Resource Planning
Lecture Outline ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
Resource Planning  for  Manufacturing 15-
Material Requirements Planning (MRP) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
Demand Characteristics 15- 1 2 3 4 5 Week 400 – 300 – 200 – 100 – No. of tables Continuous demand M  T  W  Th  F  M  T  W  Th  F 400 – 300 – 200 – 100 – No. of tables Discrete demand Independent demand 100 tables Dependent demand 100 x 1 =  100 tabletops 100 x 4 = 400 table legs
Material Requirements Planning 15- Material requirements planning Planned order releases Work orders Purchase orders Rescheduling notices Item master  file Product structure  file Master production schedule
MRP Inputs and Outputs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
Master Production Schedule ,[object Object],[object Object],[object Object],[object Object],[object Object],15-
15- Master Production Schedule PERIOD MPS ITEM 1 2 3 4 5 Pencil Case 125 125 125 125 125 Clipboard 85 95 120 100 100 Lapboard 75 120 47 20 17 Lapdesk 0 50 0 50 0
Product Structure File 15-
Product Structure 15- Top clip (1) Bottom clip (1) Pivot (1) Spring (1) Rivets (2) Finished clipboard Pressboard (1) Clipboard
Product Structure Tree 15- Clipboard Level 0 Level 1 Level 2 Spring  (1) Bottom Clip (1) Top Clip (1) Pivot  (1) Rivets (2) Clip Ass’y  (1) Pressboard (1)
Multilevel Indented BOM 15- 0 - - - - Clipboard ea 1 - 1 - - - Clip Assembly ea 1 - - 2 - - Top Clip ea 1 - - 2 - - Bottom Clip ea 1 - - 2 - - Pivot ea 1 - - 2 - - Spring ea 1 - 1 - - - Rivet ea 2 - 1 - - - Press Board ea 1 LEVEL ITEM UNIT OF MEASURE QUANTITY
Specialized BOMs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
Specialized BOMs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
Modular BOMs 15- 4-Cylinder (.40) Bright red (.10) Leather (.20) Grey (.10) Sports coupe (.20) 6-Cylinder (.50) White linen (.10) Tweed (.40) Light blue (.10) Two-door (.20) 8-Cylinder (.10) Sulphur yellow (.10) Plush (.40) Rose (.10) Four-door (.30) Neon orange (.10) Off-white (.20) Station wagon (.30) Metallic blue (.10) Cool green (.10) Emerald green (.10) Black (.20) Jet black (.20) Brown (.10) Champagne (.20) B/W checked (.10) X10 Automobile Engines Exterior color Interior Interior color Body (1 of 3) (1 of 8) (1 of 3) (1 of 8) (1 of 4)
Time-phased Bills ,[object Object],15-
Time-phased Bills ,[object Object],[object Object],[object Object],[object Object],15-
Item Master File 15- DESCRIPTION INVENTORY POLICY Item Pressboard Lead time 1 Item no. 7341 Annual demand 5000 Item type Purch Holding cost 1 Product/sales class Comp Ordering/setup cost 50 Value class B Safety stock  0 Buyer/planner RSR Reorder point 39 Vendor/drawing 07142 EOQ 316 Phantom code N Minimum order qty 100 Unit price/cost 1.25 Maximum order qty 500 Pegging Y Multiple order qty 1 LLC 1 Policy code 3
15- Item Master File On hand 150 YTD usage/sales 1100 Location W142 MTD usage/sales 75 On order 100 YTD receipts 1200 Allocated 75 MTD receipts 0 Cycle 3 Last receipt 8/25 Last count 9/5 Last issue 10/5 Difference -2  Cost acct. 00754 Routing 00326 Engr 07142 PHYSICAL INVENTORY USAGE/SALES CODES
MRP Processes ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
15- MRP Matrix
MRP 15- Master Production Schedule 1 2 3 4 5 Clipboard 85 95 120 100 100 Lapdesk 0 60 0 60 0 Item Master File CLIPBOARD LAPDESK PRESSBOARD On hand 25 20 150 On order 175 (Period 1) 0 0 (sch receipt) LLC 0 0 1 Lot size L4L Mult 50 Min 100 Lead time 1 1 1
MRP 15- Product Structure Record Clipboard Lapdesk Pressboard (2) Trim (3’) Beanbag (1) Glue (4 oz) Level 0 Level 0 Pressboard (1) Clip Ass’y (1) Rivets (2) Level 1 Level 1
15- MRP - 1 ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Gross Requirements 85 95 120 100 100 Scheduled Receipts 175 Projected on Hand 25 Net Requirements Planned Order Receipts Planned Order Releases
15- MRP  - 2 ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Gross Requirements 85 95 120 100 100 Scheduled Receipts 175 Projected on Hand 25 115 Net Requirements 0 Planned Order Receipts Planned Order Releases (25 + 175) = 200 units available (200 - 85) = 115 on hand at the end of Period 1
15- MRP - 3 ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Gross Requirements 85 95 120 100 100 Scheduled Receipts 175 Projected on Hand 25 115 20 Net Requirements 0 0 Planned Order Receipts Planned Order Releases 115 units available (115 - 85) = 20 on hand at the end of Period 2
15- MRP - 4 ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Gross Requirements 85 95 120 100 100 Scheduled Receipts 175 Projected on Hand 25 115 20 0 Net Requirements 0 0 100 Planned Order Receipts 100 Planned Order Releases 100 20 units available (20 - 120) = -100 — 100 additional Clipboards are required Order must be placed in Period 2 to be received in Period 3
15- MRP - 5 ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Gross Requirements 85 95 120 100 100 Scheduled Receipts 175 Projected on Hand 25 115 20 0 0 0 Net Requirements 0 0 100 100 100 Planned Order Receipts 100 100 100 Planned Order Releases 100 100 100 Following the same logic Gross Requirements in Periods 4 and 5 develop Net Requirements, Planned Order Receipts, and Planned Order Releases
15- MRP - 6 ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: 1 1 2 3 4 5 Gross Requirements 0 60 0 60 0 Scheduled Receipts Projected on Hand 20 Net Requirements Planned Order Receipts Planned Order Releases
15- MRP - 7 ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: 1 1 2 3 4 5 Gross Requirements 0 60 0 60 0 Scheduled Receipts Projected on Hand 20 20 10 10 0 0 Net Requirements 0 40 50 Planned Order Receipts 50 50 Planned Order Releases 50 50 Following the same logic, the Lapdesk MRP matrix is completed as shown
15- MRP - 8 ITEM: PRESSBOARD LLC: 0 PERIOD LOT SIZE: MIN 100 LT: 1 1 2 3 4 5 Gross Requirements Scheduled Receipts Projected on Hand 150 Net Requirements Planned Order Receipts Planned Order Releases ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Planned Order Releases 100 100 100 ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: 1 1 2 3 4 5 Planned Order Releases 50 50
15- MRP – 9 ITEM: PRESSBOARD LLC: 0 PERIOD LOT SIZE: MIN 100 LT: 1 1 2 3 4 5 Gross Requirements  100 100 200 100 0 Scheduled Receipts Projected on Hand 150 Net Requirements Planned Order Receipts Planned Order Releases ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Planned Order Releases 100 100 100 ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: 1 1 2 3 4 5 Planned Order Releases 50 50 x1 x1 x1 x2 x2
15- MRP – 10 ITEM: PRESSBOARD LLC: 0 PERIOD LOT SIZE: MIN 100 LT: 1 1 2 3 4 5 Gross Requirements  100 100 200 100 0 Scheduled Receipts Projected on Hand 150 50 50 0 0 Net Requirements 50 150 100 Planned Order Receipts 100 150 100 Planned Order Releases 100 150 100 ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Planned Order Releases 100 100 100 ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: 1 1 2 3 4 5 Planned Order Releases 50 50 x1 x1 x1 x2 x2
15- MRP - 11 PERIOD ITEM 1 2 3 4 5 Clipboard 100 100 100 Lapdesk 50 50 Pressboard 100 150 100 Planned Order Report
Lot Sizing in MRP Systems ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
Advanced Lot Sizing Rules: L4L 15- Total cost of L4L = (4 X $60) + (0 X $1) = $240
Advanced Lot Sizing Rules: EOQ 15- minimum order quantity Total cost of EOQ = (2 X $60) + [(10 + 50 + 40) X $1)] = $220
Advanced Lot Sizing Rules: POQ 15- periods worth of requirements  Total cost of POQ = (2 X $60) + [(20 + 40) X $1] = $180
Planned Order Report 15- Item #2740 Date 9 - 25 - 05 On hand 100 Lead time 2 weeks On order 200 Lot size 200 Allocated 50 Safety stock 50 SCHEDULED PROJECTED DATE ORDER NO. GROSS REQS. RECEIPTS ON HAND ACTION 50 9-26 AL 4416 25 25 9-30 AL 4174 25 0 10-01 GR 6470 50 - 50 10-08 SR 7542 200 150 Expedite SR 10-01 10-10 CO 4471 75 75 10-15 GR 6471 50 25 10-23 GR 6471 25 0 10-27 GR 6473 50 - 50 Release PO 10-13 Key: AL = allocated WO = work order CO = customer order SR = scheduled receipt PO = purchase order GR = gross requirement
MRP Action Report 15- ITEM DATE ORDER NO. QTY. ACTION #2740 10-08 7542 200 Expedite SR 10-01 #3616 10-09 Move forward PO 10-07 #2412 10-10 Move forward PO 10-05 #3427 10-15 Move backward PO 10-25 #2516 10-20 7648 100 De-expedite SR 10-30 #2740 10-27 200 Release PO 10-13 #3666 10-31 50 Release WO 10-24 Current date 9-25-08
Capacity Requirements Planning (CRP) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
CRP 15- MRP planned order releases Routing file Capacity requirements planning Open orders file Load profile for each process
Calculating Capacity ,[object Object],[object Object],[object Object],[object Object],[object Object],15- Effective Daily Capacity = (no. of machines or workers) x (hours per shift) x (no. of shifts) x (utilization) x ( efficiency)
Calculating Capacity ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15- Load Percent =  x 100% load capacity
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15- Load Profiles
Reducing Over-load Conditions ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
Copy Courier ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
Copy Courier ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
Load Calculations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
Loading ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
15- Initial Load Profile Hours of capacity 1 2 3 4 5 6 Time (weeks) Normal capacity 120 – 110 – 100 – 90 – 80 – 70 – 60 – 50 – 40 – 30 – 20 – 10 – 0 –
15- Adjusted Load Profile Hours of capacity 1 2 3 4 5 6 Time (weeks) Normal capacity 120 – 110 – 100 – 90 – 80 – 70 – 60 – 50 – 40 – 30 – 20 – 10 – 0 – Pull ahead Push back Push back Overtime Work an extra shift
Relaxing MRP Assumptions ,[object Object],[object Object],[object Object],[object Object],[object Object],15-
Enterprise Resource Planning (ERP) ,[object Object],[object Object],[object Object],[object Object],[object Object],15-
Organizational Data Flows 15-
ERP’s Central Database 15- ,[object Object]
Selected Enterprise Software Vendors 15-
ERP Implementation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
Customer Relationship Management (CRM) ,[object Object],[object Object],[object Object],[object Object],[object Object],15-
Supply Chain Management ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-
Product Lifecycle Management (PLM) ,[object Object],[object Object],[object Object],15-
ERP and Software Systems 15-
Connectivity ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],15-

More Related Content

Similar to Resource planningppt @ DOMS

MFord SSIE598 MRP v Lean
MFord SSIE598 MRP v LeanMFord SSIE598 MRP v Lean
MFord SSIE598 MRP v LeanMichael Ford
 
Essbase Calculations A Visual Approach KScope 2010
Essbase Calculations A Visual Approach KScope 2010Essbase Calculations A Visual Approach KScope 2010
Essbase Calculations A Visual Approach KScope 2010Ron Moore
 
6714600 sap-production-planning-table
6714600 sap-production-planning-table6714600 sap-production-planning-table
6714600 sap-production-planning-tableSanjeev Malik
 
6714600 sap-production-planning-table
6714600 sap-production-planning-table 6714600 sap-production-planning-table
6714600 sap-production-planning-table Sanjeev Malik
 
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.pptFactory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.pptNittamallik216
 
Sap tables-list -SAP ABAP Training institute in Pune
Sap tables-list -SAP ABAP Training institute in PuneSap tables-list -SAP ABAP Training institute in Pune
Sap tables-list -SAP ABAP Training institute in PuneAspire Techsoft Academy
 
SAP Tables and entries.pdf
SAP Tables and entries.pdfSAP Tables and entries.pdf
SAP Tables and entries.pdfabilash86
 
Data Mapping - SCSALE COPYBOOK MAPPING PRELIM GUIDE
Data Mapping - SCSALE COPYBOOK MAPPING PRELIM GUIDEData Mapping - SCSALE COPYBOOK MAPPING PRELIM GUIDE
Data Mapping - SCSALE COPYBOOK MAPPING PRELIM GUIDEJon Fortman
 
1. What is operations management Why is it important Is a good k.docx
1. What is operations management Why is it important Is a good k.docx1. What is operations management Why is it important Is a good k.docx
1. What is operations management Why is it important Is a good k.docxjackiewalcutt
 
Scheduling by Primavera - Training
Scheduling by Primavera - TrainingScheduling by Primavera - Training
Scheduling by Primavera - TrainingMohammed Feroze
 
Cost n profit analysis
Cost n profit analysisCost n profit analysis
Cost n profit analysisVibha Bhan
 
Value stream mapping (future state)
Value stream mapping (future state)Value stream mapping (future state)
Value stream mapping (future state)nestor martinez
 
Value stream mapping (current state)
Value stream mapping (current state)Value stream mapping (current state)
Value stream mapping (current state)nestor martinez
 
Lean_Basics_Part_II_Rev4.ppt
Lean_Basics_Part_II_Rev4.pptLean_Basics_Part_II_Rev4.ppt
Lean_Basics_Part_II_Rev4.pptEndi Kustamsi
 

Similar to Resource planningppt @ DOMS (20)

MFord SSIE598 MRP v Lean
MFord SSIE598 MRP v LeanMFord SSIE598 MRP v Lean
MFord SSIE598 MRP v Lean
 
Essbase Calculations A Visual Approach KScope 2010
Essbase Calculations A Visual Approach KScope 2010Essbase Calculations A Visual Approach KScope 2010
Essbase Calculations A Visual Approach KScope 2010
 
6714600 sap-production-planning-table
6714600 sap-production-planning-table6714600 sap-production-planning-table
6714600 sap-production-planning-table
 
6714600 sap-production-planning-table
6714600 sap-production-planning-table 6714600 sap-production-planning-table
6714600 sap-production-planning-table
 
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.pptFactory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
Factory Monthly KPI OF KRC(U-1,2), January to July-2022.ppt
 
Log11 uitwerking opdrachten
Log11 uitwerking opdrachtenLog11 uitwerking opdrachten
Log11 uitwerking opdrachten
 
Leetcode Problem Solution
Leetcode Problem SolutionLeetcode Problem Solution
Leetcode Problem Solution
 
Sap tables-list -SAP ABAP Training institute in Pune
Sap tables-list -SAP ABAP Training institute in PuneSap tables-list -SAP ABAP Training institute in Pune
Sap tables-list -SAP ABAP Training institute in Pune
 
Inventory Management Part II
Inventory Management Part IIInventory Management Part II
Inventory Management Part II
 
SAP Tables and entries.pdf
SAP Tables and entries.pdfSAP Tables and entries.pdf
SAP Tables and entries.pdf
 
Data Mapping - SCSALE COPYBOOK MAPPING PRELIM GUIDE
Data Mapping - SCSALE COPYBOOK MAPPING PRELIM GUIDEData Mapping - SCSALE COPYBOOK MAPPING PRELIM GUIDE
Data Mapping - SCSALE COPYBOOK MAPPING PRELIM GUIDE
 
1. What is operations management Why is it important Is a good k.docx
1. What is operations management Why is it important Is a good k.docx1. What is operations management Why is it important Is a good k.docx
1. What is operations management Why is it important Is a good k.docx
 
Scheduling by Primavera - Training
Scheduling by Primavera - TrainingScheduling by Primavera - Training
Scheduling by Primavera - Training
 
Unit 3 review_session
Unit 3 review_sessionUnit 3 review_session
Unit 3 review_session
 
Enterprise
EnterpriseEnterprise
Enterprise
 
Cost n profit analysis
Cost n profit analysisCost n profit analysis
Cost n profit analysis
 
Value stream mapping (future state)
Value stream mapping (future state)Value stream mapping (future state)
Value stream mapping (future state)
 
Value stream mapping (current state)
Value stream mapping (current state)Value stream mapping (current state)
Value stream mapping (current state)
 
LEAN
LEANLEAN
LEAN
 
Lean_Basics_Part_II_Rev4.ppt
Lean_Basics_Part_II_Rev4.pptLean_Basics_Part_II_Rev4.ppt
Lean_Basics_Part_II_Rev4.ppt
 

More from Babasab Patil

Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
Segmentation module 4  mba 1st sem by babasab patil (karrisatte)Segmentation module 4  mba 1st sem by babasab patil (karrisatte)
Segmentation module 4 mba 1st sem by babasab patil (karrisatte)Babasab Patil
 
Marketing management module 1 core concepts of marketing mba 1st sem by baba...
Marketing management module 1 core concepts of marketing  mba 1st sem by baba...Marketing management module 1 core concepts of marketing  mba 1st sem by baba...
Marketing management module 1 core concepts of marketing mba 1st sem by baba...Babasab Patil
 
Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Marketing management module 2 marketing environment mba 1st sem by babasab pa...Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Marketing management module 2 marketing environment mba 1st sem by babasab pa...Babasab Patil
 
Marketing management module 4 measuring andforecasting demand mba 1st sem by...
Marketing management module 4  measuring andforecasting demand mba 1st sem by...Marketing management module 4  measuring andforecasting demand mba 1st sem by...
Marketing management module 4 measuring andforecasting demand mba 1st sem by...Babasab Patil
 
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...Babasab Patil
 
Notes managerial communication 3 business correspondence and report writing ...
Notes managerial communication  3 business correspondence and report writing ...Notes managerial communication  3 business correspondence and report writing ...
Notes managerial communication 3 business correspondence and report writing ...Babasab Patil
 
Notes managerial communication mod 2 basic communication skills mba 1st sem ...
Notes managerial communication mod 2  basic communication skills mba 1st sem ...Notes managerial communication mod 2  basic communication skills mba 1st sem ...
Notes managerial communication mod 2 basic communication skills mba 1st sem ...Babasab Patil
 
Notes managerial communication mod 4 the job application process mba 1st sem ...
Notes managerial communication mod 4 the job application process mba 1st sem ...Notes managerial communication mod 4 the job application process mba 1st sem ...
Notes managerial communication mod 4 the job application process mba 1st sem ...Babasab Patil
 
Notes managerial communication mod 5 interviews mba 1st sem by babasab patil...
Notes managerial communication mod 5 interviews  mba 1st sem by babasab patil...Notes managerial communication mod 5 interviews  mba 1st sem by babasab patil...
Notes managerial communication mod 5 interviews mba 1st sem by babasab patil...Babasab Patil
 
Notes managerial communication part 1 mba 1st sem by babasab patil (karrisatte)
Notes managerial communication part 1  mba 1st sem by babasab patil (karrisatte)Notes managerial communication part 1  mba 1st sem by babasab patil (karrisatte)
Notes managerial communication part 1 mba 1st sem by babasab patil (karrisatte)Babasab Patil
 
Principles of marketing mba 1st sem by babasab patil (karrisatte)
Principles of marketing mba 1st sem by babasab patil (karrisatte)Principles of marketing mba 1st sem by babasab patil (karrisatte)
Principles of marketing mba 1st sem by babasab patil (karrisatte)Babasab Patil
 
Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
Segmentation module 4  mba 1st sem by babasab patil (karrisatte)Segmentation module 4  mba 1st sem by babasab patil (karrisatte)
Segmentation module 4 mba 1st sem by babasab patil (karrisatte)Babasab Patil
 
Marketing management module 1 important questions of marketing mba 1st sem...
Marketing management module 1  important questions of marketing   mba 1st sem...Marketing management module 1  important questions of marketing   mba 1st sem...
Marketing management module 1 important questions of marketing mba 1st sem...Babasab Patil
 
Discovery shuttle processing NASA before launching the rocket by babasab ...
Discovery shuttle processing  NASA   before  launching the rocket by babasab ...Discovery shuttle processing  NASA   before  launching the rocket by babasab ...
Discovery shuttle processing NASA before launching the rocket by babasab ...Babasab Patil
 
Corporate lessons from__iim__calcutta by babasab patil
Corporate lessons from__iim__calcutta by babasab patil Corporate lessons from__iim__calcutta by babasab patil
Corporate lessons from__iim__calcutta by babasab patil Babasab Patil
 
Communication problems between men and women by babasab patil
Communication problems between men and women by babasab patil Communication problems between men and women by babasab patil
Communication problems between men and women by babasab patil Babasab Patil
 
Brasil waterfall byy babasab patil
Brasil waterfall  byy babasab patil Brasil waterfall  byy babasab patil
Brasil waterfall byy babasab patil Babasab Patil
 
Best aviation photography_ever__bar_none by babasab patil
Best aviation photography_ever__bar_none by babasab patil Best aviation photography_ever__bar_none by babasab patil
Best aviation photography_ever__bar_none by babasab patil Babasab Patil
 
Attitude stone cutter
Attitude stone cutterAttitude stone cutter
Attitude stone cutterBabasab Patil
 
Attitude stone cutter
Attitude stone cutterAttitude stone cutter
Attitude stone cutterBabasab Patil
 

More from Babasab Patil (20)

Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
Segmentation module 4  mba 1st sem by babasab patil (karrisatte)Segmentation module 4  mba 1st sem by babasab patil (karrisatte)
Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
 
Marketing management module 1 core concepts of marketing mba 1st sem by baba...
Marketing management module 1 core concepts of marketing  mba 1st sem by baba...Marketing management module 1 core concepts of marketing  mba 1st sem by baba...
Marketing management module 1 core concepts of marketing mba 1st sem by baba...
 
Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Marketing management module 2 marketing environment mba 1st sem by babasab pa...Marketing management module 2 marketing environment mba 1st sem by babasab pa...
Marketing management module 2 marketing environment mba 1st sem by babasab pa...
 
Marketing management module 4 measuring andforecasting demand mba 1st sem by...
Marketing management module 4  measuring andforecasting demand mba 1st sem by...Marketing management module 4  measuring andforecasting demand mba 1st sem by...
Marketing management module 4 measuring andforecasting demand mba 1st sem by...
 
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
Measuring and forecasting demand module 4 mba 1st sem by babasab patil (karri...
 
Notes managerial communication 3 business correspondence and report writing ...
Notes managerial communication  3 business correspondence and report writing ...Notes managerial communication  3 business correspondence and report writing ...
Notes managerial communication 3 business correspondence and report writing ...
 
Notes managerial communication mod 2 basic communication skills mba 1st sem ...
Notes managerial communication mod 2  basic communication skills mba 1st sem ...Notes managerial communication mod 2  basic communication skills mba 1st sem ...
Notes managerial communication mod 2 basic communication skills mba 1st sem ...
 
Notes managerial communication mod 4 the job application process mba 1st sem ...
Notes managerial communication mod 4 the job application process mba 1st sem ...Notes managerial communication mod 4 the job application process mba 1st sem ...
Notes managerial communication mod 4 the job application process mba 1st sem ...
 
Notes managerial communication mod 5 interviews mba 1st sem by babasab patil...
Notes managerial communication mod 5 interviews  mba 1st sem by babasab patil...Notes managerial communication mod 5 interviews  mba 1st sem by babasab patil...
Notes managerial communication mod 5 interviews mba 1st sem by babasab patil...
 
Notes managerial communication part 1 mba 1st sem by babasab patil (karrisatte)
Notes managerial communication part 1  mba 1st sem by babasab patil (karrisatte)Notes managerial communication part 1  mba 1st sem by babasab patil (karrisatte)
Notes managerial communication part 1 mba 1st sem by babasab patil (karrisatte)
 
Principles of marketing mba 1st sem by babasab patil (karrisatte)
Principles of marketing mba 1st sem by babasab patil (karrisatte)Principles of marketing mba 1st sem by babasab patil (karrisatte)
Principles of marketing mba 1st sem by babasab patil (karrisatte)
 
Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
Segmentation module 4  mba 1st sem by babasab patil (karrisatte)Segmentation module 4  mba 1st sem by babasab patil (karrisatte)
Segmentation module 4 mba 1st sem by babasab patil (karrisatte)
 
Marketing management module 1 important questions of marketing mba 1st sem...
Marketing management module 1  important questions of marketing   mba 1st sem...Marketing management module 1  important questions of marketing   mba 1st sem...
Marketing management module 1 important questions of marketing mba 1st sem...
 
Discovery shuttle processing NASA before launching the rocket by babasab ...
Discovery shuttle processing  NASA   before  launching the rocket by babasab ...Discovery shuttle processing  NASA   before  launching the rocket by babasab ...
Discovery shuttle processing NASA before launching the rocket by babasab ...
 
Corporate lessons from__iim__calcutta by babasab patil
Corporate lessons from__iim__calcutta by babasab patil Corporate lessons from__iim__calcutta by babasab patil
Corporate lessons from__iim__calcutta by babasab patil
 
Communication problems between men and women by babasab patil
Communication problems between men and women by babasab patil Communication problems between men and women by babasab patil
Communication problems between men and women by babasab patil
 
Brasil waterfall byy babasab patil
Brasil waterfall  byy babasab patil Brasil waterfall  byy babasab patil
Brasil waterfall byy babasab patil
 
Best aviation photography_ever__bar_none by babasab patil
Best aviation photography_ever__bar_none by babasab patil Best aviation photography_ever__bar_none by babasab patil
Best aviation photography_ever__bar_none by babasab patil
 
Attitude stone cutter
Attitude stone cutterAttitude stone cutter
Attitude stone cutter
 
Attitude stone cutter
Attitude stone cutterAttitude stone cutter
Attitude stone cutter
 

Recently uploaded

Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 

Recently uploaded (20)

Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 

Resource planningppt @ DOMS

  • 2.
  • 3. Resource Planning for Manufacturing 15-
  • 4.
  • 5. Demand Characteristics 15- 1 2 3 4 5 Week 400 – 300 – 200 – 100 – No. of tables Continuous demand M T W Th F M T W Th F 400 – 300 – 200 – 100 – No. of tables Discrete demand Independent demand 100 tables Dependent demand 100 x 1 = 100 tabletops 100 x 4 = 400 table legs
  • 6. Material Requirements Planning 15- Material requirements planning Planned order releases Work orders Purchase orders Rescheduling notices Item master file Product structure file Master production schedule
  • 7.
  • 8.
  • 9. 15- Master Production Schedule PERIOD MPS ITEM 1 2 3 4 5 Pencil Case 125 125 125 125 125 Clipboard 85 95 120 100 100 Lapboard 75 120 47 20 17 Lapdesk 0 50 0 50 0
  • 11. Product Structure 15- Top clip (1) Bottom clip (1) Pivot (1) Spring (1) Rivets (2) Finished clipboard Pressboard (1) Clipboard
  • 12. Product Structure Tree 15- Clipboard Level 0 Level 1 Level 2 Spring (1) Bottom Clip (1) Top Clip (1) Pivot (1) Rivets (2) Clip Ass’y (1) Pressboard (1)
  • 13. Multilevel Indented BOM 15- 0 - - - - Clipboard ea 1 - 1 - - - Clip Assembly ea 1 - - 2 - - Top Clip ea 1 - - 2 - - Bottom Clip ea 1 - - 2 - - Pivot ea 1 - - 2 - - Spring ea 1 - 1 - - - Rivet ea 2 - 1 - - - Press Board ea 1 LEVEL ITEM UNIT OF MEASURE QUANTITY
  • 14.
  • 15.
  • 16. Modular BOMs 15- 4-Cylinder (.40) Bright red (.10) Leather (.20) Grey (.10) Sports coupe (.20) 6-Cylinder (.50) White linen (.10) Tweed (.40) Light blue (.10) Two-door (.20) 8-Cylinder (.10) Sulphur yellow (.10) Plush (.40) Rose (.10) Four-door (.30) Neon orange (.10) Off-white (.20) Station wagon (.30) Metallic blue (.10) Cool green (.10) Emerald green (.10) Black (.20) Jet black (.20) Brown (.10) Champagne (.20) B/W checked (.10) X10 Automobile Engines Exterior color Interior Interior color Body (1 of 3) (1 of 8) (1 of 3) (1 of 8) (1 of 4)
  • 17.
  • 18.
  • 19. Item Master File 15- DESCRIPTION INVENTORY POLICY Item Pressboard Lead time 1 Item no. 7341 Annual demand 5000 Item type Purch Holding cost 1 Product/sales class Comp Ordering/setup cost 50 Value class B Safety stock 0 Buyer/planner RSR Reorder point 39 Vendor/drawing 07142 EOQ 316 Phantom code N Minimum order qty 100 Unit price/cost 1.25 Maximum order qty 500 Pegging Y Multiple order qty 1 LLC 1 Policy code 3
  • 20. 15- Item Master File On hand 150 YTD usage/sales 1100 Location W142 MTD usage/sales 75 On order 100 YTD receipts 1200 Allocated 75 MTD receipts 0 Cycle 3 Last receipt 8/25 Last count 9/5 Last issue 10/5 Difference -2 Cost acct. 00754 Routing 00326 Engr 07142 PHYSICAL INVENTORY USAGE/SALES CODES
  • 21.
  • 23. MRP 15- Master Production Schedule 1 2 3 4 5 Clipboard 85 95 120 100 100 Lapdesk 0 60 0 60 0 Item Master File CLIPBOARD LAPDESK PRESSBOARD On hand 25 20 150 On order 175 (Period 1) 0 0 (sch receipt) LLC 0 0 1 Lot size L4L Mult 50 Min 100 Lead time 1 1 1
  • 24. MRP 15- Product Structure Record Clipboard Lapdesk Pressboard (2) Trim (3’) Beanbag (1) Glue (4 oz) Level 0 Level 0 Pressboard (1) Clip Ass’y (1) Rivets (2) Level 1 Level 1
  • 25. 15- MRP - 1 ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Gross Requirements 85 95 120 100 100 Scheduled Receipts 175 Projected on Hand 25 Net Requirements Planned Order Receipts Planned Order Releases
  • 26. 15- MRP - 2 ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Gross Requirements 85 95 120 100 100 Scheduled Receipts 175 Projected on Hand 25 115 Net Requirements 0 Planned Order Receipts Planned Order Releases (25 + 175) = 200 units available (200 - 85) = 115 on hand at the end of Period 1
  • 27. 15- MRP - 3 ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Gross Requirements 85 95 120 100 100 Scheduled Receipts 175 Projected on Hand 25 115 20 Net Requirements 0 0 Planned Order Receipts Planned Order Releases 115 units available (115 - 85) = 20 on hand at the end of Period 2
  • 28. 15- MRP - 4 ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Gross Requirements 85 95 120 100 100 Scheduled Receipts 175 Projected on Hand 25 115 20 0 Net Requirements 0 0 100 Planned Order Receipts 100 Planned Order Releases 100 20 units available (20 - 120) = -100 — 100 additional Clipboards are required Order must be placed in Period 2 to be received in Period 3
  • 29. 15- MRP - 5 ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Gross Requirements 85 95 120 100 100 Scheduled Receipts 175 Projected on Hand 25 115 20 0 0 0 Net Requirements 0 0 100 100 100 Planned Order Receipts 100 100 100 Planned Order Releases 100 100 100 Following the same logic Gross Requirements in Periods 4 and 5 develop Net Requirements, Planned Order Receipts, and Planned Order Releases
  • 30. 15- MRP - 6 ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: 1 1 2 3 4 5 Gross Requirements 0 60 0 60 0 Scheduled Receipts Projected on Hand 20 Net Requirements Planned Order Receipts Planned Order Releases
  • 31. 15- MRP - 7 ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: 1 1 2 3 4 5 Gross Requirements 0 60 0 60 0 Scheduled Receipts Projected on Hand 20 20 10 10 0 0 Net Requirements 0 40 50 Planned Order Receipts 50 50 Planned Order Releases 50 50 Following the same logic, the Lapdesk MRP matrix is completed as shown
  • 32. 15- MRP - 8 ITEM: PRESSBOARD LLC: 0 PERIOD LOT SIZE: MIN 100 LT: 1 1 2 3 4 5 Gross Requirements Scheduled Receipts Projected on Hand 150 Net Requirements Planned Order Receipts Planned Order Releases ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Planned Order Releases 100 100 100 ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: 1 1 2 3 4 5 Planned Order Releases 50 50
  • 33. 15- MRP – 9 ITEM: PRESSBOARD LLC: 0 PERIOD LOT SIZE: MIN 100 LT: 1 1 2 3 4 5 Gross Requirements 100 100 200 100 0 Scheduled Receipts Projected on Hand 150 Net Requirements Planned Order Receipts Planned Order Releases ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Planned Order Releases 100 100 100 ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: 1 1 2 3 4 5 Planned Order Releases 50 50 x1 x1 x1 x2 x2
  • 34. 15- MRP – 10 ITEM: PRESSBOARD LLC: 0 PERIOD LOT SIZE: MIN 100 LT: 1 1 2 3 4 5 Gross Requirements 100 100 200 100 0 Scheduled Receipts Projected on Hand 150 50 50 0 0 Net Requirements 50 150 100 Planned Order Receipts 100 150 100 Planned Order Releases 100 150 100 ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: 1 1 2 3 4 5 Planned Order Releases 100 100 100 ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: 1 1 2 3 4 5 Planned Order Releases 50 50 x1 x1 x1 x2 x2
  • 35. 15- MRP - 11 PERIOD ITEM 1 2 3 4 5 Clipboard 100 100 100 Lapdesk 50 50 Pressboard 100 150 100 Planned Order Report
  • 36.
  • 37. Advanced Lot Sizing Rules: L4L 15- Total cost of L4L = (4 X $60) + (0 X $1) = $240
  • 38. Advanced Lot Sizing Rules: EOQ 15- minimum order quantity Total cost of EOQ = (2 X $60) + [(10 + 50 + 40) X $1)] = $220
  • 39. Advanced Lot Sizing Rules: POQ 15- periods worth of requirements Total cost of POQ = (2 X $60) + [(20 + 40) X $1] = $180
  • 40. Planned Order Report 15- Item #2740 Date 9 - 25 - 05 On hand 100 Lead time 2 weeks On order 200 Lot size 200 Allocated 50 Safety stock 50 SCHEDULED PROJECTED DATE ORDER NO. GROSS REQS. RECEIPTS ON HAND ACTION 50 9-26 AL 4416 25 25 9-30 AL 4174 25 0 10-01 GR 6470 50 - 50 10-08 SR 7542 200 150 Expedite SR 10-01 10-10 CO 4471 75 75 10-15 GR 6471 50 25 10-23 GR 6471 25 0 10-27 GR 6473 50 - 50 Release PO 10-13 Key: AL = allocated WO = work order CO = customer order SR = scheduled receipt PO = purchase order GR = gross requirement
  • 41. MRP Action Report 15- ITEM DATE ORDER NO. QTY. ACTION #2740 10-08 7542 200 Expedite SR 10-01 #3616 10-09 Move forward PO 10-07 #2412 10-10 Move forward PO 10-05 #3427 10-15 Move backward PO 10-25 #2516 10-20 7648 100 De-expedite SR 10-30 #2740 10-27 200 Release PO 10-13 #3666 10-31 50 Release WO 10-24 Current date 9-25-08
  • 42.
  • 43. CRP 15- MRP planned order releases Routing file Capacity requirements planning Open orders file Load profile for each process
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52. 15- Initial Load Profile Hours of capacity 1 2 3 4 5 6 Time (weeks) Normal capacity 120 – 110 – 100 – 90 – 80 – 70 – 60 – 50 – 40 – 30 – 20 – 10 – 0 –
  • 53. 15- Adjusted Load Profile Hours of capacity 1 2 3 4 5 6 Time (weeks) Normal capacity 120 – 110 – 100 – 90 – 80 – 70 – 60 – 50 – 40 – 30 – 20 – 10 – 0 – Pull ahead Push back Push back Overtime Work an extra shift
  • 54.
  • 55.
  • 57.
  • 59.
  • 60.
  • 61.
  • 62.
  • 63. ERP and Software Systems 15-
  • 64.