
He has been working with the AZMET
team to develop and design plants us-
ing 3D modelling. Furthermore he
has taken an interest in SHEQ and com-
pleted the Samtrac training. He has since
registered as a OHS practitioner and tech-
nical member at both the South African and
British Institute of Occupational Safety and
Health. Anton’s goal to complete projects
safely forms part of a core value of “safety
first” at AZMET.
Jaques Teessen
Jaques joined AZMET with a sound funda-
mental understanding in mineral process
engineering. He incorporates practical
limitations and customer demands into
complex mathematical models for various
metallurgical processes and equipment.
This gives AZMET the ability to optimize
and design processes in an accurate, cost
effective and efficient manner. He holds a
BEng(Chemical) degree and is currently
busy obtaining his Honours and Masters
degree in Metallurgy. Jaques forms an in-
strumental part of AZMET’s drive to new
process technologies, innovative thinking
and process systems’ development.
tel	 +27 86 11AZMET (29638)
fax	 +27 86 628 5610
email	 info@azmet.co.za
	ruan@azmet.co.za
web	 www.azmet.co.za
AZMETtechnology & projects

Mais conteúdo relacionado

Mais procurados

PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCO
HITESH RATHOD
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
Edward Byrne
 
AUSTROPLAN_References_Cement 2014
AUSTROPLAN_References_Cement 2014AUSTROPLAN_References_Cement 2014
AUSTROPLAN_References_Cement 2014
Cheryl Schultze
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
Jamal Jamil
 
Projects - senior machinery engineer
Projects - senior machinery engineerProjects - senior machinery engineer
Projects - senior machinery engineer
Chris Owen
 
CV_Mark Fayle _Brief
CV_Mark Fayle _BriefCV_Mark Fayle _Brief
CV_Mark Fayle _Brief
Mark Fayle
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan
 

Mais procurados (18)

News Release: Commerce Resources Corp. Initiates Pilot Plant for the Ashram ...
News Release:  Commerce Resources Corp. Initiates Pilot Plant for the Ashram ...News Release:  Commerce Resources Corp. Initiates Pilot Plant for the Ashram ...
News Release: Commerce Resources Corp. Initiates Pilot Plant for the Ashram ...
 
E&C Profilep123
E&C Profilep123E&C Profilep123
E&C Profilep123
 
78-83-NovDec12
78-83-NovDec1278-83-NovDec12
78-83-NovDec12
 
LNG Cap - Jan 2016
LNG Cap - Jan 2016LNG Cap - Jan 2016
LNG Cap - Jan 2016
 
PROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCOPROJECT PROFILE ANNEXURE A2 QAPCO
PROJECT PROFILE ANNEXURE A2 QAPCO
 
Fact sheet-sulphur
Fact sheet-sulphurFact sheet-sulphur
Fact sheet-sulphur
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
Clough Enercore Brochure
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
Improving Offshore Production Whitepaper
 Improving Offshore Production Whitepaper Improving Offshore Production Whitepaper
Improving Offshore Production Whitepaper
 
Fjords processing corporate presentation
Fjords processing corporate presentationFjords processing corporate presentation
Fjords processing corporate presentation
 
Wellstream Processing sales presentation
Wellstream Processing sales presentation Wellstream Processing sales presentation
Wellstream Processing sales presentation
 
AUSTROPLAN_References_Cement 2014
AUSTROPLAN_References_Cement 2014AUSTROPLAN_References_Cement 2014
AUSTROPLAN_References_Cement 2014
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
Projects - senior machinery engineer
Projects - senior machinery engineerProjects - senior machinery engineer
Projects - senior machinery engineer
 
CV_Mark Fayle _Brief
CV_Mark Fayle _BriefCV_Mark Fayle _Brief
CV_Mark Fayle _Brief
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 

Destaque

Brochure Final v8
Brochure Final v8Brochure Final v8
Brochure Final v8
Debbie Todd
 
Hpe Corporate Brochure W2016
Hpe Corporate Brochure W2016Hpe Corporate Brochure W2016
Hpe Corporate Brochure W2016
Meena Bains
 

Destaque (20)

Valentina Hernandez!
Valentina Hernandez!Valentina Hernandez!
Valentina Hernandez!
 
Diapostiva
DiapostivaDiapostiva
Diapostiva
 
Christians first university
Christians first universityChristians first university
Christians first university
 
la computadora y sus partes
la computadora y sus partesla computadora y sus partes
la computadora y sus partes
 
Brochure Final v8
Brochure Final v8Brochure Final v8
Brochure Final v8
 
Metodo navarrete
Metodo  navarreteMetodo  navarrete
Metodo navarrete
 
za
zaza
za
 
Gmail manual avanzado
Gmail manual avanzadoGmail manual avanzado
Gmail manual avanzado
 
Progress powerpoint final
Progress powerpoint final Progress powerpoint final
Progress powerpoint final
 
Constructivism theory (narrated)
Constructivism theory (narrated)Constructivism theory (narrated)
Constructivism theory (narrated)
 
Prueba de informatica mateo haro
Prueba de informatica mateo haroPrueba de informatica mateo haro
Prueba de informatica mateo haro
 
Test slide show2
Test slide show2Test slide show2
Test slide show2
 
AEMEX Presentation4 pdf
AEMEX Presentation4 pdfAEMEX Presentation4 pdf
AEMEX Presentation4 pdf
 
Kelebogile Mofokeng (1)
Kelebogile Mofokeng (1)Kelebogile Mofokeng (1)
Kelebogile Mofokeng (1)
 
LedZep
LedZepLedZep
LedZep
 
Racism issues tv
Racism issues tvRacism issues tv
Racism issues tv
 
Paginas web
Paginas webPaginas web
Paginas web
 
Hpe Corporate Brochure W2016
Hpe Corporate Brochure W2016Hpe Corporate Brochure W2016
Hpe Corporate Brochure W2016
 
Architecutre 4
Architecutre 4Architecutre 4
Architecutre 4
 
Amostra Comunicação - Construção Civil
Amostra Comunicação - Construção CivilAmostra Comunicação - Construção Civil
Amostra Comunicação - Construção Civil
 

Semelhante a AZMET-Newsletter 2016-17

AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)
Ruan Kukard
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
Ruan Kukard
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
Braam Smit
 
AZMET DR Plant Brochure
AZMET DR Plant BrochureAZMET DR Plant Brochure
AZMET DR Plant Brochure
Ruan Kukard
 
AZMET-DR Product Brochure
AZMET-DR Product BrochureAZMET-DR Product Brochure
AZMET-DR Product Brochure
Barry Beylefeld
 
AZMET DR Plant Brochure
AZMET DR Plant BrochureAZMET DR Plant Brochure
AZMET DR Plant Brochure
Braam Smit
 
Qatargas debottlenecking project
Qatargas debottlenecking projectQatargas debottlenecking project
Qatargas debottlenecking project
John Kingsley
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
Nitin Sethi
 
Development of Tight Gas Fields
Development of Tight Gas FieldsDevelopment of Tight Gas Fields
Development of Tight Gas Fields
Neil Barnard
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
Austin Antony
 

Semelhante a AZMET-Newsletter 2016-17 (20)

AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
 
AMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycleAMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycle
 
AZMET DR Plant Brochure
AZMET DR Plant BrochureAZMET DR Plant Brochure
AZMET DR Plant Brochure
 
AZMET-DR Product Brochure
AZMET-DR Product BrochureAZMET-DR Product Brochure
AZMET-DR Product Brochure
 
AZMET DR Plant Brochure
AZMET DR Plant BrochureAZMET DR Plant Brochure
AZMET DR Plant Brochure
 
Turnkey Company Presentation Feb 2024.pptx
Turnkey Company Presentation Feb 2024.pptxTurnkey Company Presentation Feb 2024.pptx
Turnkey Company Presentation Feb 2024.pptx
 
Qatargas debottlenecking project
Qatargas debottlenecking projectQatargas debottlenecking project
Qatargas debottlenecking project
 
Webinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experienceWebinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experience
 
OGP Awards 2011
OGP Awards 2011OGP Awards 2011
OGP Awards 2011
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfA1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdf
 
Development of Tight Gas Fields
Development of Tight Gas FieldsDevelopment of Tight Gas Fields
Development of Tight Gas Fields
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.
 
New base 12 june 2018 energy news issue 1180 by khaled al awadi
New base 12 june 2018 energy news issue   1180  by khaled al awadiNew base 12 june 2018 energy news issue   1180  by khaled al awadi
New base 12 june 2018 energy news issue 1180 by khaled al awadi
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
 
I Bytes Manufacturing Industry
I Bytes Manufacturing IndustryI Bytes Manufacturing Industry
I Bytes Manufacturing Industry
 

AZMET-Newsletter 2016-17

  • 1. AZMET Technology and Projects (Pty) Ltd specialises in the supply of professional engineering design and project management services.  Our services include but is not limited to: >> Project management >> Project engineering and construction >> Project studies >> Production optimisation >> Process plant optimisation and expansions >> Process plant audits >> Project evaluations >> Operations >> Cashflow development and financial modelling >> Testwork management and review >> Modular Gold Desorption and Recovery Plants >> Process Technologies The main content of this newsletter provides a summary of work conducted and successfully executed by AZMET over the past 12 months. Should any of our services be of interest please do not hesitate to contact us.  >>From the Directors’ Desk It’s safe to say that the global mining and metals industry for 2015/2016 has been one of the most volatile ever experienced. A violent negative ripple effect across the global private sector was caused by most commodity prices plummeting to record low trade values resulting in operational closures, budget cuts and long term stoppages on capital projects. The past 12 months has seen the unfortunate diminishing and closure of many corporate engineering firms. The current global economic crisis is certainly driving profound changes across the metals and mining industry. Future growth is recognised through expanded production, with minimal capital budgets, without losing sight of operational efficiency and cost optimisation. This has forced AZMET to pro-actively invest in optimisation opportunities through engineering innovation and new technologies and processes that will increase the profitability of current metallurgical operations. An AZMET company vision on adding value to our clients was embedded during the current global recession. This has led to the development of numerous innovative and cost effective products and processes that positively impacted on OPEX and CAPEX for green and brown fields’ projects, converting uneconomical projects into viable projects. Working alongside our clients and understanding their needs, being flexible, timeous and committed to service excellence made what started out as a year of uncertainty, a year filled with blessings and growth. We would like to thank our clients for their support and trust in AZMET over the past year. We look forward to continue to add value to your organisations and hopefully will gain more market share in 2016/17, which by all indications will proof to be another year filled with challenges. Regards, AZMET BOARD OF DIRECTORS “Excellence through dedication, motivation and technology innovation.” }} NEWS AZMET AZMET’s newsletter brings you highly targeted information on project and process engineering design, management, technologies and development AZMETTECHNOLOGY & PROJECTS
  • 2. >>Optimising your Operation Historically most mining companies designed and constructed their processing facilities with huge safety margins to enable possible future expansions. However, it is quite a costly exercise to establish a new mineral processing facility. In today’s recession mining companies cannot always afford to construct new facilities when considering significant expansions, but rather investigate ways to improve on their underutilised processing equipment. AZMET assist current mining houses to explore expansion possibilities in their operating processing facilities in the form of plant evaluations. Once an evaluation has been conducted AZMET will share its findings and recommendations with the client. AZMET will then assist in the engineering functions required to realise these recommendations. Optimisation Objectives Major optimisation objectives include but is not limited to: • Minimise Operating Cost (OPEX) • Optimise throughput and/or maximise efficiency • Maximise Recovery “In Q1, 2015 AZMET was awarded a SMPP contract for the Kibali operation, in the DRC, to implement the Desliming Cyclone Circuit which was part of an optimisation project to improve the overall pumpcell plant recovery. The SMPP contract period ran over 26 weeks, which included procurement, fabrication, shipment, erection and commissioning. The circuit comprises of two sets “In Q1, 2015 AZMET was awarded a LSTK contract for the Tongon operation, in the Ivory Coast, to implement a Gold Room Scrubber System as part of an optimisation project to clean the fumes generated in the Gold Room. The LSTK contract included procurement, fabrication, shipment, erection and commissioning. The circuit comprises of a vertical scrubber unit complete with an extraction fan and circulating medium pump. The scrubber unit tied into the gold room via ducting. >>Tongon – LSTK Gold Room Scrubber System >>Kibali – SMPP Desliming Cyclone Project of cyclone clusters complete with their respective feed, overflow and underflow systems. Various modifications and tie-ins were required to retrofit the circuit in the existing gold processing plant. Approximately three (3) kilometres of HDPE piping were installed. AZMET started the erection in Q4, 2015 and handed over the circuit in the same quarter 2015.” >>2 3 << AZMETtechnology & projects AZMETtechnology & projects AZMETtechnology & projects
  • 3. >>Tongon – Quarternary Crusher Upgrade Project “In Q4, 2015 AZMET was awarded a contract for the Tongon operation, in the Ivory Coast, to implement a 4th Stage Crushing Circuit as part of an optimisation project to improve the overall plant capacity. The contract included procurement, fabrication, shipment, erection and commissioning. The circuit comprises of two dewatering screens, a fines transfer tank, a crusher feed bin and three quarternary cone crushers complete with their respective feed and discharge conveyors. Two new motor control centers (MCC’S) were also part of the upgrade project. Various modifications and tie-ins were required to retrofit the circuit in the existing crushing plant. AZMET started the erection Q4, 2015 and completed construction by end of Q1, 2016.” >>Gauteng Fine Carbon Toll Treatment Incineration Project AZMET was contracted to manage the procurement and installation of two (2) carbon incinerators for a client in Gauteng. For more information see article under “Products”.” >>LSTK Gold Desorption & Recovery Plant for a plant in Ethiopia AZMET has been awarded a contract for the design, supply and commissioning for a 2t Carbon Batch Gold Desorption and Recovery Plant, incorporating Carbon Loading and Attritioning, Acid wash including Hydrochloric Acid reagent dosing, Elution including Caustic reagent dosing, Electrowinning, Goldroom, MCC & PLC and Security. Modular Modules were ordered for supply and completed in Q2, 2016. For more information see article under “Products” or visit our website to view the product brochure. >>4 5 << AZMETtechnology & projects AZMETtechnology & projects AZMETtechnology & projects AZMETtechnology & projects AZMETtechnology & projects
  • 4. >>6 7 << “Professional Engineering Design & Project Management Services.” }} >>LSTK Gold Desorption & Recovery Plant and reagent packages for a gold mine in Turkey In Q1,2016 AZMET has been awarded a contract for the design, supply and commissioning for a 2t Carbon Batch Gold Desorption and Recovery Plant, incorporating Carbon Loading and Attritioning, Acid wash, Elution, Electrowinning, Carbon Regeneration, Mercury Retort, Goldroom (civil design), MCC & PLC and Security. Our revolutionary design is of the highest quality and make use of only reputable mechanical equipment suppliers. AZMET’s desorption and recovery plants holds numerous CAPEX benefits which includes, but is not limited to: In addition to the AZMET DR Plant, modular reagent make- up and dosing systems formed part of the supply contract, incorporating Cyanide, Caustic, Lime, Hydrochloric Acid and Detox (CuSO4 & SMBS). Modular Modules were ordered for supply with completion planned for Q4, 2016 For more information see article under “Products” or visit our website to view the product brochure. • Design cost (EPCM) savings • Reduction in project site establishment and P&G costs • On-site installation and fabrication cost reduction • Overall project schedule reduction AZMETtechnology & projects AZMETtechnology & projects AZMETtechnology & projects
  • 5. >>8 9 << >>AZMET’s Modular Gold Adsorption, Desorption & Recovery Plant (ADR) AZMET’s Modular Desorption and Recovery Plant for Gold & Silver hold numerous advantages for the end user and EPCM contractor. The total modular plant is assembled and cold commissioned prior to shipment. Thus, the time to install and hot commission on site is limited with minimal changes. Design of supply is flexible and can be adjusted according to the client’s needs; with a total supply consisting of six (6) independent modules. Over the past 12 months AZMET has seen a drastic increase in the clients’ needs for modular plants across the globe. This again is confirmation of the benefits and project savings that can be recognised when procuring our plants. Current execution projects for respective clients and end users in Austria, Ethiopia and Turkey. >>Activated carbon incinerator package (fine carbon treatment) AZMET has identified a need in the gold industry to process rejected loaded carbon and carbonaceous material. Many a gold plant has hundreds of tons of rejected loaded carbon. The reasons for the plant rejecting this carbon can be numerous. Carbon is often stockpiled due to the fact that a production driven plant does not always have the spare elution capacity to process the carbon. The stockpiled carbon is often stockpiled in the sun and this can cause the carbon to become extremely brittle. This potentially brittle carbon cannot be reintroduced into the normal gold plant carbon circuit due to the risk of gold losses onto fine carbon within the tails. AZMET acts as agent for this product and has designed this product as an addition to the gold desorption and recovery plant. This product will be able to process this rejected loaded carbon and carbonaceous material with the following modules: • Attritioning, Grading and Separation Module • Carbon Desorption Module • Carbon Fines Incinerator Module • Goldroom Module Attritioning, Grading and Separation Module This module will be used to load the stockpiled carbon from bags into an attritioning tank where any brittle carbon will be broken into fine particles. After attritioning of the carbon, the carbon will be sized on a screen to separate the carbon into two (2) fractions using a 1mm deck. The +1mm coarse carbon is then discharged into a bulk bag for later treatment in the desorption module. The -1mm fine carbon, which often can contain contaminants like fine silica, is fed to a spiral to separate the gangue from the carbon. The cleaned -1mm carbon fines is then discharged into a bulk bag for drying and later treatment in the carbon fines incinerator. Carbon Desorption Module The +1mm coarse carbon is fed from the bulk bags to a desorption plant where the carbon will be subjected to Acidwash, Elution and Regeneration. An electrowinning section is also provided to recover the gold into sludge that can be smelted in the goldroom module. The regenerated and sized carbon can then be returned to the main plant for re-use in the CIP/CIL circuit. Carbon Fines Incinerator Module The -1mm fine carbon is sun dried in bulk bags before being fed into the carbon fines incinerator. The incinerator will be able to process about 1t/day of carbon fines. The resulting ash from the incinerator is screw fed to the goldroom module for smelting in the smelting furnace. Goldroom Module Gold sludge from electro-winning is first dried in a calcining oven before being combined with the ash from the incinerator for smelting in a smelting furnace. These combined modules offer an elegant solution to unsightly large carbon stockpiles that many a mine has to deal with. These modules have the following benefits: • Recovery of gold lock-up, thus improving plant recovery • Recovery of carbon for re-use in the processing plant, thus reducing OPEX • Freeing up of precious space on site • Employment opportunity for local labour Below are a few pictures of the Carbon Incinerator and Desorption Plant. AZMETtechnology & projects AZMETtechnology & projects AZMETtechnology & projects
  • 6. >>10 11 << Background This study was conducted to develop an understanding of the metallurgical and infrastructure requirements for the retreatment of flotation tailings dams in Zambia. Summary Earlier studies identified direct acid leaching as the flowsheet of choice for the metallurgical plant. Due to very high acid consumptions during testwork this flowsheet option was demonstrated as non feasible when assessed economically. This study considered various flowsheet options and tested these in the laboratory to identify the reagent consumptions and recoveries for each. Throughout the testwork phases the key consideration was to identify a process flowsheet which resulted in reduced acid consumption or alternative reagents but at the same time achieved reasonable recoveries of both copper and cobalt that resulted in an economic viable project. The study looked at methods to reduce the reagent utilisation by identifying conditions under which lower consumption of reagents was achieved. This thought process was duly followed in carrying out further testwork. This resulted in the identification of a flowsheet with shorter leaching times and in particular the total acid consumption was reduced down to less than 40kg/t. The chosen flowsheet is simplistically described as: • The recovery of tailings. • AZMET Reduced Leaching (AZ-RLT) of the recovered tailings with sulphuric acid. • Separation of cobalt and copper in a solvent extraction plant. • Electrowinning of copper to produce a copper cathode. • Cobalt will be precipitated out separately as a cobalt salt. AZMET’s proprietary Reduced Leach Technology (AZ-RLT) was used, which resulted in an economical process on the samples tested. For more information view “New Technologies & Develpments” Cu & Co Tailings Retreatment - Overall Flowsheet >>Cu & Co Tailings Retreatment - Technical Assessment “Technical solutions through innovation.” }} Background This Desktop study was conducted to develop an understanding of the metallurgical requirements for the Treatment of an existing tailings stockpile in the DRC. Summary The establishment of operations for the Stockpile Project is based upon a simple dry recovery of the tailings from the stockpile using front end loaders (FEL). The study assumes that acid leaching will provide the required dissolutions recovery based on historical sample assay results. This study considered various flowsheet options which evaluated conventional direct acid leaching to generate a copper and cobalt pregnant solution (PLS) that can be sold to the neighbouring process plants as the base case. Alternative options also considered a final copper cathode and cobalt precipitate salt to increase the possible LME value. A high level financial trade- off resulted in selecting a small plant throughput, with the least capital cost, but still producing a final copper and cobalt product for maximum metal revenues. Different flowsheets were compared. This included the provisional development of operating and capital costs for each flowsheet as part of an options study, before a choice was made to take the preferred flowsheet forward. >>Cu & Co Stockpile Treatment – Desktop Study The chosen flowsheet is simplistically described as: • The recovery of material from the stockpile. • Curing and leaching of the recovered stockpile material with reagents. • Solid/liquid separation. • Separation of copper and cobalt in a solvent extraction plant. • Electrowinning of copper to produce a copper cathode. • Cobalt will be precipitated out separately as a saleable cobalt salt. Cu & Co Stockpile Treatment - Overall Flowsheet “Engineering solutions for your requirement.” }}
  • 7. AZMET has been focused on the development of new processes and technologies specifically within the Au, Cu and base metal industries. With the downturn in commodity prices the need for alternative process routes with lower operating costs increases, as well as finding solutions for “difficult to treat” complex ores. AZMET has developed the following technologies over the past 12 months; two of these are pending patents: AZMET has developed on a cost effective process methodology to recover cyanide from the plant tails stream. This process is based on proven process technologies that have been used in the industry for over 50 years. The benefit of this process will include but not be limited to: OPEX savings: • Recovery of cyanide. • Eliminating costly detox reagent costs. • Environmental benefit on tailings disposal. Recovery benefits – Increasing plant economics: • Recovery of Copper, if present in tails stream. • Additional gold recovery from tails solution. >>AZMET Cyanide Recovery Process (AZ-CRP) “Cost effective process methodologies.” }} AZMET was contracted for the engineering process design, for the completion of a Refractory Gold Project, Definitive Feasibility Study (DSF), located in Mozambique. The Refractory Gold Project process flow consisted of two stage crushing and ball milling followed by an ultra-fine grind and a floatation circuit for concentration of the gold. Flotation concentrate is oxidised through reactors and processed in a standard gold CIL circuit from where the loaded carbon is harvested and gold recovered through AZMET’s Modular Gold Desorption and Recovery Plant. >>DFS Refractory Gold Project in Mozambique AZMET’s scope of work included but was not limited to all process design deliverables to DFS level of accuracy for the following process unit operations: • Carbon In Leach Circuit (CIL) • AZMET Desorption and Recovery Plant comprising of: >> Loaded Carbon Handling including Carbon Attritioning & Transfer >> Acid wash >> Elution >> Electrowinning >> Goldroom including security >> Regeneration >> MCC & PLC • Reagent Packages >> Lime >> Cyanide >> Caustic >> Hydrochloric Acid AZMET started the study late Q4 of 2015 and executed all contractual deliverables early Q1 2016. M M M M M M M M M A B C D E F G H Refractory Gold – Overall Flowsheet DATE DWG NO PROJECT REV 20/04/2016 AZ-XXXX-PR-OFS-00-02 Refractory Gold DFS 0D SHEET 1 OF 1 D C B A 4 3 2 1 D C B A 4 3 2 1 M Gravity Concentrator M M M M M M M M M M M M M To Fine Grind Mill Pre-leach Thickener M Gravity Conc Process Water Header TSF Flotation CIL DR Plant Ball Mill Crushing Fine Grind Mill Leach Conditioning Mill Stockpile M Concentrate Thickener M Process Water Fresh Dilution Water Refractory Gold Project - Typical flowsheet “Your partner in mineral beneficiation.” }} >>12 13 << A B C D E F G H M M M M M M M Cyanide Recovery Process - Flowsheet
  • 8. “Technology that provides increased recovery and lower operating costs.” }} >>AZMET Basic Leach Technology (AZ-BLT) AZMET has developed a cost effective process route to recover copper from low grade secondary copper minerals utilising a basic leach process. The process can be used on existing tailings dumps and on the tails streams of operating flotation plants treating Supergene ores (secondary or cyanide soluble copper). This process is based on proven process technologies that have been used in the industry and has been optimised to provide lower operating and capital cost requirements. The benefit of this process will include but not be limited to: • A process circuit for the treatment of both copper and precious metals. • Simpler mine plan for complex ores (copper with gold and silver). • OPEX savings. • CAPEX savings. >>AZMET Reduced Leach Technology (AZ-RLT) AZMET has developed an acid leach process for the beneficiation of base metal complexed ores, using a combination of proven technologies that has been used in the mining industry for more than 20 years. The process which is AZMET’s proprietary process can be tested in our partner laboratories and holds the following benefits: • Reduced leach retention times compared to conventional leaching. • Reduction in reagent consumptions which results in the cost effective processing of “difficult to treat” ore bodies. • Lower CAPEX requirement compared to conventional acid leaching. Primary classification inefficiencies should be a problem of the past! Ultra-fine screening technology has developed in recent years and can be successfully installed as a reliable primary classification processing unit. Although a larger footprint will be required, the comminution and recovery benefits to date have shown project CAPEX payback periods from as little as a couple of months. In addition, the additional mill capacity created as a result of improved classification efficiency can be utilised by either a finer mill product grind or additional ROM throughput. AZMET has developed an IP test procedure in which the comparative hydrocyclone vs ultrafine screening testwork can be conducted. The testwork results together with the client’s plant operating data is used to conduct trade-off and financial models which will indicate the possible payback period and NPV on implementing such a change. The principal advantages are: • Higher classification efficiency. • Lower maintenance in mill circuit. • Substantial reduction in recirculating load (up to 500% reduction). • Finer grind achievable through utilisation of available power. OR • Additional throughput (up to 40% ROM) • Less overgrinding of metal fines resulting in flotation recovery benefits (up to 9% increase) • Eliminates ultrafine metal medium formation in cyclones AZMET’s latest test results has shown a considerable increase in recoveries on base metals. Contact AZMET should this technology be of immediate interest. >>Ultra-fine Screening Classification Testwork Procedure (AZ-UFS) “Primary classification deficiencies are a problem of the past.” }} >>14 15 << >>Azmet Offices retain the vibrant and professional culture nurtured by AZMET management. The new office space also allows for the expected growth of AZMET, and enables the company to ensure the continued delivery of great service to their existing and future clients. The sustained growth of AZMET, has forced the dynamic company to relocate to new offices mid-2015. The new modern building is situated close to the R21, in Glen Eagle Office Park, centrally located between Johannesburg and Pretoria. Office layout was done in an open plan manner to enable collaboration and flow of ideas between staff, and in doing so, AZMETtechnology & projects AZMETtechnology & projects
  • 9. >>New Employees Johan Bezuidenhout With 15+ years in the construction industry Johan is a valuable addition to the AZMET team. He has over 5 years’ industry re- lated experience in project management, plant construction and commissioning. By combining his experience with his organ- isational and technical skills he has suc- cessfully completed multiple projects and looks forward to many more at AZMET. He has recently completed a diploma in project management. Johan brings a dynamic and innovative force to the AZMET team. Nadia Scapin Nadia joined AZMET with 10+ years’ experience in project management, contract management, plant design, bulk materials handling, conveyor de- sign, cost estimation, feasibility stud- ies, construction and commissioning. Her qualifications include B. Eng (Mech), B. Eng (Management of Technology), Post graduate diploma in Project and Program Management, and CMII (Configu- ration Management) certification. Liza Jacobs Liza has joined the AZMET team with 10 years’ experience in project and contract administration. She has worked on international and local proj- ects pertaining to bulk materials han- dling, process plants, turnkey projects and feasibility studies. Liza is currently busy obtaining her contracts law degree. >> contact details Anton Botha Anton joined AZMET with technical background in mechanical draughting. He has been working with the AZMET team to develop and design plants us- ing 3D modelling. Furthermore he has taken an interest in SHEQ and com- pleted the Samtrac training. He has since registered as a OHS practitioner and tech- nical member at both the South African and British Institute of Occupational Safety and Health. Anton’s goal to complete projects safely forms part of a core value of “safety first” at AZMET. Jaques Teessen Jaques joined AZMET with a sound funda- mental understanding in mineral process engineering. He incorporates practical limitations and customer demands into complex mathematical models for various metallurgical processes and equipment. This gives AZMET the ability to optimize and design processes in an accurate, cost effective and efficient manner. He holds a BEng(Chemical) degree and is currently busy obtaining his Honours and Masters degree in Metallurgy. Jaques forms an in- strumental part of AZMET’s drive to new process technologies, innovative thinking and process systems’ development. tel +27 86 11AZMET (29638) fax +27 86 628 5610 email info@azmet.co.za ruan@azmet.co.za web www.azmet.co.za AZMETtechnology & projects