Observation from Promoting
                             Sustainable Hydropower Best
                                       Practices
                                        Wu Yusong
                                Coordinator for Upper Mekong
                                        Programme
© Michel Roggo / WWF-Canon




                                 WWF China, 14th. Nov 2012
                                                               1
Outline
•   Why WWF China works on this?
•   How WWF China works on this?
•   What did WWF China do?
•   Findings
•   Recommendation for actions




                                   16 November 2012 - 2
WHY WWF CHINA WORKS ON THIS?
Why
• Global Water Security Initiative in WWF
  International
• The key rivers/watersheds in China,
  Yangtze and Lancang/Upper Mekong
• In Lancang/Upper Mekong, by 2020, the
  physical integrity of rivers and adjoining
  wildlife habitats in the Upper Mekong
  basin are safeguarded against threats
  from infrastructure development,
  mining, forestry, agriculture, and climate
  change.
Why

• One of the few organizations which
  work upper and lower.
• work across borders to tackle joint
  regional priorities by bringing
  together key stakeholders of all the
  Mekong river countries
HOW WWF CHINA WORKS ON THIS?
HOW

• Scientific based
• Research+Demonstration+Policy advocacy
• Facilitate experiences and information
  sharing
• Promote communication and dialogue
• Work with multi partners
• Work at different levels
• Explore and provide constructive solutions
WHAT DID WWF CHINA DO?
Introduce international standards




                                    16 November 2012 - 9
Promote Green and low impact hydropower concept
To minimize Negative Impacts of Dams and Enable People Living in Harmony with Nature.

                                                To Minimize

     Anti-dam Pro-dam                         Negative Impact
                                                   of Dam
HYDROPOWER SUSTAINABILITY ASSESSMENT PROTOCOL
    November 2010 《水电可持续评价规范》 2010 年 11 月

                                                   Background

Assessment Tools
for Project Life
                                                             Implemen-
                      Early Stage      Preparation                             Operation
Cycle Stages:                                                  tation


Significant Project           Commence                Award of           Project
Development                   hydropower project      construction       commissioning
Decision Points:              preparation             contracts




                                    www.hydropower.org
Rapid Basin-wide Hydorpower
   Sustainability Assessment Tool

– bring basin-wise and
  sub-basin
  considerations into
  hydropower
  sustainability
  assessments
• Introduction of
  Sustainability
  Assessment
  Protocol to Hydro
  Lancang in 2009

• Consultation
  workshop for draft
  version of Protocol
  in December 2009
  in Kunming
Vice President Huang   Director from Yunnan    Director from Asian
                       Research Center of      International Rivers Centre
from Huaneng           Economics




                                              Participant
                                              from TNC
• October 2010, participation with
  Huaneng at “International
  Seminar on Sustainable
  Hydropower Development” in
  Beijing
Launching Ceremony of and Workshop on
Hydropower Sustainability Assessment Protocol
HSAP Assessment on Jinghong
       Hydro Station
Jinghong Assessment Outreach Workshop
Nuozhadu
Assessment




             16 November 2012 - 20
Promote dialogues
Lao Delegation visit to Hydro Lancang
Facilitate dialogue
with international
hydropower
community
Bridge international
community with
Chinese developers
Cross visit to and roundtable dialogue in Cambodia




                                               16 November 2012 - 26
16 November 2012 - 27
Capacity building for partners
16 November 2012 - 30
OBSERVATIONS
• Better understanding of the issues in the entire
  Mekong Region
• Solution-oriented actions
• Good practices learning and sharing, not only in
  engineering, but also on environmental and
  social practice
• Multi-stakeholders involvement
• Feasibility of the application of the tools
• Dialogue and communication can achieve better
  cooperation
• capacity building needed
RECOMMENDATION FOR ACTIONS
• Policy dialogue at national level on
  promoting green/sustainable hydropower
  development
• Regional/international cooperation and
  exchange on promoting best practice
• Promoting regional dialogue on water
  resource management and water
  governance.
• Capacity building

Mais conteúdo relacionado

Destaque

Irish Red Cross Tsunami Pictorial
Irish Red Cross Tsunami PictorialIrish Red Cross Tsunami Pictorial
Irish Red Cross Tsunami Pictorialirishredcross
 
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...International Hydropower Association
 
Atmospheric general circulation in an idealized dry GCM without eddy-eddy int...
Atmospheric general circulation in an idealized dry GCM without eddy-eddy int...Atmospheric general circulation in an idealized dry GCM without eddy-eddy int...
Atmospheric general circulation in an idealized dry GCM without eddy-eddy int...Farid Ait-Chaalal, PhD
 
Improving hydropower reservoir operation by using snow-related information
Improving hydropower reservoir operation by using snow-related informationImproving hydropower reservoir operation by using snow-related information
Improving hydropower reservoir operation by using snow-related informationEnvironmental Intelligence Lab
 
Info Graphics Tsunami
Info Graphics TsunamiInfo Graphics Tsunami
Info Graphics TsunamiZef Fugaz
 
The Study on Notification and Decision-Making Processes on the Hydropower in ...
The Study on Notification and Decision-Making Processes on the Hydropower in ...The Study on Notification and Decision-Making Processes on the Hydropower in ...
The Study on Notification and Decision-Making Processes on the Hydropower in ...CPWF Mekong
 
Challenges and Good Practices in Resettlement Caused by Hydropower
Challenges and Good Practices in Resettlement Caused by HydropowerChallenges and Good Practices in Resettlement Caused by Hydropower
Challenges and Good Practices in Resettlement Caused by HydropowerCPWF Mekong
 
Science Crime Busters Fingerprints Ppt
Science Crime Busters Fingerprints PptScience Crime Busters Fingerprints Ppt
Science Crime Busters Fingerprints Pptwindyridge
 
Reach For The Stars Ppt
Reach For The Stars PptReach For The Stars Ppt
Reach For The Stars Pptwindyridge
 
Combined impact of climate change and hydropower development on flows of the ...
Combined impact of climate change and hydropower development on flows of the ...Combined impact of climate change and hydropower development on flows of the ...
Combined impact of climate change and hydropower development on flows of the ...tacochrane
 
Impacts of hydropower on farmers' livelihoods in the Sre Pok River in Vietnam...
Impacts of hydropower on farmers' livelihoods in the Sre Pok River in Vietnam...Impacts of hydropower on farmers' livelihoods in the Sre Pok River in Vietnam...
Impacts of hydropower on farmers' livelihoods in the Sre Pok River in Vietnam...CPWF Mekong
 

Destaque (18)

Irish Red Cross Tsunami Pictorial
Irish Red Cross Tsunami PictorialIrish Red Cross Tsunami Pictorial
Irish Red Cross Tsunami Pictorial
 
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
IHA 2013 World Congress: IHA: Introduction to the Hydropower Sustainability A...
 
Hydroelectric powerplant
Hydroelectric powerplant Hydroelectric powerplant
Hydroelectric powerplant
 
Atmospheric general circulation in an idealized dry GCM without eddy-eddy int...
Atmospheric general circulation in an idealized dry GCM without eddy-eddy int...Atmospheric general circulation in an idealized dry GCM without eddy-eddy int...
Atmospheric general circulation in an idealized dry GCM without eddy-eddy int...
 
Improving hydropower reservoir operation by using snow-related information
Improving hydropower reservoir operation by using snow-related informationImproving hydropower reservoir operation by using snow-related information
Improving hydropower reservoir operation by using snow-related information
 
Info Graphics Tsunami
Info Graphics TsunamiInfo Graphics Tsunami
Info Graphics Tsunami
 
Flpower
FlpowerFlpower
Flpower
 
The Study on Notification and Decision-Making Processes on the Hydropower in ...
The Study on Notification and Decision-Making Processes on the Hydropower in ...The Study on Notification and Decision-Making Processes on the Hydropower in ...
The Study on Notification and Decision-Making Processes on the Hydropower in ...
 
Challenges and Good Practices in Resettlement Caused by Hydropower
Challenges and Good Practices in Resettlement Caused by HydropowerChallenges and Good Practices in Resettlement Caused by Hydropower
Challenges and Good Practices in Resettlement Caused by Hydropower
 
Science Crime Busters Fingerprints Ppt
Science Crime Busters Fingerprints PptScience Crime Busters Fingerprints Ppt
Science Crime Busters Fingerprints Ppt
 
Tsunami Earth Science Lesson PowerPoint
Tsunami Earth Science Lesson PowerPointTsunami Earth Science Lesson PowerPoint
Tsunami Earth Science Lesson PowerPoint
 
Reach For The Stars Ppt
Reach For The Stars PptReach For The Stars Ppt
Reach For The Stars Ppt
 
Combined impact of climate change and hydropower development on flows of the ...
Combined impact of climate change and hydropower development on flows of the ...Combined impact of climate change and hydropower development on flows of the ...
Combined impact of climate change and hydropower development on flows of the ...
 
Atmosphere 1
Atmosphere 1Atmosphere 1
Atmosphere 1
 
Hydroelectric power
Hydroelectric powerHydroelectric power
Hydroelectric power
 
Impacts of hydropower on farmers' livelihoods in the Sre Pok River in Vietnam...
Impacts of hydropower on farmers' livelihoods in the Sre Pok River in Vietnam...Impacts of hydropower on farmers' livelihoods in the Sre Pok River in Vietnam...
Impacts of hydropower on farmers' livelihoods in the Sre Pok River in Vietnam...
 
EM Spectrum
EM SpectrumEM Spectrum
EM Spectrum
 
L5 Hydropower
L5  HydropowerL5  Hydropower
L5 Hydropower
 

Semelhante a Observations from Promoting Sustainable Hydropower Best Practices

Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...
Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...
Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...NAPExpo 2014
 
Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...
Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...
Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...Iwl Pcu
 
The People Behind the Projects - Interview with Steve Warren - Water quality ...
The People Behind the Projects - Interview with Steve Warren - Water quality ...The People Behind the Projects - Interview with Steve Warren - Water quality ...
The People Behind the Projects - Interview with Steve Warren - Water quality ...ENPI Info Centre
 
Report by Technical Committee Chair Dr Mohamed Ait Kadi
Report by Technical Committee Chair Dr Mohamed Ait KadiReport by Technical Committee Chair Dr Mohamed Ait Kadi
Report by Technical Committee Chair Dr Mohamed Ait KadiGlobal Water Partnership
 
Nick Tandi
Nick TandiNick Tandi
Nick Tandi7391456
 
Oil and Gas Operations – Integrating the Realities of the Social License
Oil and Gas Operations – Integrating the Realities of the Social License Oil and Gas Operations – Integrating the Realities of the Social License
Oil and Gas Operations – Integrating the Realities of the Social License Society of Petroleum Engineers
 
Workshop on Climate Resilience, Integrated Drought and Flood Management
Workshop on Climate Resilience, Integrated Drought and Flood ManagementWorkshop on Climate Resilience, Integrated Drought and Flood Management
Workshop on Climate Resilience, Integrated Drought and Flood ManagementGlobal Water Partnership
 
Workshop on Flood management in a transboundary context, 13-14.12.2011, Jacob...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Jacob...Workshop on Flood management in a transboundary context, 13-14.12.2011, Jacob...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Jacob...GWP-Mediterranean (GWP-Med)
 
Enhancing professionalism in environment management and practice eik central
Enhancing professionalism in environment management and practice   eik centralEnhancing professionalism in environment management and practice   eik central
Enhancing professionalism in environment management and practice eik centralWanjiru Gachugi-Waweru
 
Resource Management Plan Stakeholder Meeting
Resource Management Plan Stakeholder MeetingResource Management Plan Stakeholder Meeting
Resource Management Plan Stakeholder MeetingMashilo Kabedi
 
Progress of river health and e flow in china
Progress of river health and e flow in chinaProgress of river health and e flow in china
Progress of river health and e flow in chinaInternational WaterCentre
 
2nd GEF Biennial International Waters Conference: Implementing Agency Perspec...
2nd GEF Biennial International Waters Conference: Implementing Agency Perspec...2nd GEF Biennial International Waters Conference: Implementing Agency Perspec...
2nd GEF Biennial International Waters Conference: Implementing Agency Perspec...Iwl Pcu
 
Korea business forum july4 0930-1400
Korea business forum july4 0930-1400Korea business forum july4 0930-1400
Korea business forum july4 0930-1400nautes7881
 
2nd GEF Biennial International Waters Conference Sept. 25-29, 2002 Dalian, Ch...
2nd GEF Biennial International Waters Conference Sept. 25-29, 2002 Dalian, Ch...2nd GEF Biennial International Waters Conference Sept. 25-29, 2002 Dalian, Ch...
2nd GEF Biennial International Waters Conference Sept. 25-29, 2002 Dalian, Ch...Iwl Pcu
 
Recap of 2014 meeting and this meeting’s Objectives
Recap of 2014 meeting and this meeting’s ObjectivesRecap of 2014 meeting and this meeting’s Objectives
Recap of 2014 meeting and this meeting’s ObjectivesEthical Sector
 

Semelhante a Observations from Promoting Sustainable Hydropower Best Practices (20)

Small Hydro Conference
Small Hydro ConferenceSmall Hydro Conference
Small Hydro Conference
 
Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...
Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...
Andrew Takawira, GWP Africa, Integrated approaches to planning and implementa...
 
Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...
Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...
Thematic Breakout Session Two: Monitoring and Evaluation Results- Programme S...
 
The People Behind the Projects - Interview with Steve Warren - Water quality ...
The People Behind the Projects - Interview with Steve Warren - Water quality ...The People Behind the Projects - Interview with Steve Warren - Water quality ...
The People Behind the Projects - Interview with Steve Warren - Water quality ...
 
Report by Technical Committee Chair Dr Mohamed Ait Kadi
Report by Technical Committee Chair Dr Mohamed Ait KadiReport by Technical Committee Chair Dr Mohamed Ait Kadi
Report by Technical Committee Chair Dr Mohamed Ait Kadi
 
Nick Tandi
Nick TandiNick Tandi
Nick Tandi
 
Oil and Gas Operations – Integrating the Realities of the Social License
Oil and Gas Operations – Integrating the Realities of the Social License Oil and Gas Operations – Integrating the Realities of the Social License
Oil and Gas Operations – Integrating the Realities of the Social License
 
Workshop on Climate Resilience, Integrated Drought and Flood Management
Workshop on Climate Resilience, Integrated Drought and Flood ManagementWorkshop on Climate Resilience, Integrated Drought and Flood Management
Workshop on Climate Resilience, Integrated Drought and Flood Management
 
Workshop on Flood management in a transboundary context, 13-14.12.2011, Jacob...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Jacob...Workshop on Flood management in a transboundary context, 13-14.12.2011, Jacob...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Jacob...
 
IWMI-CPWF - cpwf director's report
IWMI-CPWF - cpwf director's reportIWMI-CPWF - cpwf director's report
IWMI-CPWF - cpwf director's report
 
Enhancing professionalism in environment management and practice eik central
Enhancing professionalism in environment management and practice   eik centralEnhancing professionalism in environment management and practice   eik central
Enhancing professionalism in environment management and practice eik central
 
Resource Management Plan Stakeholder Meeting
Resource Management Plan Stakeholder MeetingResource Management Plan Stakeholder Meeting
Resource Management Plan Stakeholder Meeting
 
Progress of river health and e flow in china
Progress of river health and e flow in chinaProgress of river health and e flow in china
Progress of river health and e flow in china
 
Scaling up in development cooperation (GIZ)
Scaling up in development cooperation (GIZ)Scaling up in development cooperation (GIZ)
Scaling up in development cooperation (GIZ)
 
2nd GEF Biennial International Waters Conference: Implementing Agency Perspec...
2nd GEF Biennial International Waters Conference: Implementing Agency Perspec...2nd GEF Biennial International Waters Conference: Implementing Agency Perspec...
2nd GEF Biennial International Waters Conference: Implementing Agency Perspec...
 
Korea business forum july4 0930-1400
Korea business forum july4 0930-1400Korea business forum july4 0930-1400
Korea business forum july4 0930-1400
 
2nd GEF Biennial International Waters Conference Sept. 25-29, 2002 Dalian, Ch...
2nd GEF Biennial International Waters Conference Sept. 25-29, 2002 Dalian, Ch...2nd GEF Biennial International Waters Conference Sept. 25-29, 2002 Dalian, Ch...
2nd GEF Biennial International Waters Conference Sept. 25-29, 2002 Dalian, Ch...
 
Recap of 2014 meeting and this meeting’s Objectives
Recap of 2014 meeting and this meeting’s ObjectivesRecap of 2014 meeting and this meeting’s Objectives
Recap of 2014 meeting and this meeting’s Objectives
 
The CPWF Big Picture
The CPWF Big PictureThe CPWF Big Picture
The CPWF Big Picture
 
Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...
Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...
Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...
 

Mais de CPWF Mekong

Mekong: The Challenges of Scale
Mekong: The Challenges of ScaleMekong: The Challenges of Scale
Mekong: The Challenges of ScaleCPWF Mekong
 
Closing remarks dr kim geheb
Closing remarks dr kim gehebClosing remarks dr kim geheb
Closing remarks dr kim gehebCPWF Mekong
 
Session 20 comparing the nexus along the mekong ganga
Session 20 comparing the nexus along the mekong  gangaSession 20 comparing the nexus along the mekong  ganga
Session 20 comparing the nexus along the mekong gangaCPWF Mekong
 
Sustainability tools in hydropower development & operations
Sustainability tools in hydropower development & operationsSustainability tools in hydropower development & operations
Sustainability tools in hydropower development & operationsCPWF Mekong
 
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...CPWF Mekong
 
Advancing sustainability in the mekong region role of assessment tools and st...
Advancing sustainability in the mekong region role of assessment tools and st...Advancing sustainability in the mekong region role of assessment tools and st...
Advancing sustainability in the mekong region role of assessment tools and st...CPWF Mekong
 
Draft agenda session 19 for panelists
Draft agenda session 19 for panelistsDraft agenda session 19 for panelists
Draft agenda session 19 for panelistsCPWF Mekong
 
Lessons learnt about hydropower decision making processes in cambodia
Lessons learnt about hydropower decision making processes in cambodiaLessons learnt about hydropower decision making processes in cambodia
Lessons learnt about hydropower decision making processes in cambodiaCPWF Mekong
 
Decision making on hydropower development in lao pdr
Decision making on hydropower development in lao pdrDecision making on hydropower development in lao pdr
Decision making on hydropower development in lao pdrCPWF Mekong
 
Chinese studies on impacts of dams
Chinese studies on impacts of damsChinese studies on impacts of dams
Chinese studies on impacts of damsCPWF Mekong
 
Governance, institutions and decision making
Governance, institutions and decision makingGovernance, institutions and decision making
Governance, institutions and decision makingCPWF Mekong
 
Integrated water resource management
Integrated water resource managementIntegrated water resource management
Integrated water resource managementCPWF Mekong
 
How hydropower operations can accommodate local livelihoods
How hydropower operations can accommodate local livelihoodsHow hydropower operations can accommodate local livelihoods
How hydropower operations can accommodate local livelihoodsCPWF Mekong
 
Gender, livelihoods & decision making
Gender, livelihoods & decision makingGender, livelihoods & decision making
Gender, livelihoods & decision makingCPWF Mekong
 
Better dams for food and livelihoods overview
Better dams for food and livelihoods overviewBetter dams for food and livelihoods overview
Better dams for food and livelihoods overviewCPWF Mekong
 
Assessing livelihood piloting experiences associated with hydropower development
Assessing livelihood piloting experiences associated with hydropower developmentAssessing livelihood piloting experiences associated with hydropower development
Assessing livelihood piloting experiences associated with hydropower developmentCPWF Mekong
 
Day 1 session 5.3 direct vs indirect pes could microcredit be an option
Day 1 session 5.3  direct vs indirect pes could microcredit be an optionDay 1 session 5.3  direct vs indirect pes could microcredit be an option
Day 1 session 5.3 direct vs indirect pes could microcredit be an optionCPWF Mekong
 
Optimising fish friendly criteria for incorporation into the design of mini-h...
Optimising fish friendly criteria for incorporation into the design of mini-h...Optimising fish friendly criteria for incorporation into the design of mini-h...
Optimising fish friendly criteria for incorporation into the design of mini-h...CPWF Mekong
 
Solar pv in vietnam power sector benefits, costs and policy
Solar pv in vietnam power sector  benefits, costs and policySolar pv in vietnam power sector  benefits, costs and policy
Solar pv in vietnam power sector benefits, costs and policyCPWF Mekong
 
Technology review
Technology reviewTechnology review
Technology reviewCPWF Mekong
 

Mais de CPWF Mekong (20)

Mekong: The Challenges of Scale
Mekong: The Challenges of ScaleMekong: The Challenges of Scale
Mekong: The Challenges of Scale
 
Closing remarks dr kim geheb
Closing remarks dr kim gehebClosing remarks dr kim geheb
Closing remarks dr kim geheb
 
Session 20 comparing the nexus along the mekong ganga
Session 20 comparing the nexus along the mekong  gangaSession 20 comparing the nexus along the mekong  ganga
Session 20 comparing the nexus along the mekong ganga
 
Sustainability tools in hydropower development & operations
Sustainability tools in hydropower development & operationsSustainability tools in hydropower development & operations
Sustainability tools in hydropower development & operations
 
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
 
Advancing sustainability in the mekong region role of assessment tools and st...
Advancing sustainability in the mekong region role of assessment tools and st...Advancing sustainability in the mekong region role of assessment tools and st...
Advancing sustainability in the mekong region role of assessment tools and st...
 
Draft agenda session 19 for panelists
Draft agenda session 19 for panelistsDraft agenda session 19 for panelists
Draft agenda session 19 for panelists
 
Lessons learnt about hydropower decision making processes in cambodia
Lessons learnt about hydropower decision making processes in cambodiaLessons learnt about hydropower decision making processes in cambodia
Lessons learnt about hydropower decision making processes in cambodia
 
Decision making on hydropower development in lao pdr
Decision making on hydropower development in lao pdrDecision making on hydropower development in lao pdr
Decision making on hydropower development in lao pdr
 
Chinese studies on impacts of dams
Chinese studies on impacts of damsChinese studies on impacts of dams
Chinese studies on impacts of dams
 
Governance, institutions and decision making
Governance, institutions and decision makingGovernance, institutions and decision making
Governance, institutions and decision making
 
Integrated water resource management
Integrated water resource managementIntegrated water resource management
Integrated water resource management
 
How hydropower operations can accommodate local livelihoods
How hydropower operations can accommodate local livelihoodsHow hydropower operations can accommodate local livelihoods
How hydropower operations can accommodate local livelihoods
 
Gender, livelihoods & decision making
Gender, livelihoods & decision makingGender, livelihoods & decision making
Gender, livelihoods & decision making
 
Better dams for food and livelihoods overview
Better dams for food and livelihoods overviewBetter dams for food and livelihoods overview
Better dams for food and livelihoods overview
 
Assessing livelihood piloting experiences associated with hydropower development
Assessing livelihood piloting experiences associated with hydropower developmentAssessing livelihood piloting experiences associated with hydropower development
Assessing livelihood piloting experiences associated with hydropower development
 
Day 1 session 5.3 direct vs indirect pes could microcredit be an option
Day 1 session 5.3  direct vs indirect pes could microcredit be an optionDay 1 session 5.3  direct vs indirect pes could microcredit be an option
Day 1 session 5.3 direct vs indirect pes could microcredit be an option
 
Optimising fish friendly criteria for incorporation into the design of mini-h...
Optimising fish friendly criteria for incorporation into the design of mini-h...Optimising fish friendly criteria for incorporation into the design of mini-h...
Optimising fish friendly criteria for incorporation into the design of mini-h...
 
Solar pv in vietnam power sector benefits, costs and policy
Solar pv in vietnam power sector  benefits, costs and policySolar pv in vietnam power sector  benefits, costs and policy
Solar pv in vietnam power sector benefits, costs and policy
 
Technology review
Technology reviewTechnology review
Technology review
 

Observations from Promoting Sustainable Hydropower Best Practices

  • 1. Observation from Promoting Sustainable Hydropower Best Practices Wu Yusong Coordinator for Upper Mekong Programme © Michel Roggo / WWF-Canon WWF China, 14th. Nov 2012 1
  • 2. Outline • Why WWF China works on this? • How WWF China works on this? • What did WWF China do? • Findings • Recommendation for actions 16 November 2012 - 2
  • 3. WHY WWF CHINA WORKS ON THIS?
  • 4. Why • Global Water Security Initiative in WWF International • The key rivers/watersheds in China, Yangtze and Lancang/Upper Mekong • In Lancang/Upper Mekong, by 2020, the physical integrity of rivers and adjoining wildlife habitats in the Upper Mekong basin are safeguarded against threats from infrastructure development, mining, forestry, agriculture, and climate change.
  • 5. Why • One of the few organizations which work upper and lower. • work across borders to tackle joint regional priorities by bringing together key stakeholders of all the Mekong river countries
  • 6. HOW WWF CHINA WORKS ON THIS?
  • 7. HOW • Scientific based • Research+Demonstration+Policy advocacy • Facilitate experiences and information sharing • Promote communication and dialogue • Work with multi partners • Work at different levels • Explore and provide constructive solutions
  • 8. WHAT DID WWF CHINA DO?
  • 9. Introduce international standards 16 November 2012 - 9
  • 10. Promote Green and low impact hydropower concept To minimize Negative Impacts of Dams and Enable People Living in Harmony with Nature. To Minimize Anti-dam Pro-dam Negative Impact of Dam
  • 11. HYDROPOWER SUSTAINABILITY ASSESSMENT PROTOCOL November 2010 《水电可持续评价规范》 2010 年 11 月 Background Assessment Tools for Project Life Implemen- Early Stage Preparation Operation Cycle Stages: tation Significant Project Commence Award of Project Development hydropower project construction commissioning Decision Points: preparation contracts www.hydropower.org
  • 12. Rapid Basin-wide Hydorpower Sustainability Assessment Tool – bring basin-wise and sub-basin considerations into hydropower sustainability assessments
  • 13. • Introduction of Sustainability Assessment Protocol to Hydro Lancang in 2009 • Consultation workshop for draft version of Protocol in December 2009 in Kunming
  • 14. Vice President Huang Director from Yunnan Director from Asian Research Center of International Rivers Centre from Huaneng Economics Participant from TNC
  • 15. • October 2010, participation with Huaneng at “International Seminar on Sustainable Hydropower Development” in Beijing
  • 16. Launching Ceremony of and Workshop on Hydropower Sustainability Assessment Protocol
  • 17. HSAP Assessment on Jinghong Hydro Station
  • 19.
  • 20. Nuozhadu Assessment 16 November 2012 - 20
  • 22. Lao Delegation visit to Hydro Lancang
  • 25.
  • 26. Cross visit to and roundtable dialogue in Cambodia 16 November 2012 - 26
  • 29.
  • 31.
  • 33. • Better understanding of the issues in the entire Mekong Region • Solution-oriented actions • Good practices learning and sharing, not only in engineering, but also on environmental and social practice • Multi-stakeholders involvement • Feasibility of the application of the tools • Dialogue and communication can achieve better cooperation • capacity building needed
  • 35. • Policy dialogue at national level on promoting green/sustainable hydropower development • Regional/international cooperation and exchange on promoting best practice • Promoting regional dialogue on water resource management and water governance. • Capacity building

Notas do Editor

  1. How we organize the WWF’s operating modalities in CPO/GMPO will determine our success for the China related conservation actions in the whole Mekong River.
  2. How we organize the WWF’s operating modalities in CPO/GMPO will determine our success for the China related conservation actions in the whole Mekong River.
  3. How we organize the WWF’s operating modalities in CPO/GMPO will determine our success for the China related conservation actions in the whole Mekong River.
  4. How we organize the WWF’s operating modalities in CPO/GMPO will determine our success for the China related conservation actions in the whole Mekong River.