SlideShare uma empresa Scribd logo
1 de 62
GOT BIM???
               Thirsty Thursdays
                    August 25, 2011

Larry Blackburn
Turner Construction Company
859-323-0395x105

Matt Gillies
Stites & Harbison, PLLC
502-681-0589
                                      3D BIM
Virtual Design and Construction -
3D - BUILDING INFORMATION MODELING – BIM
Larry Blackburn




                             3D BIM
Virtual Design and Construction
 • Mission:
   Improve Communication using 3D
   modeling to Visualize, Analyze,
   Simulate & Validate. Avoid Disruptions
   and Mistakes in the Construction
   Process. Build Digitally First.




                                      3D BIM
Design Visualization
Visualize building early in the process to
support and accelerate the decision
making process

Schedule Visualization
Visualize construction process to review
and optimize the construction sequence
and the schedule


 Design Validation
Integrate 3D models of all trades to
identify interferences and
constructability issues before they
materialize in the field
 Estimating
Tie scope of project to a price;
Manage scope changes more efficiently



                                             3D BIM
BIM – Design Validation
 • Overlay of discipline models

 • Early detection of conflicts and
   inconsistencies

 • Involve all disciplines and allow
   experts to bring their
   knowledge to bear

 • Throughout pre-construction
   and construction phase



                                       3D BIM
BIM – Design Validation




                          3D BIM
3D BIM
Construction Phase
g ne rs or 3    rd
                     p a r t y 3 D m o d e le r s
         A r c h it e c t u r a l D e s ig n     A r c h it e c t u r a l M o d e l

            S t r u c t u r a l D e s ig n         S truc tu ra l M o d e l
                                                                                        Tu r n e r

     M e c h a n i c a l S h o p d r a w i n g sM e c h a n i c a l M o d e l
                                                                                      In t e g r a t e d M o d e l
      P lu m b in g S h o p d r a w in g s          P lu m b in g M o d e l

      E le c t r ic a l S h o p d r a w in g s      E le c t r ic a l M o d e l

         O t h e r S h o p d r a w in g s             O the r M o d e l
                                                                                         Au to m a te d
      S u b c o ntra c to rs                                                             Cla s h De te c tio n



                R e vis io n o f                      C o o r d in a t io n              C la s h R e p o r t
                De s ig n                             M e e t in g


 F o r m a liz e d P r o c e s s
 S h o r t F e e d b a c k C y c Ee s u r e C o n s t r u c t a b i l i t y
                                 l ns
 R e lia b le C la s h C h e c k
                                                                         3D                             BIM
Harborview – Clash Report




                            3D BIM
iRoom – Harborview Medical Center




                              3D BIM
Turner iRooms




   Harborview       Millers Children’s     Univ. of KY




Sutter Sacramento   Salem Hospital       Boston University
                                                 3D BIM
iRoom – BU Medical Center                         Plumbing Coordinator
Fire Sprinkler Coordinator      Mech Pipe Coordinator




                 Electrical Coordinator                        Turner MEP Manager
Ductwork Coordinator             Turner Model Coordinator

                                                                                    3D BIM
Electrical J-Box




Access space for J-Box




                                        3D BIM
Reasonable Abstractions




    J-box w/access           VAV w/access




            Can light w/access
                                            3D BIM
Construction Process




                       3D BIM
Construction Process




                       3D BIM
Construction Process




                       3D BIM
Construction Process




                       3D BIM
Construction Process




                       3D BIM
Construction Process




                       3D BIM
Construction Process




                       3D BIM
Construction Process




                       3D BIM
Construction Process




                       3D BIM
Construction Process




                       3D BIM
Construction Process




                       3D BIM
Construction Process




                       3D BIM
BIM - Site Logistics




                       3D BIM
BIM - Site Logistics




                       3D BIM
BIM - Site Logistics




                       3D BIM
BIM - Site Logistics




                       3D BIM
Laser Scanning




                 3D BIM
Laser Scanning
 • Accurate documentation of
   existing conditions
 • Digital format for design
   coordination and validation

 • Leica HDS 4500
    – Indoor scans
    – On wheels
    – Effective range 0.3 … 20m
    – Scan time <1min
    – 3..5 scans per hour


                                  3D BIM
Laser Scanning
           C ondu
           it s
 D uc tw
 ork




                    C o lu m
                    n

                    M a in
                    D uc ts

                               3D BIM
3D Model Created From Point Cloud




                             3D BIM
Conclusion
 •   More reliable coordination
 •   Proactive problem resolution
 •   Reduce disruptions in the construction process
 •   Reduced risk

 •   Secondary effects
     – Less Change Orders
     – Increased confidence in coordination
     – Higher level of prefabrication

 •   Design Validation benefits all,
     The Owner, the General Contractor and the Subcontractors




                                                          3D BIM
Contact Information:
 • Larry Blackburn
 • Healthcare Account Executive
 • Email: lblackburn@tcco.com




                                  3D BIM
Contract & Legal Issues
with Building
Information Modeling




 Matthew A. Gillies
 Stites & Harbison, PLLC


                           3D BIM
Multiple Models – “Federation”
 •   Architectural Model
 •   Structural Model
 •   Mechanical Model
 •   Electrical Model
 •   Lighting Model
 •   Etc.
        • Some “Derivatives” of Others



                                         3D BIM
BIM Uses
 –   Design Visualization
 –   Structural Analysis
 –   Design Drawing Preparation
 –   Energy Analysis
 –   Systems Coordination
 –   Constructability Reviews (Clash Detection)
 –   Scheduling/Sequencing Reviews
 –   Site Planning/Utilization
 –   Cost Estimating
 –   Prefabrication
 –   Project Communications
 –   Model Integration
 –   Emergency Simulations
 –   Operations and Maintenance


                                                  3D BIM
BIM Benefits
     – Decreased Design Conflicts
     – Increased Budget/Schedule Control
     – Greater Dimensional Precision
     – Enhanced
       Communication/Collaboration Amongst
       Construction/Design Team
     – Improved As-Built Documentation
     – Improved Ability to Modularize and
       Prefabricate Building Components
     – Reduced Project Delivery Time

                                      3D BIM
BIM IS A GOOD IDEA

   “Best Way To Kill a
   Good Idea is to Bring
   in the Lawyers”


                     3D BIM
BIM Challenges

  – Momentum/Inertia Challenges
    • Delivery Methods
  – Technical Challenges <Interoperability>
  – Legal/Contractual Challenges




                                          3D BIM
BIM Legal/Contractual
Challenges
 • Does it alter traditional responsibilities of
   Owner, A/E, Contractors, Subcontractors,
   Suppliers?
 • What are Risks of Sharing Models?
 • How Should Intellectual Property Rights be
   handled?
 • Does BIM alter post-design or post-
   construction deliverables?
 • How can the contracts help, rather than stifle,
   the BIM process?

                                             3D BIM
Legal/Contractual Challenges (cont.)
  • Is BIM an additional service?
  • How is BIM to be reflected in the
    parties’ agreements?
  • Does BIM change who owns (or has
    the right to use) the design?
  • Who bears the risk of defective or sub-
    optimal software?
  • Insurance Issues?

                                      3D BIM
                                           44
Contract Mantras
 • Contract 3 “C”s
   – Clear
   – Coordinated
   – Consistent
 • Contract Risk Allocation
   – Control
   – Insured
   – Paid

                              3D BIM
Level of BIM Integration & Need for
“BIM Contract Language”
  • “Baby BIM” :Non-Integrated Use of BIM
    [Specific BIM Contract Language Not
    Needed]
       • Designers Use BIM to Assist With Design BUT
         only Deliver 2D Plans to Contractor
       • Contractors/Subs Might Use BIM to Create
         Owner Models for Means & Methods BUT Not
         Shared Back with Designer




                                               3D BIM
Level of BIM Integration & Need for
“BIM Contract Language”
 • “Toddler BIM” :Non-Integrated Use of BIM
   [Specific BIM Contract Language Not Needed]
      • Designers Use BIM to Assist With Design
      • Deliver 2D Plans to Contractor AND
      • Deliver Digital Model to Contractor BUT
         – With Broad Disclaimers (No Right To Rely)
 • MOST COMMON PRACTICE : Parallel Universe
   – Collaboration in Digital Models BUT
   – Documents Legally Governing Work Remain 2D
     plans/specs
   – Parties Must ensure that decisions made in modeling
     process reflected in contract documents (i.e. follow
     change order documentation process . . .do not
     assume agreement on model sufficient if legally using
     2d & not model for contract documents)
                                                       3D BIM
Level of BIM Integration & Need for
“BIM Contract Language”
  • “Grown-Up” or “Full BIM” .
    ..Integrated Use of BIM
  [Specific BIM Contract Language IS
    Needed]
      •   Designers Use BIM to Assist With Design
      •   Contractors Begin Modeling in Design Phase
      •   Model Sharing
      •   Subcontractor Modeling
      •   Early Collaboration

                                                 3D BIM
“Full BIM” What Needs to be in the
Contract?*
  •   Specific Models Required
  •   Milestones (when Models Available)
  •   A/E not resp. for M&M
  •   GC/Sub not resp. for design
      – Or, to the extent responsible
  • Downloading/uploading process
  • Specification as to who may modify a model
  • Definition of contract documents (whether any
    of the digital models will be CD)

                                           3D BIM
BIM Contract : What is Needed?*

• RFIs and designer responses documentation
• References in BIM protocol to the contract
  change provisions (how are changes/change
  orders handled)
• ID which aspects of shared models where
  reliance is permitted
• ID which parties may create derivative models
  from models of others
• Appropriate Compensation for Those
  Providing Models with Right of Reliance
                                       3D BIM
BIM Contract : What is Needed?
*
• Process for Creating Record Copies (read-only versions)
• Allocation of Risks for Data Degradation during transfer
• Waiver of CDs
• Model Manager Role/Specifics
• Force Majeure (including model damage & data loss)
• Intellectual Property Rights (creator of model owns
  model)
• Agreed-to standards of reliance
   – At least needs to be equivalent to their 2d versions
     (model info over and above what would have normally
     been available in 2d may/may not be info others can
     rely on)
    *Listing Info Compiled from Dwight Larson’s and Kate Golden’s 2008 white paper “Entering the
        Brave New World: An Introduction to Contracting for BIM”



                                                                                    3D BIM
BIM Contract Language
 Standard Forms are Good Starts . . .but Use Caution
     (should tailor to project and not simply pull off the
     shelf)
 *Corps of Engineers
 *ConsensusDOCS (CD 301) www.consensusDOCS.org
    –   Assumptions/Structure


 *American Institute of Architects (E202) www.aia.org
    –   Assumptions/Structure
    –   Model Element Table
    –   Level of Development


                                                   3D BIM
Building Information Modeling
CD 301- BIM Addendum

 • DOES NOT change party
   roles/relationships
 • DOES outline roles responsibilities in
   accordance with the contract
   documents
 • BIM Execution Plan


                                       3D BIM
CD 301 BIM Addendum – Risk
Allocation
 • Each Party Responsible for Contributions to
   Models (including access/modification of
   models by lower tier subcontractors)
 • Standards of care from governing contracts
   apply to each party
 • No Party shall be responsible for damages
   resulting from use of its Model beyond the
   uses set forth in the Addendum
 • Defects in the software for Model entitles
   parties to time extension “or other excuse
   from performance” . . . But duty to mitigate


                                           3D BIM
CD 301 BIM Addendum – The
Information Manager
  • Information Manager
   – Responsible for management of BIM
     program
   – Create/maintain/manage/delete user
     access
   – Record following info for each data entry in
     Model:
     • User Name & Role, Contact Info, Date/Time
   – Maintain Backup/Restore of all data
   – Selected by Owner
     • A/E, GC/CM, or “Other”
                                             3D BIM
CD 301 BIM Addendum – The BIM
Execution Plan
 •   30-day trigger (K & subsequent major subs)
 •   Model Manager (selected by O . . A/E, GC/CM,
     Other)
 •   Common coordinate system
 •   Convention as to units for Models
 •   File formats/structures/naming conventions
 •   Measures needed for interoperability
 •   How BIM to be utilized in RFI/Change Order
     processes
 •   Utilization of Project BIM website
 •   Extent of co-location of participants (BIM pit)
 •   Specification of Project Close-out & deliverables


                                                   3D BIM
CD 301 BIM Addendum – Intellectual
Property Rights
  • Each Party
   – Warrants that Party is
      • Owner of copyrights in its Contributions
      • Licensed/authorized by copyright holders
   – Indemnifies other parties from 3rd party
     claims arising out of infringement claims
   – Grants to other project participant license
     to use Contributions for purposes of
     Project

                                                   3D BIM
AIA BIM Protocol Exhibit
 • AIA Document E202 (2008) – Building
   Information Modeling Protocol Exhibit
   –   Focuses on modeling
   –   Sets forth protocols
   –   Addresses model ownership
   –   Parties responsibilities vis-à-vis the model
   –   LOD matrix




                                                      3D BIM
AIA E202 BIM Protocol Exhibit
  – Levels of development (LOD)
    • 100- “overall building massing, indicative of area,
      height, volume, location, and orientation”
    • 200- “generalized systems or assemblies with
      approximate quantities, size, shape, location”
    • 300- “ specific assemblies accurate in terms of
      quantity, size, shape, location and orientation.”
    • 400- “specific assemblies accurate in terms of size,
      shape, location, quantity and orientation with
      complete fabrication, assembly and detailing
      information.”
    • 500- “as constructed assemblies actual and
      accurate in terms of size, shape, location, quantity,
      and orientation.”                             3D BIM
                                                         59
AIA E202 BIM Protocol Exhibit
• Reliance on Model Elements
  – Model Element Table
  – Can Be Relied Upon in Accordance with
    MET
  – Any use/reliance inconsistent with LOD
    listed in MET shall be at user’s sole risk
    and without liability to Model Element
    Author
  – Indemnification of MEA if used inconsistent
    with LOD
                                             3D BIM
Other Legal Issues
 • Consequences of Model as Contract
   Doc
 • Standard of Care
 • Insurance Coverage
   – Model Design & Input
   – Software Issues
 • Liability Concerns for Post-Project Use
   for O&M
 • A/E “Responsible Control” of design
                                      3D BIM
QUESTIONS???




Matt Gillies (mgillies@stites.com)
Larry Blackburn (lblackburn@tcco.com)

                                        3D BIM

Mais conteúdo relacionado

Destaque

IPD and Sustainable Design at Trapelo Road
IPD and Sustainable Design at Trapelo RoadIPD and Sustainable Design at Trapelo Road
IPD and Sustainable Design at Trapelo RoadToronto 2030 District
 
3rd Qatar BIM User Day - International Experience Market Strategy-UK
3rd Qatar BIM User Day - International Experience Market Strategy-UK3rd Qatar BIM User Day - International Experience Market Strategy-UK
3rd Qatar BIM User Day - International Experience Market Strategy-UKBIM User Day
 
Il BIM come srumento di controllo della fase realizzativa
Il BIM come srumento di controllo della fase realizzativaIl BIM come srumento di controllo della fase realizzativa
Il BIM come srumento di controllo della fase realizzativaBIM group @ University of Padua
 
5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM Introduction5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM IntroductionBIM User Day
 
Elasstic eview presentation about BIM
Elasstic eview presentation about BIMElasstic eview presentation about BIM
Elasstic eview presentation about BIMLéon Berlo
 
BIM Show Live 2015 - Collaboration and IFC in the Netherlands
BIM Show Live 2015 - Collaboration and IFC in the NetherlandsBIM Show Live 2015 - Collaboration and IFC in the Netherlands
BIM Show Live 2015 - Collaboration and IFC in the NetherlandsLéon Berlo
 
Coordinamento e progettazione integrata: dal bim execution plan alla creazion...
Coordinamento e progettazione integrata: dal bim execution plan alla creazion...Coordinamento e progettazione integrata: dal bim execution plan alla creazion...
Coordinamento e progettazione integrata: dal bim execution plan alla creazion...BIM group @ University of Padua
 
Gatwick Airport Disruption 2013 - A Case Study
Gatwick Airport Disruption 2013 - A Case StudyGatwick Airport Disruption 2013 - A Case Study
Gatwick Airport Disruption 2013 - A Case StudySteelhenge
 
Example BIM Validation service with BIMSie
Example BIM Validation service with BIMSieExample BIM Validation service with BIMSie
Example BIM Validation service with BIMSieLéon Berlo
 
RTC AUS 2014 BIM in the Green Zone
RTC AUS 2014 BIM in the Green ZoneRTC AUS 2014 BIM in the Green Zone
RTC AUS 2014 BIM in the Green ZoneJason Howden
 
BIM in France - A journey from standard to dictionary
BIM in France - A journey from standard to dictionaryBIM in France - A journey from standard to dictionary
BIM in France - A journey from standard to dictionary Mariela Daskalova
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?Chun Keung Ng
 
BIM project execution
BIM project executionBIM project execution
BIM project executionStephen Au
 
Presentación1
Presentación1Presentación1
Presentación1Vicky
 

Destaque (17)

IPD and Sustainable Design at Trapelo Road
IPD and Sustainable Design at Trapelo RoadIPD and Sustainable Design at Trapelo Road
IPD and Sustainable Design at Trapelo Road
 
3rd Qatar BIM User Day - International Experience Market Strategy-UK
3rd Qatar BIM User Day - International Experience Market Strategy-UK3rd Qatar BIM User Day - International Experience Market Strategy-UK
3rd Qatar BIM User Day - International Experience Market Strategy-UK
 
Il BIM come srumento di controllo della fase realizzativa
Il BIM come srumento di controllo della fase realizzativaIl BIM come srumento di controllo della fase realizzativa
Il BIM come srumento di controllo della fase realizzativa
 
5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM Introduction5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM Introduction
 
Elasstic eview presentation about BIM
Elasstic eview presentation about BIMElasstic eview presentation about BIM
Elasstic eview presentation about BIM
 
BIM Show Live 2015 - Collaboration and IFC in the Netherlands
BIM Show Live 2015 - Collaboration and IFC in the NetherlandsBIM Show Live 2015 - Collaboration and IFC in the Netherlands
BIM Show Live 2015 - Collaboration and IFC in the Netherlands
 
Coordinamento e progettazione integrata: dal bim execution plan alla creazion...
Coordinamento e progettazione integrata: dal bim execution plan alla creazion...Coordinamento e progettazione integrata: dal bim execution plan alla creazion...
Coordinamento e progettazione integrata: dal bim execution plan alla creazion...
 
Gatwick Airport Disruption 2013 - A Case Study
Gatwick Airport Disruption 2013 - A Case StudyGatwick Airport Disruption 2013 - A Case Study
Gatwick Airport Disruption 2013 - A Case Study
 
Example BIM Validation service with BIMSie
Example BIM Validation service with BIMSieExample BIM Validation service with BIMSie
Example BIM Validation service with BIMSie
 
BIM from Designers Perspective - Rob Jackson
BIM from Designers Perspective - Rob JacksonBIM from Designers Perspective - Rob Jackson
BIM from Designers Perspective - Rob Jackson
 
RTC AUS 2014 BIM in the Green Zone
RTC AUS 2014 BIM in the Green ZoneRTC AUS 2014 BIM in the Green Zone
RTC AUS 2014 BIM in the Green Zone
 
InforMeDesign
InforMeDesignInforMeDesign
InforMeDesign
 
BIM in France - A journey from standard to dictionary
BIM in France - A journey from standard to dictionaryBIM in France - A journey from standard to dictionary
BIM in France - A journey from standard to dictionary
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 
Lean construction
Lean constructionLean construction
Lean construction
 
BIM project execution
BIM project executionBIM project execution
BIM project execution
 
Presentación1
Presentación1Presentación1
Presentación1
 

Semelhante a Got BIM?

Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIMBuilding Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIMYee Len Wan
 
BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014Stephen Au
 
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfFrom 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfVincentPoon15
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIMfitsum yonas
 
Dynamic duo of digital construction - BIM and digital twin
Dynamic duo of digital construction - BIM and digital twinDynamic duo of digital construction - BIM and digital twin
Dynamic duo of digital construction - BIM and digital twinSophiaAndrews1
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DYee Len Wan
 
BUILDING INFORMATION MODELLING BIM PPT.pdf
BUILDING INFORMATION MODELLING BIM PPT.pdfBUILDING INFORMATION MODELLING BIM PPT.pdf
BUILDING INFORMATION MODELLING BIM PPT.pdfSaniya661779
 
Scan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete GuideScan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete GuideChandresh Chudasama
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsTawwabKhan4
 
Integrating decision support systems (dss)and bim
Integrating decision support systems (dss)and bimIntegrating decision support systems (dss)and bim
Integrating decision support systems (dss)and bimOmar Selim
 
Bim&supply chain
Bim&supply chainBim&supply chain
Bim&supply chainOmar Selim
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controlsOmar Selim
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controlsOmar Selim
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controlsOmar Selim
 
Exploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D and 8D BIM
Exploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D and 8D BIMExploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D and 8D BIM
Exploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D and 8D BIMChandresh Chudasama
 
Building information modeling & value to the AEC industry Part 2
Building information modeling &  value to the AEC industry   Part 2Building information modeling &  value to the AEC industry   Part 2
Building information modeling & value to the AEC industry Part 2Stephen Au
 

Semelhante a Got BIM? (20)

Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIMBuilding Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
 
BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014
 
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfFrom 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
 
Dynamic duo of digital construction - BIM and digital twin
Dynamic duo of digital construction - BIM and digital twinDynamic duo of digital construction - BIM and digital twin
Dynamic duo of digital construction - BIM and digital twin
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7D
 
BUILDING INFORMATION MODELLING BIM PPT.pdf
BUILDING INFORMATION MODELLING BIM PPT.pdfBUILDING INFORMATION MODELLING BIM PPT.pdf
BUILDING INFORMATION MODELLING BIM PPT.pdf
 
Scan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete GuideScan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete Guide
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction Projects
 
Integrating decision support systems (dss)and bim
Integrating decision support systems (dss)and bimIntegrating decision support systems (dss)and bim
Integrating decision support systems (dss)and bim
 
Group 14 presentation.pptx
Group 14 presentation.pptxGroup 14 presentation.pptx
Group 14 presentation.pptx
 
Bim&supply chain
Bim&supply chainBim&supply chain
Bim&supply chain
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controls
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controls
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controls
 
Exploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D and 8D BIM
Exploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D and 8D BIMExploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D and 8D BIM
Exploring BIM Dimensions: 3D, 4D, 5D, 6D, 7D and 8D BIM
 
Bim
BimBim
Bim
 
Bim
BimBim
Bim
 
Nw b im_hub_-_march2013
Nw b im_hub_-_march2013Nw b im_hub_-_march2013
Nw b im_hub_-_march2013
 
Building information modeling & value to the AEC industry Part 2
Building information modeling &  value to the AEC industry   Part 2Building information modeling &  value to the AEC industry   Part 2
Building information modeling & value to the AEC industry Part 2
 

Mais de Stites & Harbison

Do You Really Own It? Copyrights in the Age of Cloud Computing
Do You Really Own It?  Copyrights in the Age of Cloud ComputingDo You Really Own It?  Copyrights in the Age of Cloud Computing
Do You Really Own It? Copyrights in the Age of Cloud ComputingStites & Harbison
 
Bankruptcy Construction Seminar, Stites & Harbison, PLLC
Bankruptcy Construction Seminar, Stites & Harbison, PLLCBankruptcy Construction Seminar, Stites & Harbison, PLLC
Bankruptcy Construction Seminar, Stites & Harbison, PLLCStites & Harbison
 
Government Construction Contracting, Part I: Procurement, Protests,and Debar...
Government Construction Contracting, Part I:  Procurement, Protests,and Debar...Government Construction Contracting, Part I:  Procurement, Protests,and Debar...
Government Construction Contracting, Part I: Procurement, Protests,and Debar...Stites & Harbison
 
What To Do When Customers Won't Pay
What To Do When Customers Won't PayWhat To Do When Customers Won't Pay
What To Do When Customers Won't PayStites & Harbison
 
OMG! My Employees Are On Facebook! Social Media From The Employment Perspective
OMG! My Employees Are On Facebook!  Social Media From The Employment PerspectiveOMG! My Employees Are On Facebook!  Social Media From The Employment Perspective
OMG! My Employees Are On Facebook! Social Media From The Employment PerspectiveStites & Harbison
 
Real Estate / Special Assets Seminar
Real Estate / Special Assets SeminarReal Estate / Special Assets Seminar
Real Estate / Special Assets SeminarStites & Harbison
 
Recent Developments in Aviation Law
Recent Developments in Aviation LawRecent Developments in Aviation Law
Recent Developments in Aviation LawStites & Harbison
 
Web 2.0..Business Friend or Foe?
Web 2.0..Business Friend or Foe?Web 2.0..Business Friend or Foe?
Web 2.0..Business Friend or Foe?Stites & Harbison
 

Mais de Stites & Harbison (10)

Do You Really Own It? Copyrights in the Age of Cloud Computing
Do You Really Own It?  Copyrights in the Age of Cloud ComputingDo You Really Own It?  Copyrights in the Age of Cloud Computing
Do You Really Own It? Copyrights in the Age of Cloud Computing
 
The EB-5 Visa Program
The EB-5 Visa ProgramThe EB-5 Visa Program
The EB-5 Visa Program
 
Bankruptcy Construction Seminar, Stites & Harbison, PLLC
Bankruptcy Construction Seminar, Stites & Harbison, PLLCBankruptcy Construction Seminar, Stites & Harbison, PLLC
Bankruptcy Construction Seminar, Stites & Harbison, PLLC
 
Government Construction Contracting, Part I: Procurement, Protests,and Debar...
Government Construction Contracting, Part I:  Procurement, Protests,and Debar...Government Construction Contracting, Part I:  Procurement, Protests,and Debar...
Government Construction Contracting, Part I: Procurement, Protests,and Debar...
 
What To Do When Customers Won't Pay
What To Do When Customers Won't PayWhat To Do When Customers Won't Pay
What To Do When Customers Won't Pay
 
OMG! My Employees Are On Facebook! Social Media From The Employment Perspective
OMG! My Employees Are On Facebook!  Social Media From The Employment PerspectiveOMG! My Employees Are On Facebook!  Social Media From The Employment Perspective
OMG! My Employees Are On Facebook! Social Media From The Employment Perspective
 
Real Estate / Special Assets Seminar
Real Estate / Special Assets SeminarReal Estate / Special Assets Seminar
Real Estate / Special Assets Seminar
 
Recent Developments in Aviation Law
Recent Developments in Aviation LawRecent Developments in Aviation Law
Recent Developments in Aviation Law
 
Web 2.0..Business Friend or Foe?
Web 2.0..Business Friend or Foe?Web 2.0..Business Friend or Foe?
Web 2.0..Business Friend or Foe?
 
Save Some Green
Save Some GreenSave Some Green
Save Some Green
 

Último

DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...Wes McKinney
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...panagenda
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Scott Andery
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditSkynet Technologies
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 

Último (20)

DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance Audit
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 

Got BIM?

  • 1. GOT BIM??? Thirsty Thursdays August 25, 2011 Larry Blackburn Turner Construction Company 859-323-0395x105 Matt Gillies Stites & Harbison, PLLC 502-681-0589 3D BIM
  • 2. Virtual Design and Construction - 3D - BUILDING INFORMATION MODELING – BIM Larry Blackburn 3D BIM
  • 3. Virtual Design and Construction • Mission: Improve Communication using 3D modeling to Visualize, Analyze, Simulate & Validate. Avoid Disruptions and Mistakes in the Construction Process. Build Digitally First. 3D BIM
  • 4. Design Visualization Visualize building early in the process to support and accelerate the decision making process Schedule Visualization Visualize construction process to review and optimize the construction sequence and the schedule Design Validation Integrate 3D models of all trades to identify interferences and constructability issues before they materialize in the field Estimating Tie scope of project to a price; Manage scope changes more efficiently 3D BIM
  • 5. BIM – Design Validation • Overlay of discipline models • Early detection of conflicts and inconsistencies • Involve all disciplines and allow experts to bring their knowledge to bear • Throughout pre-construction and construction phase 3D BIM
  • 6. BIM – Design Validation 3D BIM
  • 8. Construction Phase g ne rs or 3 rd p a r t y 3 D m o d e le r s A r c h it e c t u r a l D e s ig n A r c h it e c t u r a l M o d e l S t r u c t u r a l D e s ig n S truc tu ra l M o d e l Tu r n e r M e c h a n i c a l S h o p d r a w i n g sM e c h a n i c a l M o d e l In t e g r a t e d M o d e l P lu m b in g S h o p d r a w in g s P lu m b in g M o d e l E le c t r ic a l S h o p d r a w in g s E le c t r ic a l M o d e l O t h e r S h o p d r a w in g s O the r M o d e l Au to m a te d S u b c o ntra c to rs Cla s h De te c tio n R e vis io n o f C o o r d in a t io n C la s h R e p o r t De s ig n M e e t in g F o r m a liz e d P r o c e s s S h o r t F e e d b a c k C y c Ee s u r e C o n s t r u c t a b i l i t y l ns R e lia b le C la s h C h e c k 3D BIM
  • 9. Harborview – Clash Report 3D BIM
  • 10. iRoom – Harborview Medical Center 3D BIM
  • 11. Turner iRooms Harborview Millers Children’s Univ. of KY Sutter Sacramento Salem Hospital Boston University 3D BIM
  • 12. iRoom – BU Medical Center Plumbing Coordinator Fire Sprinkler Coordinator Mech Pipe Coordinator Electrical Coordinator Turner MEP Manager Ductwork Coordinator Turner Model Coordinator 3D BIM
  • 13. Electrical J-Box Access space for J-Box 3D BIM
  • 14. Reasonable Abstractions J-box w/access VAV w/access Can light w/access 3D BIM
  • 27. BIM - Site Logistics 3D BIM
  • 28. BIM - Site Logistics 3D BIM
  • 29. BIM - Site Logistics 3D BIM
  • 30. BIM - Site Logistics 3D BIM
  • 31. Laser Scanning 3D BIM
  • 32. Laser Scanning • Accurate documentation of existing conditions • Digital format for design coordination and validation • Leica HDS 4500 – Indoor scans – On wheels – Effective range 0.3 … 20m – Scan time <1min – 3..5 scans per hour 3D BIM
  • 33. Laser Scanning C ondu it s D uc tw ork C o lu m n M a in D uc ts 3D BIM
  • 34. 3D Model Created From Point Cloud 3D BIM
  • 35. Conclusion • More reliable coordination • Proactive problem resolution • Reduce disruptions in the construction process • Reduced risk • Secondary effects – Less Change Orders – Increased confidence in coordination – Higher level of prefabrication • Design Validation benefits all, The Owner, the General Contractor and the Subcontractors 3D BIM
  • 36. Contact Information: • Larry Blackburn • Healthcare Account Executive • Email: lblackburn@tcco.com 3D BIM
  • 37. Contract & Legal Issues with Building Information Modeling Matthew A. Gillies Stites & Harbison, PLLC 3D BIM
  • 38. Multiple Models – “Federation” • Architectural Model • Structural Model • Mechanical Model • Electrical Model • Lighting Model • Etc. • Some “Derivatives” of Others 3D BIM
  • 39. BIM Uses – Design Visualization – Structural Analysis – Design Drawing Preparation – Energy Analysis – Systems Coordination – Constructability Reviews (Clash Detection) – Scheduling/Sequencing Reviews – Site Planning/Utilization – Cost Estimating – Prefabrication – Project Communications – Model Integration – Emergency Simulations – Operations and Maintenance 3D BIM
  • 40. BIM Benefits – Decreased Design Conflicts – Increased Budget/Schedule Control – Greater Dimensional Precision – Enhanced Communication/Collaboration Amongst Construction/Design Team – Improved As-Built Documentation – Improved Ability to Modularize and Prefabricate Building Components – Reduced Project Delivery Time 3D BIM
  • 41. BIM IS A GOOD IDEA “Best Way To Kill a Good Idea is to Bring in the Lawyers” 3D BIM
  • 42. BIM Challenges – Momentum/Inertia Challenges • Delivery Methods – Technical Challenges <Interoperability> – Legal/Contractual Challenges 3D BIM
  • 43. BIM Legal/Contractual Challenges • Does it alter traditional responsibilities of Owner, A/E, Contractors, Subcontractors, Suppliers? • What are Risks of Sharing Models? • How Should Intellectual Property Rights be handled? • Does BIM alter post-design or post- construction deliverables? • How can the contracts help, rather than stifle, the BIM process? 3D BIM
  • 44. Legal/Contractual Challenges (cont.) • Is BIM an additional service? • How is BIM to be reflected in the parties’ agreements? • Does BIM change who owns (or has the right to use) the design? • Who bears the risk of defective or sub- optimal software? • Insurance Issues? 3D BIM 44
  • 45. Contract Mantras • Contract 3 “C”s – Clear – Coordinated – Consistent • Contract Risk Allocation – Control – Insured – Paid 3D BIM
  • 46. Level of BIM Integration & Need for “BIM Contract Language” • “Baby BIM” :Non-Integrated Use of BIM [Specific BIM Contract Language Not Needed] • Designers Use BIM to Assist With Design BUT only Deliver 2D Plans to Contractor • Contractors/Subs Might Use BIM to Create Owner Models for Means & Methods BUT Not Shared Back with Designer 3D BIM
  • 47. Level of BIM Integration & Need for “BIM Contract Language” • “Toddler BIM” :Non-Integrated Use of BIM [Specific BIM Contract Language Not Needed] • Designers Use BIM to Assist With Design • Deliver 2D Plans to Contractor AND • Deliver Digital Model to Contractor BUT – With Broad Disclaimers (No Right To Rely) • MOST COMMON PRACTICE : Parallel Universe – Collaboration in Digital Models BUT – Documents Legally Governing Work Remain 2D plans/specs – Parties Must ensure that decisions made in modeling process reflected in contract documents (i.e. follow change order documentation process . . .do not assume agreement on model sufficient if legally using 2d & not model for contract documents) 3D BIM
  • 48. Level of BIM Integration & Need for “BIM Contract Language” • “Grown-Up” or “Full BIM” . ..Integrated Use of BIM [Specific BIM Contract Language IS Needed] • Designers Use BIM to Assist With Design • Contractors Begin Modeling in Design Phase • Model Sharing • Subcontractor Modeling • Early Collaboration 3D BIM
  • 49. “Full BIM” What Needs to be in the Contract?* • Specific Models Required • Milestones (when Models Available) • A/E not resp. for M&M • GC/Sub not resp. for design – Or, to the extent responsible • Downloading/uploading process • Specification as to who may modify a model • Definition of contract documents (whether any of the digital models will be CD) 3D BIM
  • 50. BIM Contract : What is Needed?* • RFIs and designer responses documentation • References in BIM protocol to the contract change provisions (how are changes/change orders handled) • ID which aspects of shared models where reliance is permitted • ID which parties may create derivative models from models of others • Appropriate Compensation for Those Providing Models with Right of Reliance 3D BIM
  • 51. BIM Contract : What is Needed? * • Process for Creating Record Copies (read-only versions) • Allocation of Risks for Data Degradation during transfer • Waiver of CDs • Model Manager Role/Specifics • Force Majeure (including model damage & data loss) • Intellectual Property Rights (creator of model owns model) • Agreed-to standards of reliance – At least needs to be equivalent to their 2d versions (model info over and above what would have normally been available in 2d may/may not be info others can rely on) *Listing Info Compiled from Dwight Larson’s and Kate Golden’s 2008 white paper “Entering the Brave New World: An Introduction to Contracting for BIM” 3D BIM
  • 52. BIM Contract Language Standard Forms are Good Starts . . .but Use Caution (should tailor to project and not simply pull off the shelf) *Corps of Engineers *ConsensusDOCS (CD 301) www.consensusDOCS.org – Assumptions/Structure *American Institute of Architects (E202) www.aia.org – Assumptions/Structure – Model Element Table – Level of Development 3D BIM
  • 53. Building Information Modeling CD 301- BIM Addendum • DOES NOT change party roles/relationships • DOES outline roles responsibilities in accordance with the contract documents • BIM Execution Plan 3D BIM
  • 54. CD 301 BIM Addendum – Risk Allocation • Each Party Responsible for Contributions to Models (including access/modification of models by lower tier subcontractors) • Standards of care from governing contracts apply to each party • No Party shall be responsible for damages resulting from use of its Model beyond the uses set forth in the Addendum • Defects in the software for Model entitles parties to time extension “or other excuse from performance” . . . But duty to mitigate 3D BIM
  • 55. CD 301 BIM Addendum – The Information Manager • Information Manager – Responsible for management of BIM program – Create/maintain/manage/delete user access – Record following info for each data entry in Model: • User Name & Role, Contact Info, Date/Time – Maintain Backup/Restore of all data – Selected by Owner • A/E, GC/CM, or “Other” 3D BIM
  • 56. CD 301 BIM Addendum – The BIM Execution Plan • 30-day trigger (K & subsequent major subs) • Model Manager (selected by O . . A/E, GC/CM, Other) • Common coordinate system • Convention as to units for Models • File formats/structures/naming conventions • Measures needed for interoperability • How BIM to be utilized in RFI/Change Order processes • Utilization of Project BIM website • Extent of co-location of participants (BIM pit) • Specification of Project Close-out & deliverables 3D BIM
  • 57. CD 301 BIM Addendum – Intellectual Property Rights • Each Party – Warrants that Party is • Owner of copyrights in its Contributions • Licensed/authorized by copyright holders – Indemnifies other parties from 3rd party claims arising out of infringement claims – Grants to other project participant license to use Contributions for purposes of Project 3D BIM
  • 58. AIA BIM Protocol Exhibit • AIA Document E202 (2008) – Building Information Modeling Protocol Exhibit – Focuses on modeling – Sets forth protocols – Addresses model ownership – Parties responsibilities vis-à-vis the model – LOD matrix 3D BIM
  • 59. AIA E202 BIM Protocol Exhibit – Levels of development (LOD) • 100- “overall building massing, indicative of area, height, volume, location, and orientation” • 200- “generalized systems or assemblies with approximate quantities, size, shape, location” • 300- “ specific assemblies accurate in terms of quantity, size, shape, location and orientation.” • 400- “specific assemblies accurate in terms of size, shape, location, quantity and orientation with complete fabrication, assembly and detailing information.” • 500- “as constructed assemblies actual and accurate in terms of size, shape, location, quantity, and orientation.” 3D BIM 59
  • 60. AIA E202 BIM Protocol Exhibit • Reliance on Model Elements – Model Element Table – Can Be Relied Upon in Accordance with MET – Any use/reliance inconsistent with LOD listed in MET shall be at user’s sole risk and without liability to Model Element Author – Indemnification of MEA if used inconsistent with LOD 3D BIM
  • 61. Other Legal Issues • Consequences of Model as Contract Doc • Standard of Care • Insurance Coverage – Model Design & Input – Software Issues • Liability Concerns for Post-Project Use for O&M • A/E “Responsible Control” of design 3D BIM
  • 62. QUESTIONS??? Matt Gillies (mgillies@stites.com) Larry Blackburn (lblackburn@tcco.com) 3D BIM