SlideShare uma empresa Scribd logo
1 de 5
Baixar para ler offline
Awais
OBJECTIVE
Secure a responsible position
of experience and abilities effecting mutual employee and employer growth
and success.
PERSONAL
Father’s Name
Date of Birth
Education
Citizenship
PROFESSIONAL
EXPERIENCE
FAUJI FERTILIZER COMPANY (FFC)
AS A MECHANICAL
Presently I am rendering my services as a Maintenance Engineer in FFC for
the last seven years. My job responsibility comprises
Trouble shooting
operation such as pipeline
leakages of heat exchanges and pressure vessels,
insulation of piping,
Execution of piping modification
construction of
Inventory management of
Preparation of work orders of day to day plant maintenance jobs in SAP and
supervision of maintenance jobs in field.
Preparation of preventive maintenance
per schedule.
Development of tools and tackles required for pressure vessels maintenance
and necessary spares in SAP.
Comprehensive preparation of plant turnarounds such as preparation of
comprehensive job scopes of jobs to be executed in TA, arrangement of
necessary plant spares require,
preparation of contract agreements for va
prearrangements required for job execution comprises rigging plans,
temporary modifications etc, hiring services of foreign vendors/OEM for TA,
preparation of bar charts of all maintenance jobs in Primavera and SAP, give
presentations on all major maintenance jobs giving details step by step
execution of job, resources required, time job shall take, cost impact
analysis of job
Supervision of all
valves, refractory repairs,
Implementation of ISO certifications.
Cell #
Email
AwaisAhmadQureshi
Secure a responsible position of a mechanical engineer and share
of experience and abilities effecting mutual employee and employer growth
Father’s Name Muzaffar Ahmad Qureshi
Date of Birth 20th
January, 1984
Bachelors in Mechanical Engineering
(Secured 2nd
Position Overall)
Pakistan
FAUJI FERTILIZER COMPANY (FFC)
MECHANICAL MAINTENANCE ENGINEER (August 2008
Presently I am rendering my services as a Maintenance Engineer in FFC for
years. My job responsibility comprises
Trouble shooting and rectification of day to day problems encounter in
operation such as pipeline leakages, valves leakages and passing problems,
of heat exchanges and pressure vessels, GLG leakages,
insulation of piping, refractory repair problems etc.
piping modification drawings, steel structures
construction of civil foundations, open channels, pits etc.
Inventory management of whole plant static equipment spares.
Preparation of work orders of day to day plant maintenance jobs in SAP and
supervision of maintenance jobs in field.
Preparation of preventive maintenance plans in SAP and their execution as
Development of tools and tackles required for pressure vessels maintenance
and necessary spares in SAP.
Comprehensive preparation of plant turnarounds such as preparation of
comprehensive job scopes of jobs to be executed in TA, arrangement of
necessary plant spares require, preparation of manpower deployment charts,
preparation of contract agreements for various contractors, all necessary
prearrangements required for job execution comprises rigging plans,
temporary modifications etc, hiring services of foreign vendors/OEM for TA,
preparation of bar charts of all maintenance jobs in Primavera and SAP, give
esentations on all major maintenance jobs giving details step by step
execution of job, resources required, time job shall take, cost impact
etc.
Supervision of all repairs of pressure vessels, heat exchangers, columns
actory repairs, pipe lines and modifications in TAs.
Implementation of ISO certifications.
#: +92 3334414340
Email:awaisqureshi84@gmail.com
and share my breadth
of experience and abilities effecting mutual employee and employer growth
(August 2008-Present)
Presently I am rendering my services as a Maintenance Engineer in FFC for
ms encounter in plant
passing problems,
GLG leakages, painting and
ctures modifications,
spares.
Preparation of work orders of day to day plant maintenance jobs in SAP and
plans in SAP and their execution as
Development of tools and tackles required for pressure vessels maintenance
Comprehensive preparation of plant turnarounds such as preparation of
comprehensive job scopes of jobs to be executed in TA, arrangement of
preparation of manpower deployment charts,
rious contractors, all necessary
prearrangements required for job execution comprises rigging plans,
temporary modifications etc, hiring services of foreign vendors/OEM for TA,
preparation of bar charts of all maintenance jobs in Primavera and SAP, give
esentations on all major maintenance jobs giving details step by step
execution of job, resources required, time job shall take, cost impact, safety
of pressure vessels, heat exchangers, columns,
in TAs.
Involve in correspondence with various foreign vendors for troubleshooting of
chronic problems etc.
Technical and safety training of staff employees.
Preparation of contracts for various plant jobs award to third parties in routine
plant maintenance.
MAJOR ACCOMPLISHMENTS
Replacement of Primary Reformer Catalyst Tubes (Micro Alloy)
− Ordering of reformer catalyst tubes as per process licensor specifications.
− Preparation of comprehensive rigging plan of catalyst tubes replacement.
− Fabrication of alignment clamps for welding of catalyst tubes with outlet
pigtails and specialized purging arrangement.
− Development of welding procedure specification in liason with inspection
unit.
− Preparation of complete job package mentioning step by step activities to be
performed, sources required to execute a particular job, overall dimensional
details of reformer for rigging, bar chart mentioning time required for each
activity, WPS for welding of tubes, other miscellaneous consumables and
resources required for job execution, to sublet job to contractor.
− Conducted job safety analysis in liason with operations and safety
department.
− Give presentation on whole job scope to higher management.
− Preparation of comprehensive check list that entails all steps required for
catalyst tubes replacement.
− Supervised whole job during TA.
Refractory Rehabilitation of Primary Reformer
Carried out complete replacement of third and fourth refractory bricks and
somke hood & convection section Z-blocks of reformer. It comprise
following activities;
− Ordering of large and regular bricks, ceramic blankets and Z-blocks with
extended anchors.
− Cutting of large and regular bricks for preparation of vertical and horizontal
expansion joints.
− Comprehensive training to all masons for bricks installation and expansion
joints preparation.
− Preparation of mock up so that correct orientation of each brick could be
ascertained prior installation in reformer in TA.
− Proposed a solution to rectify hotspots by installing ceramic fiber blankets
between metallic wall and Cera board. Also proposed similar solution for
installing Z-Blocks.
− Preparation of bar charts mentioning sequence wise activities and timing of
each activity.
− More than 1800 Z-blocks were installed in convection section and smoke
hood roof by placing ceramic blanket between Z-blocks and metallic wall.
− More than 45000 bricks were installed by trained masons as per given
guidelines and in stipulated time.
Thermography revealed no hot spots on metallic wall of reformer after TA.
Refractory Repair of Secondary Reformer
A hot spot appeared at conical and cylindrical portion of shell of secondary
reformer. Comprehensive refractory repair procedure was developed
comprising;
− Development of inspection plan of refractory as per guidelines of OEM.
− Elaborated each sequence of activity to be performed, resources required for
each activity, pre-arrangements required for each activity etc.
− Evaluation of quantity of both hot faced (Firecrete 95) and insulating
refractory (Firelite 2600Li) required for repair.
− All prearrangements for refractory casting such as fabrication of structure for
winch installation for ease in material shifting, fabrication of formwork for
refractory casting, procurement of all necessary masonry tools for execution
of job, vibrators, refractory mixers etc.
− Ordering of both hot faced and insulating refractory, anchors etc.
− Developed refractory casting procedure, its wet curing and dry curing
procedure.
− Mock up testing to ascertain time required for execution of complete job.
− Preparation of bar charts mentioning details and timing of each activity.
− Supervise whole job and executed every activity with dexterity.
Thermography revealed no hot spots after plant startup.
Replacement of Ammonia Converter
Replacement of Ammonia Converter Shell
− Preparation of complete ordering specifications of ammonia converter shell.
− Review of shell engineering drawings received from manufacturer.
− Preparation of complete rigging plan of shell comprises evaluation of cranes,
loading radius, boom point elevation and boom angle, evaluation of loading
trailers, evaluation of heavy pavement required for load shifting, requirement
of saddles for shell placement, coordination with government agencies for
transfer of shell from port to plantsite, evaluation of dismantling of nearby
structures and piping etc. All aforesaid activities were first checked in 3D
modeling software prior execution in field.
− Preparation of welding procedure specifications and welding of 05 low alloy
steel (P22) class 1 piping joints (40mm thickness).
− Preparation of barchart mentioning each activity sequence wise and timing of
each activity.
− Job safety analysis of all job activities.
− Execution of job as per bar chart.
Replacement of S200 basket with S300 basket
− Review of S300 basket drawings and evaluate its fitment in new shell.
− Fabrication of catalyst bed cartridges supporting structures.
− Fabrication of saddles for old basket transportation.
− Preparation of rigging plan for old basket removal and new basket insertaion
comprises cranes evaluation, loading radius, boom point elevation, loading
trailers etc.
− Preparation of bar chart for basket replacement in liaison with catalyst
loading and unloading vendor.
Low Alloy Piping Modification of Desulfuriser
To optimize temperature of inlet natural gas of desulfuriser to enhance
catalyst life, segregation of heating coils in convection section furnace was
proposed. Following jobs were executed;
− Review of piping drawings, civil foundations drawings, structure supports
drawing, convection section header boxes modifications drawings etc.
− Preparation of welding procedure specifications and executed welding of
more than hundred low alloy (P11) class 1 piping joints (Ø12’’, Ø6’’, Ø4’’,
Ø3’’ & Ø2’’).
− Fabrication of piping supports and execution of structure modifications as
per drawing.
− Construction of civil foundations for piping supports.
− Fabrication of header boxes and refractory casting (Firelite 14) in header
boxes.
− Execution of all field joints (44Ea) particularly of P1 coil joints (Ø4’’) at a
very congested location without any repair.
− Hydraulic testing and air blowing of piping prior commissioning.
Miscellaneous Maintenance Jobs
− Primary reformer inconel alloy catalyst tubes nipping.
− Bolting and welding of clamps on leaking flanges.
− Welding of pad and sleeves on leaked pipes.
− Piping (stainless steels, carbon steels and low alloy) fabrications.
− HP jetting and mechanical cleaning of heat exchangers in turnarounds and
shutdowns.
− Valve replacement both welded and flanged.
− Gland packing of valves and fermanite injection in gland stuffing boxes of
valves.
− Reclamation of valves (gate, globe, diaphragm, plug, check valves, pressure
seal valves etc.)
FOREIGN ASSIGNMENTS
Al-Bayroni Fertilzer Saudi Arabia (02 Months )- 2013
− Represented FFC at Al-Bayroni Fertilizer Saudi Arabia (Jubail) for static
equipment maintenance services at ammonia plant.
− Inspect and supervise maintenance of high pressure equipments such as
desulphurizer, medium and low temperature shift converters, primary and
secondary reformers, pressure vessels, heat exchangers etc.
− Develop comprehensive inspection and maintenance reports of equipments
inspected and repaired.
− Develop job plans for their 2EH plant turnaround.
AS A PROJECT ENGINEER (Sep. 2007- 2008)
As a project engineer I gone through following;
ASME Section VIII Div I and Div II
ANSI Standards for piping such as B31.3, B31.8 etc
ANSI Standards for pipe fittings such as B16.5, B16.47, B16.25, B16.9,
B16.20, B2.1, B16.34 etc
API Standards for Tanks (API 620), Heat Exchangers(API 660), API 650 etc
TEMA Standard
ASTM Standards
AWS Standards (A5.1, A5.4, A5.5 etc)
AISC Manual(ASD)
PROJECTS ACCOMPLISHED AS A PROJECT ENGINEER
BMR Natural Gas Compression Project
I was involved in a mega project termed as “BMR Natural Gas Compression
Project”.
Project has civil and mechanical phases.
• In civil phase; compressor foundations, pipe supports, gas generators and
slug catcher foundation, infrastructure, buildings etc were constructed.
• In mechanical phase; compressor packages installation, piping, high pressure
equipments such as slug catcher, gas filters, heat exchangers etc were
erected.
SOFTWARE
SKILLS
Softwares: AutoCAD, Solid Edge, Compress, CodeCalc, SAP (PM & QM
Modules), Primavera & Microsoft Office.
MANAGEMENT
COURSES
Developing Essential Management Skills
Decision making and problem solving skills
Maintenance management from break down maintenance to total
productive maintenance.
EXTRA
CURRICULAR
ACTIVITIES
Member of FFC Cricket Team.
Acted in two plays of FFC annual fun fair.
Member of Civil Defense Society.

Mais conteúdo relacionado

Mais procurados

Construction manual chapter 2
Construction manual chapter 2Construction manual chapter 2
Construction manual chapter 2vps1968
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnesto Costorio
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper
 
Operation & intervention engineer achievements
Operation & intervention engineer achievementsOperation & intervention engineer achievements
Operation & intervention engineer achievementsJoseph Bracic
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302Rhod Mayers
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.walaa ahmed ahmed attiia
 
Projects CV January 2016
Projects CV January 2016Projects CV January 2016
Projects CV January 2016Bryan Johnson
 
Tracy Brooks - Plant Maintenance Engineer
Tracy Brooks - Plant Maintenance EngineerTracy Brooks - Plant Maintenance Engineer
Tracy Brooks - Plant Maintenance EngineerTracy Brooks
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievementsJoseph Bracic
 

Mais procurados (20)

redacvEPT
redacvEPTredacvEPT
redacvEPT
 
Construction manual chapter 2
Construction manual chapter 2Construction manual chapter 2
Construction manual chapter 2
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
 
RajeevCV2016
RajeevCV2016RajeevCV2016
RajeevCV2016
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015
 
Operation & intervention engineer achievements
Operation & intervention engineer achievementsOperation & intervention engineer achievements
Operation & intervention engineer achievements
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302
 
Resume-RS
Resume-RSResume-RS
Resume-RS
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
 
Projects CV January 2016
Projects CV January 2016Projects CV January 2016
Projects CV January 2016
 
Tracy Brooks - Plant Maintenance Engineer
Tracy Brooks - Plant Maintenance EngineerTracy Brooks - Plant Maintenance Engineer
Tracy Brooks - Plant Maintenance Engineer
 
Moufid_CV06112014
Moufid_CV06112014Moufid_CV06112014
Moufid_CV06112014
 
Ronald-Smith
Ronald-SmithRonald-Smith
Ronald-Smith
 
CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
 
TARIQUE ALSTOM
TARIQUE ALSTOMTARIQUE ALSTOM
TARIQUE ALSTOM
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievements
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 

Semelhante a CV. (20)

Riaz Cv
Riaz CvRiaz Cv
Riaz Cv
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
03 Mohamed_fathi
03 Mohamed_fathi03 Mohamed_fathi
03 Mohamed_fathi
 
KASHF ALI
KASHF ALIKASHF ALI
KASHF ALI
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 
RESUME 2015 - Copy
RESUME 2015 - CopyRESUME 2015 - Copy
RESUME 2015 - Copy
 
CV Novo
CV NovoCV Novo
CV Novo
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
AlbertiResume Updated
AlbertiResume UpdatedAlbertiResume Updated
AlbertiResume Updated
 
Siddharth_resume_Engg.
Siddharth_resume_Engg.Siddharth_resume_Engg.
Siddharth_resume_Engg.
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Resume
ResumeResume
Resume
 
Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)
 
Abhishek
AbhishekAbhishek
Abhishek
 
Ng onga Mazimba CV
Ng onga Mazimba CVNg onga Mazimba CV
Ng onga Mazimba CV
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 

CV.

  • 1. Awais OBJECTIVE Secure a responsible position of experience and abilities effecting mutual employee and employer growth and success. PERSONAL Father’s Name Date of Birth Education Citizenship PROFESSIONAL EXPERIENCE FAUJI FERTILIZER COMPANY (FFC) AS A MECHANICAL Presently I am rendering my services as a Maintenance Engineer in FFC for the last seven years. My job responsibility comprises Trouble shooting operation such as pipeline leakages of heat exchanges and pressure vessels, insulation of piping, Execution of piping modification construction of Inventory management of Preparation of work orders of day to day plant maintenance jobs in SAP and supervision of maintenance jobs in field. Preparation of preventive maintenance per schedule. Development of tools and tackles required for pressure vessels maintenance and necessary spares in SAP. Comprehensive preparation of plant turnarounds such as preparation of comprehensive job scopes of jobs to be executed in TA, arrangement of necessary plant spares require, preparation of contract agreements for va prearrangements required for job execution comprises rigging plans, temporary modifications etc, hiring services of foreign vendors/OEM for TA, preparation of bar charts of all maintenance jobs in Primavera and SAP, give presentations on all major maintenance jobs giving details step by step execution of job, resources required, time job shall take, cost impact analysis of job Supervision of all valves, refractory repairs, Implementation of ISO certifications. Cell # Email AwaisAhmadQureshi Secure a responsible position of a mechanical engineer and share of experience and abilities effecting mutual employee and employer growth Father’s Name Muzaffar Ahmad Qureshi Date of Birth 20th January, 1984 Bachelors in Mechanical Engineering (Secured 2nd Position Overall) Pakistan FAUJI FERTILIZER COMPANY (FFC) MECHANICAL MAINTENANCE ENGINEER (August 2008 Presently I am rendering my services as a Maintenance Engineer in FFC for years. My job responsibility comprises Trouble shooting and rectification of day to day problems encounter in operation such as pipeline leakages, valves leakages and passing problems, of heat exchanges and pressure vessels, GLG leakages, insulation of piping, refractory repair problems etc. piping modification drawings, steel structures construction of civil foundations, open channels, pits etc. Inventory management of whole plant static equipment spares. Preparation of work orders of day to day plant maintenance jobs in SAP and supervision of maintenance jobs in field. Preparation of preventive maintenance plans in SAP and their execution as Development of tools and tackles required for pressure vessels maintenance and necessary spares in SAP. Comprehensive preparation of plant turnarounds such as preparation of comprehensive job scopes of jobs to be executed in TA, arrangement of necessary plant spares require, preparation of manpower deployment charts, preparation of contract agreements for various contractors, all necessary prearrangements required for job execution comprises rigging plans, temporary modifications etc, hiring services of foreign vendors/OEM for TA, preparation of bar charts of all maintenance jobs in Primavera and SAP, give esentations on all major maintenance jobs giving details step by step execution of job, resources required, time job shall take, cost impact etc. Supervision of all repairs of pressure vessels, heat exchangers, columns actory repairs, pipe lines and modifications in TAs. Implementation of ISO certifications. #: +92 3334414340 Email:awaisqureshi84@gmail.com and share my breadth of experience and abilities effecting mutual employee and employer growth (August 2008-Present) Presently I am rendering my services as a Maintenance Engineer in FFC for ms encounter in plant passing problems, GLG leakages, painting and ctures modifications, spares. Preparation of work orders of day to day plant maintenance jobs in SAP and plans in SAP and their execution as Development of tools and tackles required for pressure vessels maintenance Comprehensive preparation of plant turnarounds such as preparation of comprehensive job scopes of jobs to be executed in TA, arrangement of preparation of manpower deployment charts, rious contractors, all necessary prearrangements required for job execution comprises rigging plans, temporary modifications etc, hiring services of foreign vendors/OEM for TA, preparation of bar charts of all maintenance jobs in Primavera and SAP, give esentations on all major maintenance jobs giving details step by step execution of job, resources required, time job shall take, cost impact, safety of pressure vessels, heat exchangers, columns, in TAs.
  • 2. Involve in correspondence with various foreign vendors for troubleshooting of chronic problems etc. Technical and safety training of staff employees. Preparation of contracts for various plant jobs award to third parties in routine plant maintenance. MAJOR ACCOMPLISHMENTS Replacement of Primary Reformer Catalyst Tubes (Micro Alloy) − Ordering of reformer catalyst tubes as per process licensor specifications. − Preparation of comprehensive rigging plan of catalyst tubes replacement. − Fabrication of alignment clamps for welding of catalyst tubes with outlet pigtails and specialized purging arrangement. − Development of welding procedure specification in liason with inspection unit. − Preparation of complete job package mentioning step by step activities to be performed, sources required to execute a particular job, overall dimensional details of reformer for rigging, bar chart mentioning time required for each activity, WPS for welding of tubes, other miscellaneous consumables and resources required for job execution, to sublet job to contractor. − Conducted job safety analysis in liason with operations and safety department. − Give presentation on whole job scope to higher management. − Preparation of comprehensive check list that entails all steps required for catalyst tubes replacement. − Supervised whole job during TA. Refractory Rehabilitation of Primary Reformer Carried out complete replacement of third and fourth refractory bricks and somke hood & convection section Z-blocks of reformer. It comprise following activities; − Ordering of large and regular bricks, ceramic blankets and Z-blocks with extended anchors. − Cutting of large and regular bricks for preparation of vertical and horizontal expansion joints. − Comprehensive training to all masons for bricks installation and expansion joints preparation. − Preparation of mock up so that correct orientation of each brick could be ascertained prior installation in reformer in TA. − Proposed a solution to rectify hotspots by installing ceramic fiber blankets between metallic wall and Cera board. Also proposed similar solution for installing Z-Blocks. − Preparation of bar charts mentioning sequence wise activities and timing of each activity. − More than 1800 Z-blocks were installed in convection section and smoke hood roof by placing ceramic blanket between Z-blocks and metallic wall. − More than 45000 bricks were installed by trained masons as per given guidelines and in stipulated time. Thermography revealed no hot spots on metallic wall of reformer after TA.
  • 3. Refractory Repair of Secondary Reformer A hot spot appeared at conical and cylindrical portion of shell of secondary reformer. Comprehensive refractory repair procedure was developed comprising; − Development of inspection plan of refractory as per guidelines of OEM. − Elaborated each sequence of activity to be performed, resources required for each activity, pre-arrangements required for each activity etc. − Evaluation of quantity of both hot faced (Firecrete 95) and insulating refractory (Firelite 2600Li) required for repair. − All prearrangements for refractory casting such as fabrication of structure for winch installation for ease in material shifting, fabrication of formwork for refractory casting, procurement of all necessary masonry tools for execution of job, vibrators, refractory mixers etc. − Ordering of both hot faced and insulating refractory, anchors etc. − Developed refractory casting procedure, its wet curing and dry curing procedure. − Mock up testing to ascertain time required for execution of complete job. − Preparation of bar charts mentioning details and timing of each activity. − Supervise whole job and executed every activity with dexterity. Thermography revealed no hot spots after plant startup. Replacement of Ammonia Converter Replacement of Ammonia Converter Shell − Preparation of complete ordering specifications of ammonia converter shell. − Review of shell engineering drawings received from manufacturer. − Preparation of complete rigging plan of shell comprises evaluation of cranes, loading radius, boom point elevation and boom angle, evaluation of loading trailers, evaluation of heavy pavement required for load shifting, requirement of saddles for shell placement, coordination with government agencies for transfer of shell from port to plantsite, evaluation of dismantling of nearby structures and piping etc. All aforesaid activities were first checked in 3D modeling software prior execution in field. − Preparation of welding procedure specifications and welding of 05 low alloy steel (P22) class 1 piping joints (40mm thickness). − Preparation of barchart mentioning each activity sequence wise and timing of each activity. − Job safety analysis of all job activities. − Execution of job as per bar chart. Replacement of S200 basket with S300 basket − Review of S300 basket drawings and evaluate its fitment in new shell. − Fabrication of catalyst bed cartridges supporting structures.
  • 4. − Fabrication of saddles for old basket transportation. − Preparation of rigging plan for old basket removal and new basket insertaion comprises cranes evaluation, loading radius, boom point elevation, loading trailers etc. − Preparation of bar chart for basket replacement in liaison with catalyst loading and unloading vendor. Low Alloy Piping Modification of Desulfuriser To optimize temperature of inlet natural gas of desulfuriser to enhance catalyst life, segregation of heating coils in convection section furnace was proposed. Following jobs were executed; − Review of piping drawings, civil foundations drawings, structure supports drawing, convection section header boxes modifications drawings etc. − Preparation of welding procedure specifications and executed welding of more than hundred low alloy (P11) class 1 piping joints (Ø12’’, Ø6’’, Ø4’’, Ø3’’ & Ø2’’). − Fabrication of piping supports and execution of structure modifications as per drawing. − Construction of civil foundations for piping supports. − Fabrication of header boxes and refractory casting (Firelite 14) in header boxes. − Execution of all field joints (44Ea) particularly of P1 coil joints (Ø4’’) at a very congested location without any repair. − Hydraulic testing and air blowing of piping prior commissioning. Miscellaneous Maintenance Jobs − Primary reformer inconel alloy catalyst tubes nipping. − Bolting and welding of clamps on leaking flanges. − Welding of pad and sleeves on leaked pipes. − Piping (stainless steels, carbon steels and low alloy) fabrications. − HP jetting and mechanical cleaning of heat exchangers in turnarounds and shutdowns. − Valve replacement both welded and flanged. − Gland packing of valves and fermanite injection in gland stuffing boxes of valves. − Reclamation of valves (gate, globe, diaphragm, plug, check valves, pressure seal valves etc.) FOREIGN ASSIGNMENTS Al-Bayroni Fertilzer Saudi Arabia (02 Months )- 2013 − Represented FFC at Al-Bayroni Fertilizer Saudi Arabia (Jubail) for static equipment maintenance services at ammonia plant. − Inspect and supervise maintenance of high pressure equipments such as desulphurizer, medium and low temperature shift converters, primary and
  • 5. secondary reformers, pressure vessels, heat exchangers etc. − Develop comprehensive inspection and maintenance reports of equipments inspected and repaired. − Develop job plans for their 2EH plant turnaround. AS A PROJECT ENGINEER (Sep. 2007- 2008) As a project engineer I gone through following; ASME Section VIII Div I and Div II ANSI Standards for piping such as B31.3, B31.8 etc ANSI Standards for pipe fittings such as B16.5, B16.47, B16.25, B16.9, B16.20, B2.1, B16.34 etc API Standards for Tanks (API 620), Heat Exchangers(API 660), API 650 etc TEMA Standard ASTM Standards AWS Standards (A5.1, A5.4, A5.5 etc) AISC Manual(ASD) PROJECTS ACCOMPLISHED AS A PROJECT ENGINEER BMR Natural Gas Compression Project I was involved in a mega project termed as “BMR Natural Gas Compression Project”. Project has civil and mechanical phases. • In civil phase; compressor foundations, pipe supports, gas generators and slug catcher foundation, infrastructure, buildings etc were constructed. • In mechanical phase; compressor packages installation, piping, high pressure equipments such as slug catcher, gas filters, heat exchangers etc were erected. SOFTWARE SKILLS Softwares: AutoCAD, Solid Edge, Compress, CodeCalc, SAP (PM & QM Modules), Primavera & Microsoft Office. MANAGEMENT COURSES Developing Essential Management Skills Decision making and problem solving skills Maintenance management from break down maintenance to total productive maintenance. EXTRA CURRICULAR ACTIVITIES Member of FFC Cricket Team. Acted in two plays of FFC annual fun fair. Member of Civil Defense Society.