SlideShare uma empresa Scribd logo
1 de 18
Baixar para ler offline
14-1-2015Process optimisation
Process Optimisation: Top Energy
Efficiency Solutions In Waste Energy
Authors: Johan van der Kamp &
Hans van Essen.
14-1-2015Process optimisation
Brief introduction
• linkedin.com/pub/johan-van-der-kamp/2a/848/424
• nl.linkedin.com/pub/hans-van-essen/28/8b7/917
14-1-2015Process optimisation
Process Optimisation
• The AfvalEnergie Bedrijf (AEB) in Amsterdam, Netherlands, has been processing
waste for almost a century.
• The company aims for maximum environmental efficiency, in the sense that waste
does not simply remain waste, but is converted into energy and basic materials.
• The waste is incinerated and the energy released is used to generate electricity,
while the remainder becomes usable heat.
• As many valuable materials as possible are reclaimed from the ash residue.
• To produce electricity from the available combustion energy, the well-known cycle
of steam boiler, steam turbine (connected to the generator), condenser and feed
water pump is used.
• It is also commonly known that the higher the pressure and temperature of the
steam supplied to the turbine and/or the lower the pressure and temperature of the
steam leaving the turbine, the higher the conversion efficiency is of fuel into
electricity.
14-1-2015Process optimisation
• .
14-1-2015Process optimisation
Waste Energy Company Amsterdam
Process Optimisation
• In a steam turbine, not only does the pressure of the steam decrease, the
temperature also drops, creating ‘wet’ steam.
• An increasing amount of condensate forms in the steam. If the water content in the
steam becomes too high, it will damage the turbine.
• As a result, the condensate in the steam ultimately determines the achievable outlet
pressure, and thus to a large extent, the shaft power.
• When the steam entering the turbine is super-heated steam (dry steam), the
moment that condensate formation starts is delayed, and the steam pressure at the
outlet of the turbine may be reduced.
• The result is a higher shaft power. The design goal is that not the moisture content
of the exhaust steam determines the pressure at the turbine outlet, but the
temperature of the condenser cooling medium, usually the outside air or cooling
water.
• There is sufficient cooling water at AEB, so in principle a very deep vacuum could
be achieved at the outlet of the turbine, but then extreme superheating of the boiler
steam would be required.
14-1-2015Process optimisation
Process Optimisation
• However, the many corrosive constituents in the boiler’s combustion gases limit this
temperature, since the already very expensive materials would corrode too quickly.
• To break this circle of limited conversion rate, AEB opted for a two-stage turbine,
reheating the steam between the two stages.
• The steam – moderately superheated – flows through the first (high-pressure) stage
of the steam turbine, up to a location where, approximately, condensation would
start.
• Here, a connection has been created in the turbine housing for the steam to exit.
• This steam is then extremely superheated in a reheater and will enter the second
(low-pressure) stage of the steam turbine as superheated steam. A very deep
vacuum can now be achieved in this second stage.
• Using a two-stage turbine with reheating increases the efficiency of the system by
more than 30%, which means additional electricity production of over 30% from the
same amount of fuel.
14-1-2015Process optimisation
• .
14-1-2015Process optimisation
Reheater: Process overview.
Process Optimisation
• The high-pressure steam from the boiler (1) has a pressure of 130 bars. This
means an evaporation temperature of 330˚C.
• The steam flowing to the high-pressure stage (2) of the turbine is superheated by
more than 100˚C.
• After this high-pressure stage, the steam has a pressure of 14 bars at the
corresponding temperature of more than 190˚C.
• The steam first flows to the separators, where any water droplets formed in the
turbine are collected and discharged.
• The dry steam then goes to the superheater (position 6 in Fig 2.), where the
temperature is increased by approximately 130˚C, from 190˚C to 320˚C.
• A portion of the high-pressure steam is used as a heating medium.
14-1-2015Process optimisation
Process Optimisation
• The superheated low-pressure steam flows through the red pipes to the low-
pressure stage of the turbine (4).
• In addition to the separator and the reheater, both reheater units consist of a
condensate vessel for the high-pressure condensate formed.
• These vessels are necessary for controlling the units. The low pressure steam from
the turbine is condensed in the condenser (5).
• The high-pressure stage of the turbine and the low-pressure stage transfer their
mechanical energy to the generator (3), where it is converted into electrical energy.
• The reheater units were so crucial to realising a properly-working, highly-efficient
installation that AEB decided to purchase the installations themselves directly.
• When Bronswerk received the request for the reheaters, it proposed supplying the
complete units, including separator, condensate vessel and the connecting piping.
• The proper operation of the separator is crucial to the proper operation of the
reheater.
14-1-2015Process optimisation
Process Optimisation
• To prevent having the warranty spread over two suppliers, it was wise to keep
everything in one hand.
• AEB gave Bronswerk the opportunity to supply the complete installations.
• The proposal by Bronswerk Heat Transfer contained a surprising combination of
techniques that together result in a compact and robust unit.
• The High Pressure Compact Header, which had just been developed by Bronswerk,
was provided for the high pressure steam.
• To avoid vibrations due to high-flow rates of the low pressure steam in the
condenser, a ‘no-tubes-in-windows’ type was used, while low-finned tubes provide
good heat transfer to the low-pressure steam.
• For a company aspiring to be a market leader, it is necessary to introduce a
breakthrough development to the market.
14-1-2015Process optimisation
Process Optimisation
• The High Pressure Compact Header referred to here is just such a Bronswerk
development.
• It is also essential to know the discipline to the finest detail. This makes it possible
to use the right combination of existing and new technologies.
• This project shows that Bronswerk also masters these aspects.
• AEB was so pleased with the design of the reheater unit that it also awarded
Bronswerk the dump condenser.
• Ultimately, AEB now has an incinerator with uniquely high efficiency.
14-1-2015Process optimisation
Process Optimisation
• Questions?
• Ask Hans van Essen
• essen@bronswerk.nl
• Johan van der Kamp
• kamp@bronswerk.nl
• Or
• +31 33 24 72 500
• info@bronswerk.com
14-1-2015Process optimisation
Process Optimisation
14-1-2015Process optimisation
• Like to know more about our company?
• Have a chat with Bronswerk people via our website or
• Visit our website: http://www.bronswerk.com/en/
• Meet us on LinkedIn.
• https://www.linkedin.com/company/bronswerk-heat-
transfer/products?trk=top_nav_products
14-1-2015Process optimisation
•Join our community!
•Join our community!
• Conversate with us on Facebook.
• http://www.facebook.com/Bronswerk.
Process optimisation 14-1-2015
Join our community!
• Follow us on Twitter.
• https://twitter.com/bronswerk
14-1-2015Process optimisation
• Share our content?
http://www.slideshare.net/Bronswerk
14-1-2015Process optimisation
Join our community!

Mais conteúdo relacionado

Mais procurados

Closed feed water heaters :)
Closed feed water heaters :)Closed feed water heaters :)
Closed feed water heaters :)JhePoi Santos
 
Introduction to ppe
Introduction to ppeIntroduction to ppe
Introduction to ppeYash Shah
 
2013edusat lecture on steam plant(2)
2013edusat lecture on steam  plant(2)2013edusat lecture on steam  plant(2)
2013edusat lecture on steam plant(2)iimt college meerut
 
performance analysis of steam boiler
performance analysis of steam boilerperformance analysis of steam boiler
performance analysis of steam boilersathish sak
 
Waste Heat Recovery Project
Waste Heat Recovery ProjectWaste Heat Recovery Project
Waste Heat Recovery ProjectSUMIT JINDAL
 
01 regenerative feed heating
01 regenerative feed heating01 regenerative feed heating
01 regenerative feed heatingAnil Palamwar
 
Power plant high pressure boilers
Power plant high pressure boilers Power plant high pressure boilers
Power plant high pressure boilers PRANAV PATEL
 
High pressure boilers
High pressure boilersHigh pressure boilers
High pressure boilerssneh patel
 
Project Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- AdityaProject Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- AdityaAditya Bhattacharjee
 
Heat Exchanger recuperators
Heat Exchanger  recuperators  Heat Exchanger  recuperators
Heat Exchanger recuperators Ali Abdullah
 
Revamps for Modern Hydrogen Plants
Revamps for Modern Hydrogen PlantsRevamps for Modern Hydrogen Plants
Revamps for Modern Hydrogen PlantsGerard B. Hawkins
 
Organic Rankine cycle macro power plant
Organic Rankine cycle macro power plant Organic Rankine cycle macro power plant
Organic Rankine cycle macro power plant Anandkumar Shorokhaibam
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power PlantManish Kumar
 
Velox boiler - high pressure boliers
Velox boiler - high pressure boliers Velox boiler - high pressure boliers
Velox boiler - high pressure boliers sajan gohel
 
1727092 634985076667011250
1727092 6349850766670112501727092 634985076667011250
1727092 634985076667011250akshar56
 

Mais procurados (20)

Closed feed water heaters :)
Closed feed water heaters :)Closed feed water heaters :)
Closed feed water heaters :)
 
Introduction to ppe
Introduction to ppeIntroduction to ppe
Introduction to ppe
 
2013edusat lecture on steam plant(2)
2013edusat lecture on steam  plant(2)2013edusat lecture on steam  plant(2)
2013edusat lecture on steam plant(2)
 
performance analysis of steam boiler
performance analysis of steam boilerperformance analysis of steam boiler
performance analysis of steam boiler
 
Waste Heat Recovery Project
Waste Heat Recovery ProjectWaste Heat Recovery Project
Waste Heat Recovery Project
 
IC Engines
IC EnginesIC Engines
IC Engines
 
01 regenerative feed heating
01 regenerative feed heating01 regenerative feed heating
01 regenerative feed heating
 
Power plant high pressure boilers
Power plant high pressure boilers Power plant high pressure boilers
Power plant high pressure boilers
 
O&m of boiler
O&m of boilerO&m of boiler
O&m of boiler
 
Boiler
BoilerBoiler
Boiler
 
High pressure boilers
High pressure boilersHigh pressure boilers
High pressure boilers
 
Efficient steam systems - Generation to WHR
Efficient steam systems - Generation to WHREfficient steam systems - Generation to WHR
Efficient steam systems - Generation to WHR
 
Project Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- AdityaProject Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- Aditya
 
Heat Exchanger recuperators
Heat Exchanger  recuperators  Heat Exchanger  recuperators
Heat Exchanger recuperators
 
Revamps for Modern Hydrogen Plants
Revamps for Modern Hydrogen PlantsRevamps for Modern Hydrogen Plants
Revamps for Modern Hydrogen Plants
 
Organic Rankine cycle macro power plant
Organic Rankine cycle macro power plant Organic Rankine cycle macro power plant
Organic Rankine cycle macro power plant
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power Plant
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Velox boiler - high pressure boliers
Velox boiler - high pressure boliers Velox boiler - high pressure boliers
Velox boiler - high pressure boliers
 
1727092 634985076667011250
1727092 6349850766670112501727092 634985076667011250
1727092 634985076667011250
 

Semelhante a Process optimisation top energy efficiency solutions in waste energy.

Rankine Cycle.pptx
Rankine Cycle.pptxRankine Cycle.pptx
Rankine Cycle.pptxSanjarBey
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantRabi Kumar
 
SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONAMIT KUMAR
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccppDurgSingh
 
Kota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUKota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUManohar Nagar
 
Calorex. What We do, We Do Well
Calorex. What We do, We Do WellCalorex. What We do, We Do Well
Calorex. What We do, We Do WellTony Sweet
 
Best steam power plant
Best steam power plant Best steam power plant
Best steam power plant Enamul Khan
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)sometech
 
Vapor_power cycles KM.pptx ..
Vapor_power cycles KM.pptx            ..Vapor_power cycles KM.pptx            ..
Vapor_power cycles KM.pptx ..happycocoman
 
Overview of Thermal Power Plants
Overview of Thermal Power PlantsOverview of Thermal Power Plants
Overview of Thermal Power PlantsDebajyoti Bose
 
Thermal Power Station
Thermal Power StationThermal Power Station
Thermal Power StationDinesh Sharma
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plantRashmi Nimje
 
Power plant engineering chapter 2
Power plant engineering chapter 2Power plant engineering chapter 2
Power plant engineering chapter 2swathi1995vangaram
 
Multiple effect evaporator
Multiple effect evaporatorMultiple effect evaporator
Multiple effect evaporatorPavel Rout
 

Semelhante a Process optimisation top energy efficiency solutions in waste energy. (20)

Rankine Cycle.pptx
Rankine Cycle.pptxRankine Cycle.pptx
Rankine Cycle.pptx
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTION
 
Heat pumps
Heat pumpsHeat pumps
Heat pumps
 
THERMAL POWER PLANT
THERMAL POWER PLANTTHERMAL POWER PLANT
THERMAL POWER PLANT
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
Kota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUKota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTU
 
Calorex. What We do, We Do Well
Calorex. What We do, We Do WellCalorex. What We do, We Do Well
Calorex. What We do, We Do Well
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Best steam power plant
Best steam power plant Best steam power plant
Best steam power plant
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
 
THERMAL
THERMALTHERMAL
THERMAL
 
Vapor_power cycles KM.pptx ..
Vapor_power cycles KM.pptx            ..Vapor_power cycles KM.pptx            ..
Vapor_power cycles KM.pptx ..
 
Overview of Thermal Power Plants
Overview of Thermal Power PlantsOverview of Thermal Power Plants
Overview of Thermal Power Plants
 
sugar mill ss.pptx
sugar mill ss.pptxsugar mill ss.pptx
sugar mill ss.pptx
 
Steam plan
Steam planSteam plan
Steam plan
 
Thermal Power Station
Thermal Power StationThermal Power Station
Thermal Power Station
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plant
 
Power plant engineering chapter 2
Power plant engineering chapter 2Power plant engineering chapter 2
Power plant engineering chapter 2
 
Multiple effect evaporator
Multiple effect evaporatorMultiple effect evaporator
Multiple effect evaporator
 

Mais de BRONSWERK

Refining summit 2015
Refining summit 2015Refining summit 2015
Refining summit 2015BRONSWERK
 
Onderhoud & reparatie wij fixen het.
Onderhoud & reparatie wij fixen het. Onderhoud & reparatie wij fixen het.
Onderhoud & reparatie wij fixen het. BRONSWERK
 
Waste to energy afval is energie!
Waste to energy afval is energie!Waste to energy afval is energie!
Waste to energy afval is energie!BRONSWERK
 
Smurfit Kappa goede papieren voor kampioen hergebruik restwarmte?
Smurfit Kappa goede papieren voor kampioen hergebruik restwarmte? Smurfit Kappa goede papieren voor kampioen hergebruik restwarmte?
Smurfit Kappa goede papieren voor kampioen hergebruik restwarmte? BRONSWERK
 
Geothermische energie meeliften met de energie van de aarde
Geothermische energie meeliften met de energie van de aardeGeothermische energie meeliften met de energie van de aarde
Geothermische energie meeliften met de energie van de aardeBRONSWERK
 
Stadsverwarming Laat Uw Buren Niet In De Kou Staan.
Stadsverwarming Laat Uw Buren Niet In De Kou Staan.Stadsverwarming Laat Uw Buren Niet In De Kou Staan.
Stadsverwarming Laat Uw Buren Niet In De Kou Staan.BRONSWERK
 
Bronswerk Heat Transfer Wereld Speler In Warmte Wisselaars
Bronswerk Heat Transfer Wereld Speler In Warmte WisselaarsBronswerk Heat Transfer Wereld Speler In Warmte Wisselaars
Bronswerk Heat Transfer Wereld Speler In Warmte WisselaarsBRONSWERK
 
Stoom en gas het beste van 2 werelden.
Stoom en gas het beste van 2 werelden.Stoom en gas het beste van 2 werelden.
Stoom en gas het beste van 2 werelden.BRONSWERK
 
Warmte kracht eten van twee walletjes.
Warmte kracht eten van twee walletjes.Warmte kracht eten van twee walletjes.
Warmte kracht eten van twee walletjes.BRONSWERK
 
Vaktrots Bronswerker Gert Blom In De Schijnwerpers!
Vaktrots Bronswerker Gert Blom In De Schijnwerpers!Vaktrots Bronswerker Gert Blom In De Schijnwerpers!
Vaktrots Bronswerker Gert Blom In De Schijnwerpers!BRONSWERK
 
Bronswerk presentation Air Cooled Condensers Group 6th Annual Meeting.
Bronswerk presentation Air Cooled Condensers Group 6th Annual Meeting.Bronswerk presentation Air Cooled Condensers Group 6th Annual Meeting.
Bronswerk presentation Air Cooled Condensers Group 6th Annual Meeting.BRONSWERK
 
Vessel a pharmaceutical crack
Vessel a pharmaceutical crackVessel a pharmaceutical crack
Vessel a pharmaceutical crackBRONSWERK
 
Research & development innovation radiax technology
Research & development innovation radiax technologyResearch & development innovation radiax technology
Research & development innovation radiax technologyBRONSWERK
 
Failing on fouling. Why should you?
Failing on fouling. Why should you?Failing on fouling. Why should you?
Failing on fouling. Why should you?BRONSWERK
 
Enjoy the Silence? R& D Innovation Whizz Wheel,
Enjoy the Silence? R& D Innovation Whizz Wheel,Enjoy the Silence? R& D Innovation Whizz Wheel,
Enjoy the Silence? R& D Innovation Whizz Wheel,BRONSWERK
 
Centrifugal fan: Industrial Art?
Centrifugal fan: Industrial Art?Centrifugal fan: Industrial Art?
Centrifugal fan: Industrial Art?BRONSWERK
 
Engineering systems : sustainability rules.
Engineering systems : sustainability rules.Engineering systems : sustainability rules.
Engineering systems : sustainability rules.BRONSWERK
 
Natural gas heater quite natural?
Natural gas heater quite natural?Natural gas heater quite natural?
Natural gas heater quite natural?BRONSWERK
 
Sustainability engineering beyond limits.
Sustainability engineering beyond limits.Sustainability engineering beyond limits.
Sustainability engineering beyond limits.BRONSWERK
 
Rendering no waste of energy!
Rendering no waste of energy!Rendering no waste of energy!
Rendering no waste of energy!BRONSWERK
 

Mais de BRONSWERK (20)

Refining summit 2015
Refining summit 2015Refining summit 2015
Refining summit 2015
 
Onderhoud & reparatie wij fixen het.
Onderhoud & reparatie wij fixen het. Onderhoud & reparatie wij fixen het.
Onderhoud & reparatie wij fixen het.
 
Waste to energy afval is energie!
Waste to energy afval is energie!Waste to energy afval is energie!
Waste to energy afval is energie!
 
Smurfit Kappa goede papieren voor kampioen hergebruik restwarmte?
Smurfit Kappa goede papieren voor kampioen hergebruik restwarmte? Smurfit Kappa goede papieren voor kampioen hergebruik restwarmte?
Smurfit Kappa goede papieren voor kampioen hergebruik restwarmte?
 
Geothermische energie meeliften met de energie van de aarde
Geothermische energie meeliften met de energie van de aardeGeothermische energie meeliften met de energie van de aarde
Geothermische energie meeliften met de energie van de aarde
 
Stadsverwarming Laat Uw Buren Niet In De Kou Staan.
Stadsverwarming Laat Uw Buren Niet In De Kou Staan.Stadsverwarming Laat Uw Buren Niet In De Kou Staan.
Stadsverwarming Laat Uw Buren Niet In De Kou Staan.
 
Bronswerk Heat Transfer Wereld Speler In Warmte Wisselaars
Bronswerk Heat Transfer Wereld Speler In Warmte WisselaarsBronswerk Heat Transfer Wereld Speler In Warmte Wisselaars
Bronswerk Heat Transfer Wereld Speler In Warmte Wisselaars
 
Stoom en gas het beste van 2 werelden.
Stoom en gas het beste van 2 werelden.Stoom en gas het beste van 2 werelden.
Stoom en gas het beste van 2 werelden.
 
Warmte kracht eten van twee walletjes.
Warmte kracht eten van twee walletjes.Warmte kracht eten van twee walletjes.
Warmte kracht eten van twee walletjes.
 
Vaktrots Bronswerker Gert Blom In De Schijnwerpers!
Vaktrots Bronswerker Gert Blom In De Schijnwerpers!Vaktrots Bronswerker Gert Blom In De Schijnwerpers!
Vaktrots Bronswerker Gert Blom In De Schijnwerpers!
 
Bronswerk presentation Air Cooled Condensers Group 6th Annual Meeting.
Bronswerk presentation Air Cooled Condensers Group 6th Annual Meeting.Bronswerk presentation Air Cooled Condensers Group 6th Annual Meeting.
Bronswerk presentation Air Cooled Condensers Group 6th Annual Meeting.
 
Vessel a pharmaceutical crack
Vessel a pharmaceutical crackVessel a pharmaceutical crack
Vessel a pharmaceutical crack
 
Research & development innovation radiax technology
Research & development innovation radiax technologyResearch & development innovation radiax technology
Research & development innovation radiax technology
 
Failing on fouling. Why should you?
Failing on fouling. Why should you?Failing on fouling. Why should you?
Failing on fouling. Why should you?
 
Enjoy the Silence? R& D Innovation Whizz Wheel,
Enjoy the Silence? R& D Innovation Whizz Wheel,Enjoy the Silence? R& D Innovation Whizz Wheel,
Enjoy the Silence? R& D Innovation Whizz Wheel,
 
Centrifugal fan: Industrial Art?
Centrifugal fan: Industrial Art?Centrifugal fan: Industrial Art?
Centrifugal fan: Industrial Art?
 
Engineering systems : sustainability rules.
Engineering systems : sustainability rules.Engineering systems : sustainability rules.
Engineering systems : sustainability rules.
 
Natural gas heater quite natural?
Natural gas heater quite natural?Natural gas heater quite natural?
Natural gas heater quite natural?
 
Sustainability engineering beyond limits.
Sustainability engineering beyond limits.Sustainability engineering beyond limits.
Sustainability engineering beyond limits.
 
Rendering no waste of energy!
Rendering no waste of energy!Rendering no waste of energy!
Rendering no waste of energy!
 

Último

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxnuruddin69
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 

Último (20)

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 

Process optimisation top energy efficiency solutions in waste energy.

  • 2. Process Optimisation: Top Energy Efficiency Solutions In Waste Energy Authors: Johan van der Kamp & Hans van Essen. 14-1-2015Process optimisation
  • 3. Brief introduction • linkedin.com/pub/johan-van-der-kamp/2a/848/424 • nl.linkedin.com/pub/hans-van-essen/28/8b7/917 14-1-2015Process optimisation
  • 4. Process Optimisation • The AfvalEnergie Bedrijf (AEB) in Amsterdam, Netherlands, has been processing waste for almost a century. • The company aims for maximum environmental efficiency, in the sense that waste does not simply remain waste, but is converted into energy and basic materials. • The waste is incinerated and the energy released is used to generate electricity, while the remainder becomes usable heat. • As many valuable materials as possible are reclaimed from the ash residue. • To produce electricity from the available combustion energy, the well-known cycle of steam boiler, steam turbine (connected to the generator), condenser and feed water pump is used. • It is also commonly known that the higher the pressure and temperature of the steam supplied to the turbine and/or the lower the pressure and temperature of the steam leaving the turbine, the higher the conversion efficiency is of fuel into electricity. 14-1-2015Process optimisation
  • 5. • . 14-1-2015Process optimisation Waste Energy Company Amsterdam
  • 6. Process Optimisation • In a steam turbine, not only does the pressure of the steam decrease, the temperature also drops, creating ‘wet’ steam. • An increasing amount of condensate forms in the steam. If the water content in the steam becomes too high, it will damage the turbine. • As a result, the condensate in the steam ultimately determines the achievable outlet pressure, and thus to a large extent, the shaft power. • When the steam entering the turbine is super-heated steam (dry steam), the moment that condensate formation starts is delayed, and the steam pressure at the outlet of the turbine may be reduced. • The result is a higher shaft power. The design goal is that not the moisture content of the exhaust steam determines the pressure at the turbine outlet, but the temperature of the condenser cooling medium, usually the outside air or cooling water. • There is sufficient cooling water at AEB, so in principle a very deep vacuum could be achieved at the outlet of the turbine, but then extreme superheating of the boiler steam would be required. 14-1-2015Process optimisation
  • 7. Process Optimisation • However, the many corrosive constituents in the boiler’s combustion gases limit this temperature, since the already very expensive materials would corrode too quickly. • To break this circle of limited conversion rate, AEB opted for a two-stage turbine, reheating the steam between the two stages. • The steam – moderately superheated – flows through the first (high-pressure) stage of the steam turbine, up to a location where, approximately, condensation would start. • Here, a connection has been created in the turbine housing for the steam to exit. • This steam is then extremely superheated in a reheater and will enter the second (low-pressure) stage of the steam turbine as superheated steam. A very deep vacuum can now be achieved in this second stage. • Using a two-stage turbine with reheating increases the efficiency of the system by more than 30%, which means additional electricity production of over 30% from the same amount of fuel. 14-1-2015Process optimisation
  • 9. Process Optimisation • The high-pressure steam from the boiler (1) has a pressure of 130 bars. This means an evaporation temperature of 330˚C. • The steam flowing to the high-pressure stage (2) of the turbine is superheated by more than 100˚C. • After this high-pressure stage, the steam has a pressure of 14 bars at the corresponding temperature of more than 190˚C. • The steam first flows to the separators, where any water droplets formed in the turbine are collected and discharged. • The dry steam then goes to the superheater (position 6 in Fig 2.), where the temperature is increased by approximately 130˚C, from 190˚C to 320˚C. • A portion of the high-pressure steam is used as a heating medium. 14-1-2015Process optimisation
  • 10. Process Optimisation • The superheated low-pressure steam flows through the red pipes to the low- pressure stage of the turbine (4). • In addition to the separator and the reheater, both reheater units consist of a condensate vessel for the high-pressure condensate formed. • These vessels are necessary for controlling the units. The low pressure steam from the turbine is condensed in the condenser (5). • The high-pressure stage of the turbine and the low-pressure stage transfer their mechanical energy to the generator (3), where it is converted into electrical energy. • The reheater units were so crucial to realising a properly-working, highly-efficient installation that AEB decided to purchase the installations themselves directly. • When Bronswerk received the request for the reheaters, it proposed supplying the complete units, including separator, condensate vessel and the connecting piping. • The proper operation of the separator is crucial to the proper operation of the reheater. 14-1-2015Process optimisation
  • 11. Process Optimisation • To prevent having the warranty spread over two suppliers, it was wise to keep everything in one hand. • AEB gave Bronswerk the opportunity to supply the complete installations. • The proposal by Bronswerk Heat Transfer contained a surprising combination of techniques that together result in a compact and robust unit. • The High Pressure Compact Header, which had just been developed by Bronswerk, was provided for the high pressure steam. • To avoid vibrations due to high-flow rates of the low pressure steam in the condenser, a ‘no-tubes-in-windows’ type was used, while low-finned tubes provide good heat transfer to the low-pressure steam. • For a company aspiring to be a market leader, it is necessary to introduce a breakthrough development to the market. 14-1-2015Process optimisation
  • 12. Process Optimisation • The High Pressure Compact Header referred to here is just such a Bronswerk development. • It is also essential to know the discipline to the finest detail. This makes it possible to use the right combination of existing and new technologies. • This project shows that Bronswerk also masters these aspects. • AEB was so pleased with the design of the reheater unit that it also awarded Bronswerk the dump condenser. • Ultimately, AEB now has an incinerator with uniquely high efficiency. 14-1-2015Process optimisation
  • 13. Process Optimisation • Questions? • Ask Hans van Essen • essen@bronswerk.nl • Johan van der Kamp • kamp@bronswerk.nl • Or • +31 33 24 72 500 • info@bronswerk.com 14-1-2015Process optimisation
  • 14. Process Optimisation 14-1-2015Process optimisation • Like to know more about our company? • Have a chat with Bronswerk people via our website or • Visit our website: http://www.bronswerk.com/en/
  • 15. • Meet us on LinkedIn. • https://www.linkedin.com/company/bronswerk-heat- transfer/products?trk=top_nav_products 14-1-2015Process optimisation •Join our community!
  • 16. •Join our community! • Conversate with us on Facebook. • http://www.facebook.com/Bronswerk. Process optimisation 14-1-2015
  • 17. Join our community! • Follow us on Twitter. • https://twitter.com/bronswerk 14-1-2015Process optimisation
  • 18. • Share our content? http://www.slideshare.net/Bronswerk 14-1-2015Process optimisation Join our community!