A Review of Technological
Improvements in BRT and BHLS
Hidalgo D. and Muñoz J.C.
Forthcoming: Public Transport 2013
BRT
“flexible, rubber-tired
form of rapid transit
that combines stations,
vehicles, services,
running ways and
information
technologies into an
integrated system with
strong identity”
(Levinson et. al, 2003b)
Key BRT Components
Segregated
Busways
Stations with
prepayment and
level boarding
Large buses with
multiple doors
Distinctive Image
Centralized Control
Macrobús – Guadalajara
BHLS
“is an urban transport system
integrating a bus, but within
new conditions providing an
increase in performance
thanks to a triple optimization
of:
The internal characteristics of
the technical and commercial
offer.
The integration of this offer
into the whole public
transport network.
The integration of this
network into the urban area”
(Finn et. al, 2011)
Cambridge, UK
Key BHLS Components (for better performance)
The Busway – Nantes
Running
ways
Stations
Vehicles
Intelligent Transportation
Systems (ITS), operation
management tools
Identity of the
BHLS scheme
evolution of the # of cities and km per decade
Total length
Before 1990 (16 cities)
1991 - 2000 (19 cities)
2001 - 2010 (103 cities)507 km
1025 km
3707 km
BRT and busway systems in the world
Since 2011 (22 cities)
4119 km
source: BRTdata.org, August 2013
0
25
50
75
100
125
150
175
0
5
10
15
20
25
1970 1975 1980 1985 1990 1995 2000 2005 2010
CumulativeNumberofCities
NewCities
Evolution of the number of cities per year
BRT and busway systems in the world
2010: Guangzhou, Hefei, Yancheng, Zaozhuang – China;
Jaipur - India; Bangkok - Thailand; East London Transit –
UK; Barranquilla, Bucaramanga – Colombia;
Ecatepec- Mexico; Brampton – Canada; …
2000: Bogotá
(TransMilenio),
Colombia
1974/1991*: Curitiba
source: BRTdata.org, August 2013
1972/2010*: Lima
* Busway / BRT year commenced
Curitiba, RIT, 72 km median busways
1.2 million passengers per day
Initial Bus Corridor 1972
Full BRT in 1982
1. Making buses run like surface metro –
Curitiba 1982
median bus-ways longitudinally
segregated
tube stations with fare
prepayment and level access
physical and fare integration
dispatch control at terminal
stations.
differentiated services:
Expresso, Ligerao, Ligeirinho,
Interbairros, Alimentador
Special services downtown,
hospitals, touristic bus, schools
2010
Evolution of the Integrated Network
Source: Prefeitura de Curitiba, Parana
“Linha Verde” Curitiba
Corredor de 18 Km
2009
Fotos: Prefeitura de Curitiba, Parana
Expansión de Capacidad
“Corredor Boqueirao”
2010
Foto:PrefeituradeCuritiba,Parana
2. Implementing buses of high level of service,
The Trans Val de Marne TVM – Paris 1993
Implementing buses of high level of service,
The Trans Val de Marne TVM – Paris 1993
Is the most used BHLS
1993 (13 km) and 2007
(7 km)
20 km bus lanes, 95%
dedicated, mostly
central segregated
29 stations (@ 700m)
39 articulated buses,
specially designed and
branded for the system
Implementing buses of high level of service,
The Trans Val de Marne TVM – Paris 1993
Information systems
23 km/h
17 km/h minimum peak
3.5 min headway (peak)
Interval plus 3 minutes
for 96% of the pax
66,000 trips/day,
growing 7% per year
Good integration with
pedestrians and rail
(4 RER and 1 subway)
New vehicle Créalis for the BHLS routes
Quito, Metrobús-Q
Initial corridor 1995
Trolebus in Historic Disctrict
3. Expanding capacity with advanced operations
Bogotá, 2000
Very high capacity
48,000 pphpd
Bogotá, TransMilenio, 90 Km busways
1,8 milion pax/day
Theme 1 Technological improvements in BRT and BHLS
Bogotá TransMilenio
Eje Ambiental Avenida Jiménez
PhotoITDP
Express Way Lanes
TransMilenio, Bogota
4. Integrating transit services across
modes and services – Santiago 2007
Single process
(¿big bang?)
Fare integration
Route optimization
Formalization of
providers
Elimination of
“competition on the
street”
The planning and implementation team was too
optimistic - the reform resulted in serious difficulties
Despite the initial difficulties, Santiago has
risen to a higher level of performance
The current system is
better than the one it
replaced
Reductions in travel
times, emissions and
traffic incidents
Still a lot to improve
Traffic Fatalities in Santiago
Source: CONACET
6366
4951
3406 3291 3047 2937
0
1000
2000
3000
4000
5000
6000
7000
2005 2006 2007 2008 2009 2010
High commercial speed
42 km/h (now 35 km/h)
5. Introducing high speed buses on
expressways – Istanbul 2008
45 Km central bus ways on
expressway (100% segregated)
Long station platforms -90m,
separated 1.1 km on average
Non-grade queue jumpers to
access the Bosphorus Bridge,
(mixed traffic)
Low floor buses (articulated
and bi-articulated)
30,000 passengers/ hour/
direction, 15 sec interval
600,000 passengers/day
Expresso Tiradentes – Sao Paulo
Foto: SPTrans
35,800 pax/day/km
6. Reducing transfers with direct services –
Guangzhou 2010
22.5 km corridor
Long stations –from
55m to 260m, with
overtaking lanes
Combines multiple
direct services on the
same infrastructure.
27,000 pphpd
350 buses phpd
800,000 passengers per
day
Future of BRT
Running way guidance
Vehicle propulsion technologies
Information technologies
Fare collection
Planning and controlling operations
Running way guidance
Essen since 1980,
Leeds, Cambridge
since august 2011
Rouen, France (2001),
Castellón de la Plana,
Spain (2008), Nimes,
France (2010) and Bologna,
Italy (2010).Tested in Las
Vegas, Nevada
Mechanical Optical Magnetic
Eindhoven (2004)
O-Bahn, Adelaide, Australia
Opened in 1986
12 Km, guided, $98 MM Aus (including buses), up to 18,000 pax/hour
Km
(Pax/Day)
Type of
Guidance
Capital Cost
(M€)
Cost/Km
(M€)
Teor – Rouen,
France
30
(49,000)
Optical Infra 165
Buses 28
Total 193
Infra 5.5
Buses 0.9
Total 6.4
Spurbus
Essen,
Germany
16 [4]
(17,000)
Kerb Guided Infra N.A.
Buses 0.35/
unit
N.A.
TVRCAS
Castellon,
Spain
2
(3,200)
Optical
(trolleybus)
Infras 22
Buses 8
Total 30
Infra 11.0
Buses 3.8
Total 13.8
Cambridge,
UK
25
(20,000)
Kerb Guided Infra 85
Buses N.A.
Infra 3.4
Source: Finn et al, 2011
Running way guidance costs
Vehicle propulsion technologies
Diesel - reduction of the fuel´s sulfur content,
engine improvements and filters and catalysts
Compressed natural gas CNG
Liquefied natural gas LNG
Electric (trolleybuses), since 1911, in 315 cities
Hybrid-electric drives
Battery Electric
Hydraulic Hybrids
Hydrogen powered buses
Propulsion Standard Articulated Double-
articulated
Diesel 200 300 600
CNG 250 350 650
Hybrid 300 500 850
Trolley 400 650 1,000
Fuel Cell* > 1,000 - -
Examples of Costs of Different Vehicle Technologies in
Europe (Thousand €)
Source: Finn et. al (2011) * Not yet in commercial operation
Standard Articulated
Double-
Articulated
Diesel 12 m 18 m 25 m
High Floor with
stairs
90-150 NA NA
High Floor
without stairs
130-160 330-365 490-500
Low entry 150-180 NA NA
Low floor 280-310 430-460 630-650
CNG + 20-30%
Hybrid +40-60%
Air Conditioned +15 +35
Reference costs for Euro 5 Vehicles in Mexico (Thousand USD)
Source: Suarez, 2011
Meta-analysis of Exhaust Emissions
http://www.embarq.org/en/pro
ject/sustainable-urban-
transport-fuels-and-vehicles-
program
Authors:
Erin Cooper, Aileen Carrigan
EMBARQ
Magdala Arioli, EMBARQ Brasil
Umang Jain, EMBARQ India
Contributions: Hilda Martínez,
Jorge Macias, Cynthia
Menendez, Georg Schmid,
CTS-EMBARQ Mexico
Funding:
Fuels and Technologies
Fuels Exhaust After Treatment Technologies
Diesel (and Hybrids) OC – Oxidation Catalyst
DPF – Diesel Particulate Filter
SCR – Selective Catalytic Reduction
EGR – Exhaust Gas Recirculation
Biodiesel (20 and 100%) SCR – Selective Catalytic Reduction
EGR – Exhaust Gas Recirculation
Compressed Natural Gas (CNG) OC – Oxidation Catalyst
TWC – Three-way Catalyst
Liquified Natural Gas (LNG)
Ethanol
Emissions vary with respect to fuels, technologies
also significantly between the same fuel type and technology
CO results graph
Older technology
THC results graph
Older CNG tech (mostly due to methane)
NOx results graph
CNG with 3WC
Biodiesel
ULSD with SCR
PM results graph
Diesel without
emission control
technologies
CO2e results graph
ULSD, EGR, DPF, Hybrid
CNG, B20
w/o emission
control
technologies
CO THC NOx PM CO2
LNG High Very High Medium Very Low
E95 Very High Very High Very High Very High
E93 Very High Very High Medium Very High
D50+DPF Low Very Low High Medium High
D50 Medium Very Low High Very High Medium
D15+SCR High Very Low Medium Medium Low
D15+OC Very Low Very Low Medium Medium Medium
D15+Hybrid Very Low Very Low Variable Low Variable
D15+EGR Very Low Very Low Medium Medium Very High
D15+DPF Very Low Very Low High Low Very High
D15 Low Very Low High Very High Very High
D≥150+OC Low Low High Very High Low
D≥150 Medium Low Very High Very High Medium
CNG+OC Very Low Very High High Very Low Medium
CNG+3WC Very Low Low Very Low Very Low Medium
CNG Very High Very High Very High Very Low High
B20 Low Low High Medium High
B100+SCR Medium Very Low Low Low Very Low
B100+EGR Very Low Very Low Medium Medium Low
ITS – Fare Collection
Advanced contactless smart cards are
the most common media; flexible,
secure, convenient
Technologies:
MIFARE, introduced in 1994, market
share of more than 70%
Octopus, in Honk Kong since 1997:
applications in the Netherlands,
Dubai and New Zealand
Cubic, in 40 markets around the
world
Visa/Mastercard
New: NFC and EMV; for use with cellular
phones; under development in 80
countries
Advanced route design –
heuristics
Bus and crew scheduling
Advanced bus and crew
scheduling
Advanced operational
control AVL/CAD
Control: holding, early
doors closing, TSP
Traffic Signal Priority TSP
ITS – Planning and Operations
Avoiding Bus Bunching through Real Time
Control Strategies
Delgado, Muñoz, Giesen
No
Control Proposed
Wfirst 7636.32 1438.62
Std. Dev. 649.36 146.56
% reduction -81.16
Wextra 6218.71 1010.52
Std. Dev. 2265.24 82.04
% reduction -83.75
Win-veh 175.32 1561.34
Std. Dev. 31.69 77.3
% reduction 790.55
W t_light 4052.81 2965.1
Std. Dev. 88.27 110.27
% reduction -26.84
Total 18083.16 6975.58
Std. Dev. 2600.63 275.12
% reduction -61.42
Results: High frequency scenario
Transit Users
5. Results: Bus Loads
(Capacity reached & high frequency)
5. Results: Cycle Time
(Capacity reached & high frequency)
27-09-2013 52
Results: Waiting time Distribution Scenario 1
(Capacity reached & high frequency)
% of passengers that have to wait between:
Period 15-25 Period 25-120
0-2 min 2-4 min > 4 min 0-2 min 2-4 min > 4 min
No Control 57.76 29.60 12.64 63.46 27.68 8.86
Threshold 78.15 20.64 1.21 82.52 16.46 1.02
H 79.24 20.29 0.47 87.30 12.62 0.08
HBL 78.47 21.33 0.20 89.40 10.59 0.01
http://www.embarq.org/en/node/4923
Theme 1 Technological improvements in BRT and BHLS
¡Muchas Gracias!
Volvo Research and Educational
Foundations

Mais conteúdo relacionado

Mais procurados

RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory ThompsonRV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory ThompsonRail~Volution
 
On joint rail and property development - opportunities + potential pitfalls
On joint rail and property development - opportunities + potential pitfallsOn joint rail and property development - opportunities + potential pitfalls
On joint rail and property development - opportunities + potential pitfallsInstitute for Transport Studies (ITS)
 
High Speed Rail
High Speed RailHigh Speed Rail
High Speed Railsmehro
 
02 - Ultra Global PRT Past Present Future Low Carbon Business Breakfast - En...
02 - Ultra Global PRT Past Present Future  Low Carbon Business Breakfast - En...02 - Ultra Global PRT Past Present Future  Low Carbon Business Breakfast - En...
02 - Ultra Global PRT Past Present Future Low Carbon Business Breakfast - En...The Future Economy Network
 
Estimating residential public transport trip generation rates
Estimating residential public transport trip generation ratesEstimating residential public transport trip generation rates
Estimating residential public transport trip generation ratesJumpingJaq
 
Public Transport Reform in Seoul
Public Transport Reformin SeoulPublic Transport Reformin Seoul
Public Transport Reform in Seoulurbanbairam
 
Uirr news q3 2012-final
Uirr news q3 2012-finalUirr news q3 2012-final
Uirr news q3 2012-finalCombinant nv
 
Personal Rapid Transit System
Personal Rapid Transit SystemPersonal Rapid Transit System
Personal Rapid Transit SystemHimanshu Singh
 
VPATS Stage 2: Scenarios
VPATS Stage 2: ScenariosVPATS Stage 2: Scenarios
VPATS Stage 2: ScenariosRico Masters
 
Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Shyam Raman
 
Tailored Public Transportation: a strong digital upgrade powered by iBeacons
Tailored Public Transportation: a strong digital upgrade powered by iBeaconsTailored Public Transportation: a strong digital upgrade powered by iBeacons
Tailored Public Transportation: a strong digital upgrade powered by iBeaconsOnyx Beacon
 
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...Strategic Analysis of Growth Opportunities in the Western European Urban Rail...
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...Shyam Raman
 
Integrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreIntegrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreTehsin Kazi
 

Mais procurados (15)

RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory ThompsonRV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
 
On joint rail and property development - opportunities + potential pitfalls
On joint rail and property development - opportunities + potential pitfallsOn joint rail and property development - opportunities + potential pitfalls
On joint rail and property development - opportunities + potential pitfalls
 
High Speed Rail
High Speed RailHigh Speed Rail
High Speed Rail
 
Crossrail 2 - Planning for the Future
Crossrail 2 - Planning for the FutureCrossrail 2 - Planning for the Future
Crossrail 2 - Planning for the Future
 
02 - Ultra Global PRT Past Present Future Low Carbon Business Breakfast - En...
02 - Ultra Global PRT Past Present Future  Low Carbon Business Breakfast - En...02 - Ultra Global PRT Past Present Future  Low Carbon Business Breakfast - En...
02 - Ultra Global PRT Past Present Future Low Carbon Business Breakfast - En...
 
Drt2 mu 18112019
Drt2 mu 18112019Drt2 mu 18112019
Drt2 mu 18112019
 
Estimating residential public transport trip generation rates
Estimating residential public transport trip generation ratesEstimating residential public transport trip generation rates
Estimating residential public transport trip generation rates
 
Public Transport Reform in Seoul
Public Transport Reformin SeoulPublic Transport Reformin Seoul
Public Transport Reform in Seoul
 
Uirr news q3 2012-final
Uirr news q3 2012-finalUirr news q3 2012-final
Uirr news q3 2012-final
 
Personal Rapid Transit System
Personal Rapid Transit SystemPersonal Rapid Transit System
Personal Rapid Transit System
 
VPATS Stage 2: Scenarios
VPATS Stage 2: ScenariosVPATS Stage 2: Scenarios
VPATS Stage 2: Scenarios
 
Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...
 
Tailored Public Transportation: a strong digital upgrade powered by iBeacons
Tailored Public Transportation: a strong digital upgrade powered by iBeaconsTailored Public Transportation: a strong digital upgrade powered by iBeacons
Tailored Public Transportation: a strong digital upgrade powered by iBeacons
 
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...Strategic Analysis of Growth Opportunities in the Western European Urban Rail...
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...
 
Integrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreIntegrated Public Transport System - Bangalore
Integrated Public Transport System - Bangalore
 

Destaque

Proceso basicos del pensamiento
Proceso basicos  del pensamientoProceso basicos  del pensamiento
Proceso basicos del pensamientoSasha Vera
 
Mi Region y yo ppt
Mi Region y yo pptMi Region y yo ppt
Mi Region y yo pptITSA
 
TRTO A320 Type Rating+MCC-ELT CERTIFICATES
TRTO A320 Type Rating+MCC-ELT CERTIFICATESTRTO A320 Type Rating+MCC-ELT CERTIFICATES
TRTO A320 Type Rating+MCC-ELT CERTIFICATESesrealg
 
Smart targets
Smart targetsSmart targets
Smart targetsLiyahh
 
Theme 3 The costumer experience
Theme 3 The costumer experienceTheme 3 The costumer experience
Theme 3 The costumer experienceBRTCoE
 
Кашкарова С.В. Подарок маме – своими руками (проект). — Приложение 5
Кашкарова С.В. Подарок маме – своими руками (проект). — Приложение 5Кашкарова С.В. Подарок маме – своими руками (проект). — Приложение 5
Кашкарова С.В. Подарок маме – своими руками (проект). — Приложение 5vdohnovlennye
 
3.5 write and graph equations of lines
3.5 write and graph equations of lines3.5 write and graph equations of lines
3.5 write and graph equations of linesmasljr
 
DIMAS PRAKOSO
DIMAS PRAKOSODIMAS PRAKOSO
DIMAS PRAKOSOfikri990
 
El futuro de la computadora
El futuro de la computadoraEl futuro de la computadora
El futuro de la computadoraGTRGP
 
estándares y gestión
estándares y gestiónestándares y gestión
estándares y gestiónAlVeDa37
 
Carta dirección general de seguros
Carta dirección general de segurosCarta dirección general de seguros
Carta dirección general de segurosfaralami
 
LAS FIESTAS PATRONALES DE GUATEMALA
LAS FIESTAS PATRONALES DE GUATEMALALAS FIESTAS PATRONALES DE GUATEMALA
LAS FIESTAS PATRONALES DE GUATEMALAnegro1111
 
SELADA AIR (Nasturtium officinale)
SELADA AIR (Nasturtium officinale)SELADA AIR (Nasturtium officinale)
SELADA AIR (Nasturtium officinale)Aji Sanjaya
 
Theme 2 Automated data collection - a new foundation for analysis and management
Theme 2 Automated data collection - a new foundation for analysis and managementTheme 2 Automated data collection - a new foundation for analysis and management
Theme 2 Automated data collection - a new foundation for analysis and managementBRTCoE
 
Lo normal y lo desviado en los consumidores de drogas. fes 1. david pere
Lo normal y lo desviado en los consumidores de drogas. fes 1. david pereLo normal y lo desviado en los consumidores de drogas. fes 1. david pere
Lo normal y lo desviado en los consumidores de drogas. fes 1. david pereUniversitat Autònoma de Barcelona.
 

Destaque (20)

Proceso basicos del pensamiento
Proceso basicos  del pensamientoProceso basicos  del pensamiento
Proceso basicos del pensamiento
 
Mi Region y yo ppt
Mi Region y yo pptMi Region y yo ppt
Mi Region y yo ppt
 
TRTO A320 Type Rating+MCC-ELT CERTIFICATES
TRTO A320 Type Rating+MCC-ELT CERTIFICATESTRTO A320 Type Rating+MCC-ELT CERTIFICATES
TRTO A320 Type Rating+MCC-ELT CERTIFICATES
 
Smart targets
Smart targetsSmart targets
Smart targets
 
Theme 3 The costumer experience
Theme 3 The costumer experienceTheme 3 The costumer experience
Theme 3 The costumer experience
 
Кашкарова С.В. Подарок маме – своими руками (проект). — Приложение 5
Кашкарова С.В. Подарок маме – своими руками (проект). — Приложение 5Кашкарова С.В. Подарок маме – своими руками (проект). — Приложение 5
Кашкарова С.В. Подарок маме – своими руками (проект). — Приложение 5
 
3.5 write and graph equations of lines
3.5 write and graph equations of lines3.5 write and graph equations of lines
3.5 write and graph equations of lines
 
DIMAS PRAKOSO
DIMAS PRAKOSODIMAS PRAKOSO
DIMAS PRAKOSO
 
El futuro de la computadora
El futuro de la computadoraEl futuro de la computadora
El futuro de la computadora
 
Demostracion matematica
Demostracion matematica Demostracion matematica
Demostracion matematica
 
October 2
October 2October 2
October 2
 
estándares y gestión
estándares y gestiónestándares y gestión
estándares y gestión
 
Carta dirección general de seguros
Carta dirección general de segurosCarta dirección general de seguros
Carta dirección general de seguros
 
Ruben Dario
Ruben DarioRuben Dario
Ruben Dario
 
Le marche pres gen_2013
Le marche pres gen_2013Le marche pres gen_2013
Le marche pres gen_2013
 
Motivation
MotivationMotivation
Motivation
 
LAS FIESTAS PATRONALES DE GUATEMALA
LAS FIESTAS PATRONALES DE GUATEMALALAS FIESTAS PATRONALES DE GUATEMALA
LAS FIESTAS PATRONALES DE GUATEMALA
 
SELADA AIR (Nasturtium officinale)
SELADA AIR (Nasturtium officinale)SELADA AIR (Nasturtium officinale)
SELADA AIR (Nasturtium officinale)
 
Theme 2 Automated data collection - a new foundation for analysis and management
Theme 2 Automated data collection - a new foundation for analysis and managementTheme 2 Automated data collection - a new foundation for analysis and management
Theme 2 Automated data collection - a new foundation for analysis and management
 
Lo normal y lo desviado en los consumidores de drogas. fes 1. david pere
Lo normal y lo desviado en los consumidores de drogas. fes 1. david pereLo normal y lo desviado en los consumidores de drogas. fes 1. david pere
Lo normal y lo desviado en los consumidores de drogas. fes 1. david pere
 

Semelhante a Theme 1 Technological improvements in BRT and BHLS

MyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie HattonMyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie Hattonguylundy
 
sustainable transport
sustainable transportsustainable transport
sustainable transportkarapeshivraj
 
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...SMART Infrastructure Facility
 
Public transport improvement
Public transport improvement Public transport improvement
Public transport improvement ICLEI
 
Design school2 sds
Design school2 sdsDesign school2 sds
Design school2 sdsFabMob
 
World traffic management
World traffic managementWorld traffic management
World traffic managementAchu Zachariah
 
City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...
City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...
City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...DesigningHongKong
 
Integrated Rapid Transport System - Mike Marsden
Integrated Rapid Transport System - Mike MarsdenIntegrated Rapid Transport System - Mike Marsden
Integrated Rapid Transport System - Mike MarsdenCape Town Partnership
 
BDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport Project
BDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport ProjectBDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport Project
BDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport ProjectBigData_Europe
 
Managing Viennas Tram and Metro Network
Managing Viennas Tram and Metro NetworkManaging Viennas Tram and Metro Network
Managing Viennas Tram and Metro NetworkMarkus Ossberger
 
Саммит ТПП С-6 в Берлине: Презентация ТПП Парижа
Саммит ТПП С-6 в Берлине: Презентация ТПП ПарижаСаммит ТПП С-6 в Берлине: Презентация ТПП Парижа
Саммит ТПП С-6 в Берлине: Презентация ТПП ПарижаMoscowCCI
 
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITYPROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY664601
 
Guia optica Veolia
Guia optica VeoliaGuia optica Veolia
Guia optica Veoliametro bogota
 
Transantiago
TransantiagoTransantiago
TransantiagoBRTCoE
 

Semelhante a Theme 1 Technological improvements in BRT and BHLS (20)

BRT Workshop - BRT and BHLS Evolution Worldwide
BRT Workshop - BRT and BHLS Evolution WorldwideBRT Workshop - BRT and BHLS Evolution Worldwide
BRT Workshop - BRT and BHLS Evolution Worldwide
 
MyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie HattonMyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie Hatton
 
sustainable transport
sustainable transportsustainable transport
sustainable transport
 
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
 
Public transport improvement
Public transport improvement Public transport improvement
Public transport improvement
 
2011 City of Buenos Aires Achievements: Sustainable Mobility Plan
2011 City of Buenos Aires Achievements: Sustainable Mobility Plan2011 City of Buenos Aires Achievements: Sustainable Mobility Plan
2011 City of Buenos Aires Achievements: Sustainable Mobility Plan
 
Design school2 sds
Design school2 sdsDesign school2 sds
Design school2 sds
 
World traffic management
World traffic managementWorld traffic management
World traffic management
 
City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...
City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...
City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...
 
Innovation in gcc-railway
Innovation in gcc-railwayInnovation in gcc-railway
Innovation in gcc-railway
 
Integrated Rapid Transport System - Mike Marsden
Integrated Rapid Transport System - Mike MarsdenIntegrated Rapid Transport System - Mike Marsden
Integrated Rapid Transport System - Mike Marsden
 
Tackling future urban mobility demand in singapore
Tackling future urban mobility demand in singaporeTackling future urban mobility demand in singapore
Tackling future urban mobility demand in singapore
 
BDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport Project
BDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport ProjectBDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport Project
BDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport Project
 
Intelligent infrastructure and traffic systems
Intelligent infrastructure and traffic systemsIntelligent infrastructure and traffic systems
Intelligent infrastructure and traffic systems
 
Managing Viennas Tram and Metro Network
Managing Viennas Tram and Metro NetworkManaging Viennas Tram and Metro Network
Managing Viennas Tram and Metro Network
 
Саммит ТПП С-6 в Берлине: Презентация ТПП Парижа
Саммит ТПП С-6 в Берлине: Презентация ТПП ПарижаСаммит ТПП С-6 в Берлине: Презентация ТПП Парижа
Саммит ТПП С-6 в Берлине: Презентация ТПП Парижа
 
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITYPROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
 
Guia optica Veolia
Guia optica VeoliaGuia optica Veolia
Guia optica Veolia
 
Transantiago
TransantiagoTransantiago
Transantiago
 
Modern Roads
Modern RoadsModern Roads
Modern Roads
 

Mais de BRTCoE

BRT+ Workshop
BRT+ WorkshopBRT+ Workshop
BRT+ WorkshopBRTCoE
 
MaaS Trial in Sydney
MaaS Trial in SydneyMaaS Trial in Sydney
MaaS Trial in SydneyBRTCoE
 
Full cost reliability by Juan Carlos Muñoz
Full cost reliability by Juan Carlos MuñozFull cost reliability by Juan Carlos Muñoz
Full cost reliability by Juan Carlos MuñozBRTCoE
 
Congreso nacional chileno 2019 DITL
Congreso nacional chileno 2019 DITLCongreso nacional chileno 2019 DITL
Congreso nacional chileno 2019 DITLBRTCoE
 
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...BRTCoE
 
Heather Allen - Why do we need to consider how women move in urban transport ...
Heather Allen - Why do we need to consider how women move in urban transport ...Heather Allen - Why do we need to consider how women move in urban transport ...
Heather Allen - Why do we need to consider how women move in urban transport ...BRTCoE
 
Workshop Innovation in Africa - Manifesto for BRT Lite
Workshop Innovation in Africa - Manifesto for BRT LiteWorkshop Innovation in Africa - Manifesto for BRT Lite
Workshop Innovation in Africa - Manifesto for BRT LiteBRTCoE
 
Workshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo Mobereola
Workshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo MobereolaWorkshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo Mobereola
Workshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo MobereolaBRTCoE
 
Workshop Innovation in Africa - Context, challenges & opportunities for urban...
Workshop Innovation in Africa - Context, challenges & opportunities for urban...Workshop Innovation in Africa - Context, challenges & opportunities for urban...
Workshop Innovation in Africa - Context, challenges & opportunities for urban...BRTCoE
 
Workshop Innovation in Africa - Mobilize
Workshop Innovation in Africa - MobilizeWorkshop Innovation in Africa - Mobilize
Workshop Innovation in Africa - MobilizeBRTCoE
 
Workshop Innovation in Africa - Day one of operations by Cristina Albuquerque
Workshop Innovation in Africa - Day one of operations by Cristina AlbuquerqueWorkshop Innovation in Africa - Day one of operations by Cristina Albuquerque
Workshop Innovation in Africa - Day one of operations by Cristina AlbuquerqueBRTCoE
 
Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...
Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...
Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...BRTCoE
 
Workshop Innovation in Africa - BRT in South Africa by Christo Venter
Workshop Innovation in Africa - BRT in South Africa by Christo VenterWorkshop Innovation in Africa - BRT in South Africa by Christo Venter
Workshop Innovation in Africa - BRT in South Africa by Christo VenterBRTCoE
 
Workshop Innovation in Africa - BRT+ Centre of Excellence Presentation
Workshop Innovation in Africa - BRT+ Centre of Excellence PresentationWorkshop Innovation in Africa - BRT+ Centre of Excellence Presentation
Workshop Innovation in Africa - BRT+ Centre of Excellence PresentationBRTCoE
 
Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...
Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...
Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...BRTCoE
 
Cristian Navas - Testing collaborative accessibility-based engagement tools: ...
Cristian Navas - Testing collaborative accessibility-based engagement tools: ...Cristian Navas - Testing collaborative accessibility-based engagement tools: ...
Cristian Navas - Testing collaborative accessibility-based engagement tools: ...BRTCoE
 
Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...
Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...
Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...BRTCoE
 
BRT Station Design in the Urban Context
BRT Station Design in the Urban ContextBRT Station Design in the Urban Context
BRT Station Design in the Urban ContextBRTCoE
 
Zhao emotional travel 20160920 p
Zhao emotional travel 20160920 pZhao emotional travel 20160920 p
Zhao emotional travel 20160920 pBRTCoE
 
Urban Road Congestion Management - Capacity Investments and Pricing Policies
Urban Road Congestion Management - Capacity Investments and Pricing PoliciesUrban Road Congestion Management - Capacity Investments and Pricing Policies
Urban Road Congestion Management - Capacity Investments and Pricing PoliciesBRTCoE
 

Mais de BRTCoE (20)

BRT+ Workshop
BRT+ WorkshopBRT+ Workshop
BRT+ Workshop
 
MaaS Trial in Sydney
MaaS Trial in SydneyMaaS Trial in Sydney
MaaS Trial in Sydney
 
Full cost reliability by Juan Carlos Muñoz
Full cost reliability by Juan Carlos MuñozFull cost reliability by Juan Carlos Muñoz
Full cost reliability by Juan Carlos Muñoz
 
Congreso nacional chileno 2019 DITL
Congreso nacional chileno 2019 DITLCongreso nacional chileno 2019 DITL
Congreso nacional chileno 2019 DITL
 
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
 
Heather Allen - Why do we need to consider how women move in urban transport ...
Heather Allen - Why do we need to consider how women move in urban transport ...Heather Allen - Why do we need to consider how women move in urban transport ...
Heather Allen - Why do we need to consider how women move in urban transport ...
 
Workshop Innovation in Africa - Manifesto for BRT Lite
Workshop Innovation in Africa - Manifesto for BRT LiteWorkshop Innovation in Africa - Manifesto for BRT Lite
Workshop Innovation in Africa - Manifesto for BRT Lite
 
Workshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo Mobereola
Workshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo MobereolaWorkshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo Mobereola
Workshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo Mobereola
 
Workshop Innovation in Africa - Context, challenges & opportunities for urban...
Workshop Innovation in Africa - Context, challenges & opportunities for urban...Workshop Innovation in Africa - Context, challenges & opportunities for urban...
Workshop Innovation in Africa - Context, challenges & opportunities for urban...
 
Workshop Innovation in Africa - Mobilize
Workshop Innovation in Africa - MobilizeWorkshop Innovation in Africa - Mobilize
Workshop Innovation in Africa - Mobilize
 
Workshop Innovation in Africa - Day one of operations by Cristina Albuquerque
Workshop Innovation in Africa - Day one of operations by Cristina AlbuquerqueWorkshop Innovation in Africa - Day one of operations by Cristina Albuquerque
Workshop Innovation in Africa - Day one of operations by Cristina Albuquerque
 
Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...
Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...
Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...
 
Workshop Innovation in Africa - BRT in South Africa by Christo Venter
Workshop Innovation in Africa - BRT in South Africa by Christo VenterWorkshop Innovation in Africa - BRT in South Africa by Christo Venter
Workshop Innovation in Africa - BRT in South Africa by Christo Venter
 
Workshop Innovation in Africa - BRT+ Centre of Excellence Presentation
Workshop Innovation in Africa - BRT+ Centre of Excellence PresentationWorkshop Innovation in Africa - BRT+ Centre of Excellence Presentation
Workshop Innovation in Africa - BRT+ Centre of Excellence Presentation
 
Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...
Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...
Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...
 
Cristian Navas - Testing collaborative accessibility-based engagement tools: ...
Cristian Navas - Testing collaborative accessibility-based engagement tools: ...Cristian Navas - Testing collaborative accessibility-based engagement tools: ...
Cristian Navas - Testing collaborative accessibility-based engagement tools: ...
 
Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...
Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...
Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...
 
BRT Station Design in the Urban Context
BRT Station Design in the Urban ContextBRT Station Design in the Urban Context
BRT Station Design in the Urban Context
 
Zhao emotional travel 20160920 p
Zhao emotional travel 20160920 pZhao emotional travel 20160920 p
Zhao emotional travel 20160920 p
 
Urban Road Congestion Management - Capacity Investments and Pricing Policies
Urban Road Congestion Management - Capacity Investments and Pricing PoliciesUrban Road Congestion Management - Capacity Investments and Pricing Policies
Urban Road Congestion Management - Capacity Investments and Pricing Policies
 

Último

Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...IMARC Group
 
NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023Steve Rader
 
PDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfPDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfHajeJanKamps
 
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfTalent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfCharles Cotter, PhD
 
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 Building Your Personal Brand on LinkedIn - Expert Planet-  2024 Building Your Personal Brand on LinkedIn - Expert Planet-  2024
Building Your Personal Brand on LinkedIn - Expert Planet- 2024Stephan Koning
 
Plano de marketing- inglês em formato ppt
Plano de marketing- inglês  em formato pptPlano de marketing- inglês  em formato ppt
Plano de marketing- inglês em formato pptElizangelaSoaresdaCo
 
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access
 
Fabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsFabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsWristbands Ireland
 
MoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor PresentationMoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor Presentationbaron83
 
Tata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerakTata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerakEditores1
 
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)tazeenaila12
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...AustraliaChapterIIBA
 
Intellectual Property Licensing Examples
Intellectual Property Licensing ExamplesIntellectual Property Licensing Examples
Intellectual Property Licensing Examplesamberjiles31
 
Michael Vidyakin: Introduction to PMO (UA)
Michael Vidyakin: Introduction to PMO (UA)Michael Vidyakin: Introduction to PMO (UA)
Michael Vidyakin: Introduction to PMO (UA)Lviv Startup Club
 
Anyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agencyAnyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agencyHanna Klim
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxWorkforce Group
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfJohnCarloValencia4
 
Entrepreneurship & organisations: influences and organizations
Entrepreneurship & organisations: influences and organizationsEntrepreneurship & organisations: influences and organizations
Entrepreneurship & organisations: influences and organizationsP&CO
 

Último (20)

Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
 
NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023
 
PDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfPDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdf
 
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfTalent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
 
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 Building Your Personal Brand on LinkedIn - Expert Planet-  2024 Building Your Personal Brand on LinkedIn - Expert Planet-  2024
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 
Plano de marketing- inglês em formato ppt
Plano de marketing- inglês  em formato pptPlano de marketing- inglês  em formato ppt
Plano de marketing- inglês em formato ppt
 
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024
 
Investment Opportunity for Thailand's Automotive & EV Industries
Investment Opportunity for Thailand's Automotive & EV IndustriesInvestment Opportunity for Thailand's Automotive & EV Industries
Investment Opportunity for Thailand's Automotive & EV Industries
 
Fabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsFabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and Festivals
 
MoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor PresentationMoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor Presentation
 
Tata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerakTata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerak
 
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
 
Intellectual Property Licensing Examples
Intellectual Property Licensing ExamplesIntellectual Property Licensing Examples
Intellectual Property Licensing Examples
 
Michael Vidyakin: Introduction to PMO (UA)
Michael Vidyakin: Introduction to PMO (UA)Michael Vidyakin: Introduction to PMO (UA)
Michael Vidyakin: Introduction to PMO (UA)
 
Anyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agencyAnyhr.io | Presentation HR&Recruiting agency
Anyhr.io | Presentation HR&Recruiting agency
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
 
Entrepreneurship & organisations: influences and organizations
Entrepreneurship & organisations: influences and organizationsEntrepreneurship & organisations: influences and organizations
Entrepreneurship & organisations: influences and organizations
 

Theme 1 Technological improvements in BRT and BHLS

  • 1. A Review of Technological Improvements in BRT and BHLS Hidalgo D. and Muñoz J.C. Forthcoming: Public Transport 2013
  • 2. BRT “flexible, rubber-tired form of rapid transit that combines stations, vehicles, services, running ways and information technologies into an integrated system with strong identity” (Levinson et. al, 2003b)
  • 3. Key BRT Components Segregated Busways Stations with prepayment and level boarding Large buses with multiple doors Distinctive Image Centralized Control Macrobús – Guadalajara
  • 4. BHLS “is an urban transport system integrating a bus, but within new conditions providing an increase in performance thanks to a triple optimization of: The internal characteristics of the technical and commercial offer. The integration of this offer into the whole public transport network. The integration of this network into the urban area” (Finn et. al, 2011) Cambridge, UK
  • 5. Key BHLS Components (for better performance) The Busway – Nantes Running ways Stations Vehicles Intelligent Transportation Systems (ITS), operation management tools Identity of the BHLS scheme
  • 6. evolution of the # of cities and km per decade Total length Before 1990 (16 cities) 1991 - 2000 (19 cities) 2001 - 2010 (103 cities)507 km 1025 km 3707 km BRT and busway systems in the world Since 2011 (22 cities) 4119 km source: BRTdata.org, August 2013
  • 7. 0 25 50 75 100 125 150 175 0 5 10 15 20 25 1970 1975 1980 1985 1990 1995 2000 2005 2010 CumulativeNumberofCities NewCities Evolution of the number of cities per year BRT and busway systems in the world 2010: Guangzhou, Hefei, Yancheng, Zaozhuang – China; Jaipur - India; Bangkok - Thailand; East London Transit – UK; Barranquilla, Bucaramanga – Colombia; Ecatepec- Mexico; Brampton – Canada; … 2000: Bogotá (TransMilenio), Colombia 1974/1991*: Curitiba source: BRTdata.org, August 2013 1972/2010*: Lima * Busway / BRT year commenced
  • 8. Curitiba, RIT, 72 km median busways 1.2 million passengers per day Initial Bus Corridor 1972 Full BRT in 1982
  • 9. 1. Making buses run like surface metro – Curitiba 1982 median bus-ways longitudinally segregated tube stations with fare prepayment and level access physical and fare integration dispatch control at terminal stations. differentiated services: Expresso, Ligerao, Ligeirinho, Interbairros, Alimentador Special services downtown, hospitals, touristic bus, schools
  • 10. 2010 Evolution of the Integrated Network Source: Prefeitura de Curitiba, Parana
  • 11. “Linha Verde” Curitiba Corredor de 18 Km 2009 Fotos: Prefeitura de Curitiba, Parana
  • 12. Expansión de Capacidad “Corredor Boqueirao” 2010 Foto:PrefeituradeCuritiba,Parana
  • 13. 2. Implementing buses of high level of service, The Trans Val de Marne TVM – Paris 1993
  • 14. Implementing buses of high level of service, The Trans Val de Marne TVM – Paris 1993 Is the most used BHLS 1993 (13 km) and 2007 (7 km) 20 km bus lanes, 95% dedicated, mostly central segregated 29 stations (@ 700m) 39 articulated buses, specially designed and branded for the system
  • 15. Implementing buses of high level of service, The Trans Val de Marne TVM – Paris 1993 Information systems 23 km/h 17 km/h minimum peak 3.5 min headway (peak) Interval plus 3 minutes for 96% of the pax 66,000 trips/day, growing 7% per year Good integration with pedestrians and rail (4 RER and 1 subway) New vehicle Créalis for the BHLS routes
  • 17. Trolebus in Historic Disctrict
  • 18. 3. Expanding capacity with advanced operations Bogotá, 2000 Very high capacity 48,000 pphpd
  • 19. Bogotá, TransMilenio, 90 Km busways 1,8 milion pax/day
  • 21. Bogotá TransMilenio Eje Ambiental Avenida Jiménez PhotoITDP
  • 23. 4. Integrating transit services across modes and services – Santiago 2007
  • 24. Single process (¿big bang?) Fare integration Route optimization Formalization of providers Elimination of “competition on the street”
  • 25. The planning and implementation team was too optimistic - the reform resulted in serious difficulties
  • 26. Despite the initial difficulties, Santiago has risen to a higher level of performance The current system is better than the one it replaced Reductions in travel times, emissions and traffic incidents Still a lot to improve Traffic Fatalities in Santiago Source: CONACET 6366 4951 3406 3291 3047 2937 0 1000 2000 3000 4000 5000 6000 7000 2005 2006 2007 2008 2009 2010
  • 27. High commercial speed 42 km/h (now 35 km/h) 5. Introducing high speed buses on expressways – Istanbul 2008
  • 28. 45 Km central bus ways on expressway (100% segregated) Long station platforms -90m, separated 1.1 km on average Non-grade queue jumpers to access the Bosphorus Bridge, (mixed traffic) Low floor buses (articulated and bi-articulated) 30,000 passengers/ hour/ direction, 15 sec interval 600,000 passengers/day
  • 29. Expresso Tiradentes – Sao Paulo Foto: SPTrans
  • 30. 35,800 pax/day/km 6. Reducing transfers with direct services – Guangzhou 2010
  • 31. 22.5 km corridor Long stations –from 55m to 260m, with overtaking lanes Combines multiple direct services on the same infrastructure. 27,000 pphpd 350 buses phpd 800,000 passengers per day
  • 32. Future of BRT Running way guidance Vehicle propulsion technologies Information technologies Fare collection Planning and controlling operations
  • 33. Running way guidance Essen since 1980, Leeds, Cambridge since august 2011 Rouen, France (2001), Castellón de la Plana, Spain (2008), Nimes, France (2010) and Bologna, Italy (2010).Tested in Las Vegas, Nevada Mechanical Optical Magnetic Eindhoven (2004)
  • 34. O-Bahn, Adelaide, Australia Opened in 1986 12 Km, guided, $98 MM Aus (including buses), up to 18,000 pax/hour
  • 35. Km (Pax/Day) Type of Guidance Capital Cost (M€) Cost/Km (M€) Teor – Rouen, France 30 (49,000) Optical Infra 165 Buses 28 Total 193 Infra 5.5 Buses 0.9 Total 6.4 Spurbus Essen, Germany 16 [4] (17,000) Kerb Guided Infra N.A. Buses 0.35/ unit N.A. TVRCAS Castellon, Spain 2 (3,200) Optical (trolleybus) Infras 22 Buses 8 Total 30 Infra 11.0 Buses 3.8 Total 13.8 Cambridge, UK 25 (20,000) Kerb Guided Infra 85 Buses N.A. Infra 3.4 Source: Finn et al, 2011 Running way guidance costs
  • 36. Vehicle propulsion technologies Diesel - reduction of the fuel´s sulfur content, engine improvements and filters and catalysts Compressed natural gas CNG Liquefied natural gas LNG Electric (trolleybuses), since 1911, in 315 cities Hybrid-electric drives Battery Electric Hydraulic Hybrids Hydrogen powered buses
  • 37. Propulsion Standard Articulated Double- articulated Diesel 200 300 600 CNG 250 350 650 Hybrid 300 500 850 Trolley 400 650 1,000 Fuel Cell* > 1,000 - - Examples of Costs of Different Vehicle Technologies in Europe (Thousand €) Source: Finn et. al (2011) * Not yet in commercial operation
  • 38. Standard Articulated Double- Articulated Diesel 12 m 18 m 25 m High Floor with stairs 90-150 NA NA High Floor without stairs 130-160 330-365 490-500 Low entry 150-180 NA NA Low floor 280-310 430-460 630-650 CNG + 20-30% Hybrid +40-60% Air Conditioned +15 +35 Reference costs for Euro 5 Vehicles in Mexico (Thousand USD) Source: Suarez, 2011
  • 39. Meta-analysis of Exhaust Emissions http://www.embarq.org/en/pro ject/sustainable-urban- transport-fuels-and-vehicles- program Authors: Erin Cooper, Aileen Carrigan EMBARQ Magdala Arioli, EMBARQ Brasil Umang Jain, EMBARQ India Contributions: Hilda Martínez, Jorge Macias, Cynthia Menendez, Georg Schmid, CTS-EMBARQ Mexico Funding:
  • 40. Fuels and Technologies Fuels Exhaust After Treatment Technologies Diesel (and Hybrids) OC – Oxidation Catalyst DPF – Diesel Particulate Filter SCR – Selective Catalytic Reduction EGR – Exhaust Gas Recirculation Biodiesel (20 and 100%) SCR – Selective Catalytic Reduction EGR – Exhaust Gas Recirculation Compressed Natural Gas (CNG) OC – Oxidation Catalyst TWC – Three-way Catalyst Liquified Natural Gas (LNG) Ethanol Emissions vary with respect to fuels, technologies also significantly between the same fuel type and technology
  • 42. THC results graph Older CNG tech (mostly due to methane)
  • 43. NOx results graph CNG with 3WC Biodiesel ULSD with SCR
  • 44. PM results graph Diesel without emission control technologies
  • 45. CO2e results graph ULSD, EGR, DPF, Hybrid CNG, B20 w/o emission control technologies
  • 46. CO THC NOx PM CO2 LNG High Very High Medium Very Low E95 Very High Very High Very High Very High E93 Very High Very High Medium Very High D50+DPF Low Very Low High Medium High D50 Medium Very Low High Very High Medium D15+SCR High Very Low Medium Medium Low D15+OC Very Low Very Low Medium Medium Medium D15+Hybrid Very Low Very Low Variable Low Variable D15+EGR Very Low Very Low Medium Medium Very High D15+DPF Very Low Very Low High Low Very High D15 Low Very Low High Very High Very High D≥150+OC Low Low High Very High Low D≥150 Medium Low Very High Very High Medium CNG+OC Very Low Very High High Very Low Medium CNG+3WC Very Low Low Very Low Very Low Medium CNG Very High Very High Very High Very Low High B20 Low Low High Medium High B100+SCR Medium Very Low Low Low Very Low B100+EGR Very Low Very Low Medium Medium Low
  • 47. ITS – Fare Collection Advanced contactless smart cards are the most common media; flexible, secure, convenient Technologies: MIFARE, introduced in 1994, market share of more than 70% Octopus, in Honk Kong since 1997: applications in the Netherlands, Dubai and New Zealand Cubic, in 40 markets around the world Visa/Mastercard New: NFC and EMV; for use with cellular phones; under development in 80 countries
  • 48. Advanced route design – heuristics Bus and crew scheduling Advanced bus and crew scheduling Advanced operational control AVL/CAD Control: holding, early doors closing, TSP Traffic Signal Priority TSP ITS – Planning and Operations
  • 49. Avoiding Bus Bunching through Real Time Control Strategies Delgado, Muñoz, Giesen
  • 50. No Control Proposed Wfirst 7636.32 1438.62 Std. Dev. 649.36 146.56 % reduction -81.16 Wextra 6218.71 1010.52 Std. Dev. 2265.24 82.04 % reduction -83.75 Win-veh 175.32 1561.34 Std. Dev. 31.69 77.3 % reduction 790.55 W t_light 4052.81 2965.1 Std. Dev. 88.27 110.27 % reduction -26.84 Total 18083.16 6975.58 Std. Dev. 2600.63 275.12 % reduction -61.42 Results: High frequency scenario Transit Users
  • 51. 5. Results: Bus Loads (Capacity reached & high frequency)
  • 52. 5. Results: Cycle Time (Capacity reached & high frequency) 27-09-2013 52
  • 53. Results: Waiting time Distribution Scenario 1 (Capacity reached & high frequency) % of passengers that have to wait between: Period 15-25 Period 25-120 0-2 min 2-4 min > 4 min 0-2 min 2-4 min > 4 min No Control 57.76 29.60 12.64 63.46 27.68 8.86 Threshold 78.15 20.64 1.21 82.52 16.46 1.02 H 79.24 20.29 0.47 87.30 12.62 0.08 HBL 78.47 21.33 0.20 89.40 10.59 0.01