2. Index
• Protection Company Profile
• Products & Services
• Benefits Gained
• Hydrophobic Impregnation Product Detail (How It Works !)
• H&S- Environmental credentials
• Application
• Limitations & Guidance
• Quality Endorsement
• Customer & Project Endorsement
• Testing Approvals, Guarantees, & Quality Endorsements
• Sales / Product Development
• Current Projects
3. Protection Company Profile
• Manufacturing company Established 2007
• Protected 3,000,000M2 To Date (UK’s Largest Supplier Of
Fluropolymers)
• Researched, Developed & Manufactured In The UK
• Delivery Lead Time 3 – 5 Days
• Main Contact / Supplier Neil Weston (Bak2Basiks Ltd)
Construction / Commercial / Manufacturing Specialist.
• Evas – UK Ltd supporting manufacture, technical support &
research – product development
• Onsite Application Training Available including Training
Records ..etc
• Full Chemical Design / Professional Support
• Full H&S & Compliance Support
4. Products & Services
• Protection / Impregnations
• Cleaning Products
• Rust Removers
• Efflorescence Removers
• Paints
• Bespoke Sealants & Cleaners: Designed as per customers
specification.
• Full chemist design service available
• Application Labour
• Application Equipment
7. Benefits Gained Using B2B 100 Hydrophobic
Surface Treatment
Graffiti Resistance
Prevents Efflorescence
Freeze Thaw prevention
Prevents Organic Growth (Moss, Lichen)
Protects From Environmental Erosion
Extends Natural Life Of Concrete
Allows Treated Surface To Breath
Repels External Surface Water
Easy Clean, Offering Quicker Turnaround
Suitable for Vertical & Horizontal Protection
>10 Yrs Of Functionality. Guarantee Backed, Subject To
Application.
8. B2B 100 Product Detail (How It Works !)
Hydrphobic Surface Treatment Is An Engineered Aqueous
FluoroPolymer Solution
Flourine (Main Constituent) Is The Most Electronegative
Element.
Controlling the Flourine Distribution On The Substrate
Generates The Products Protection Performance
The Tighter The Distribution The Higher The Protection, The
Interstitial Voids Allow Vapour To Pass Out !
The Water Leaves Via Evaporation, The Fluropolymer Is Left
Behind, Delivering High Level Sustainable Protection
9. B2B 100 Product Detail (How It Works !)
Fluropolymer Entropy Distribution Diagram
Disordered Distribution
Surface Energy = 20+ mN/m
Controlled Distribution
Surface Energy = 15-20 mN/m
Ordered Distribution
Surface Energy = <10 mN/m
Ordered Distribution Offers High Performance Protection !
10. H&S / Environmental Credentials
REACH (Registration Evaluation Authorisation & Restriction Of
CHemicals ) HSE compliant
VOC Free
95% + Bio Degradable
Water Based
Silicone & Solvent Free
UV Resistant
Resistant to Acids & Alkaline
Chemically inert
No H&S Restrictions
No Specialised PPE Required
11. Application
Single Process, 2 Coat Application “Wet On Wet”
Ready To Use Solution On “Fresh” & Aged Concrete
One Product For All Porous Substrates
Enhanced Wet Look & Pigmented Protection Available
5 -10M2 Coverage Per Litre
Applied Via Low Pressure Spray Or Roller / Brush
12. Limitations & Guidance
o Surface Moisture Must Be Below < 5% NB: A Bespoke
Blend Can Be Produced For Higher Moisture contents
o Ambient Application Temperature Should Be above >5c
o Touch Dry In 4 Hrs
o Dry In 24 Hrs
o 5 – 7 Days Required For Optimum Graffiti Performance
13. Customers & Project Endorsements
o Cross Rail
o Network Rail
o O2 Arena
o Wembley Stadium
o Several Olympic Projects
o Local Authority
o National Heavy Civil Product Producers (UK & Ireland)
o National Main Contractors
14. Testing Approvals , Guarantees & Quality
Endorsements
1: AATCC 22-1985, Water Repellency, Spray Test, Score 100
(ISO 5).
2: AATCC 118-1992, Oil Repellency, Hydrocarbon Resistance
Test, Grade A.
3: European DIN/Norm 52615, Vapour Permeability, Treated
Surface Remains > 90% Permeable.
4: Working To ISO 9001 – 14001 Standards
15. Sales / Product Development Process
o Written Introduction
o Site Trials
o Agreement Of Suitability , Sustainability & Conformity
o H&S Compliance Audit, Ensuring That We Are Compliant To
Customer Expectation
o Onsite Training, Including Training Records
o Order Processed
o Minimum 1 Day On Site Supporting Application (Day Rate
TBC)
o Application Can Be Organised “Supply & Apply”
16. Current Projects
o Supplying national hard landscaping company. B2B 100
Protection now being applied to specific product range
o Drainage Manufacturer using B2B 800 to clean & maintain
production mouldage
o Working in partnership with manufacturer to remove risk of
acidic corrosion on pipes & manholes ..etc
o Supporting NET 2 Phase II Nottingham Tramway Extension
o Developing protection for retaining wall units
o Developing utility sector opportunities
17. Efflorescence Removal & Protection Example
Cleaning Process: B2B 800 Hand Brushed on Affected Area Pressure Washed (2
Pass’s) Allowed To Dry Protected With B2B Protection
How It Works : Efflorescence travels to the surface via moisture B2B 800
neutralises the ace spoil Pressure washing removes the residue Allowed to
dry B2B 100 Protection applied Residue will then need to washed 2-3 times
until totally expended from treated area B2B 100 stops moisture entering the
surface, stopping future surface spoiling.
18. Project Of Interest
DUNDERAVE CASTLE INVERARAY JULY 2012
Project: 5 year restoration & rebuild of the 16th Century Castle
All Stone & Roof Tiles were coated & protected
The project has gained a National Stone Federation award.
Kevin McCloud is involved in the award, & is endorsing the
future use of the product