THE
NORTHERN
GATEWAY
PROJECT
B Y B R I T TA N Y C H Y Z , A B D U L L A H A L S I N A N ,
A R M A N D O B O R J A S
CONTENTS
•Introduction
•Project Overview
•Timeline & Current
Status
•Social & Economic
Benefits & Challenges
•First Nations & Métis
Concerns
•Other Issues
•Environmental
Challenges
•Terrestrial Wildlife
•Marine Wildlife
•Aquatic Ecosystems
•Pollution
•Recommendations
•Conclusion
2
INTRODUCTION
A pipeline that will transfer heavy oil from Alberta to
the shores of British Columbia.
The capital cost is $7.9 Billion.
A collaboration between Enbridge and the Aboriginal
Equity Partners (AEP).
Find new ways to diversify Canadian oil industry due to
the US becoming self-dependent.
Build a pipeline with the highest safety and environmental
standards.
The objective of this presentation is to highlight the
main challenges and address the current status of
the project. 3
PROJECT
OVERVIEW
4
PROJECT OVERVIEW
 Two parallel lines:
 Marine Terminal with 2 tanker berths, 19 storage tanks and can
handle 220 ships per year.
Line Westbound Eastbound
Route Bruderheim,AB to Kitimat, BC Kitimat, BC to Bruderheim,AB
Length 1,177 km 1,177 km
Diameter 36” 20”
Fluid Type Heavy Oil Natural Gas Condensate
Volume 525,000 barrels/day 193,000 barrels/day
[1]
5
TIMELINE & CURRENT STATUS
1998 • Project Feasibility Study and Needs Analysis.
2004 • Formal launch of the Northern Gateway Project.
2005
• Kitimat named as the terminal site.
2006
• Minister of the Environment calls for a Joint Review Panel (JRP).
2008
• The JRP terms of reference, scope of review and process are outlined.
2010
• Northern Gateway Pipeline Project JRP formally established.
2011
• Janet Holder appointed Senior leader of Northern Gateway.
2012
• JRP hearings begin in 17 communities to hear oral and written evidence and expert testimony.
2013
• JRP community hearings concludes closing arguments and statements.
2014
• The government approves the project with 209 conditions.
2014 • Several opposing parties appeal the decision.
2016 • The court dismantled the approval decision due to lack of consultation with First Nations.
62016
• On November 29th, the Federal Gov’t officially rejects the implementation of Northern
Gateway Project
SOCIAL &
ECONOMIC
FACTORS
7
SOCIAL AND ECONOMIC BENEFITS
AND CHALLENGES
• Create jobs and inspire economic growth.
• Contribute:
– $312 Billion to the Canada’s Gross Domestic Product;
– $98 Billion in tax revenue; and
– $70 Billion in labor.
• Will create 2000-3000 jobs during peak construction activities, and
1200 long term positions.
[2]
[2]
8
FIRST NATIONS AND MÉTIS
[3]
9
FIRST NATIONS AND MÉTIS CONCERNS
•Environmental and land use concerns
–Fish-bearing water bodies (Fraser River and Skeena
River)
–Great Bear Rainforest
•Inadequate consultation
–Federal Court of Appeal overturned the NEB Joint
Review Panel’s approval of the project in June 2016.
–Enbridge was trying to accommodate the concerns of
First Nations and Métis groups.
•Financial benefits
–Increase in equity (~33%);
–Employment. 10
OTHER ISSUES
• Concerns about impacts
to commercial fishing.
• Stigma
of Oil Sands development.
• Public perception
of Enbridge.
[4]
[5]
[6]
11
ENVIRONMENTAL
CHALLENGES
12
ENVIRONMENTAL CHALLENGES
•Impacts considered by the NEB Joint Review
Panel:
–Terrestrial wildlife;
–Marine wildlife;
–Aquatic ecosystems; and
–Pollution.
13
TERRESTRIAL WILDLIFE
• Woodland Caribou
– Right-of-ways cause more predation on caribou
• Grizzly Bear
• Endangerment
[7] [8]
14
MARINE WILDLIFE
• Killer whale
• HumpbackWhale
• Tanker traffic and speed
• Noise disturbance
[9] [10]
15
POLLUTION
•Spills.
•Construction activities.
•Electric motors at
Kitimat terminal.
[13]
[12]
[14]
17
RECOMMENDATIONS
• Mitigation plans, as outlined in the Report of the Joint
Review Panel:
– increased pipeline wall thickness.
– decreased distance between isolation valves.
– implantation of a leak-detection system.
– use of trenchless crossing techniques.
– use of tunnels in mountainous terrain to lower slide risk .
– improved tanker navigation and use of tug boats to prevent
tanker collisions.
– surveillance of humpback whales.
– establishing a Fisheries Liaison Committee.
• NEB found that Northern Gateway’s mitigation
procedures were appropriate, and thus recommend the
implementation of the project. 18
CONCLUSION
•A highly complex and controversial project since
its early beginnings.
•Has been a subject of intense public scrutiny.
•It has the potential of creating jobs and
diversifying the economy.
•However, opposition and environmentalists fear its
potential impacts.
•Federal government concluded that the project
was not in the best interest of communities along
the pipeline route.
•The Northern Gateway Project has been
dismissed. 19
QUESTIONS?
[15]
PRESENTATION REFERENCES
 [1] Northern Gateway. n.d.-d. Project Overview, http://www.gatewayfacts.ca/About-The-Project/Project-
Overview.aspx (accessed 25 November 2016).
 [2] CAPP. 2016. Crude Oil Forecast, Markets and Transportation, CAPP (June 2016).
 [3] Bowles, P.,Veltmeyer H. 2013.Voices of Resistance to Canada’s Enbridge Northern Gateway Pipeline.
Global Research, 25 December 2013, http://www.globalresearch.ca/voices-of-resistance-to-canadas-enbridge-
northern-gateway-pipeline/5362704 (accessed 22 November 2016).
 [4] http://www.fisheries.noaa.gov/stories/2015/09/images/chinooksalmon00.jpg
 [5] http://www.pngall.com/wp-content/uploads/2016/04/Fishing-Pole-PNG-Clipart.png
 [6] http://www.theontarion.com/wp-content/uploads/2014/11/oil-sands_kris-kr%C3%BCg.jpg
 [7] http://www.stantec.com/content/stantec/en/our-work/projects/creative-projects/caribou-
monitoring/_jcr_content/promotionalImage.rpath.1200.0.medium.1438958934387.jpg
 [8] http://static1.businessinsider.com/image/5499ddee69bedd0b4d8b456a-1200-
924/4765579600_dcd5a2f80f_o.jpg
 [9] https://www.wildgratitude.com/wp-content/uploads/2015/06/whale-meaning-whale-symbolism.jpg
 [10] https://marinebiologynews.files.wordpress.com/2016/02/8589130579880-orca-underwater-wallpaper-
hd.jpg?w=1200
 [11] National Energy Board. (2013). Connections: Report of the Joint Review Panel for the Enbridge Northern
Gateway Project Volume 1. National Energy Board. Calgary: National Energy Board. Retrieved November 22,
2016, from https://docs.neb-one.gc.ca/ll-
eng/llisapi.dll/fetch/2000/90464/90552/384192/620327/624909/2396699/Volume_1_%2D_Connections_%2D
_A3S7C4.pdf?nodeid=2395827&vernum=-2
 [12] http://assets.inhabitat.com/wp-content/blogs.dir/1/files/2010/09/BP-Stops-Oil-3.jpg
 [13]
https://i.cbc.ca/1.2774265.1411405819!/fileImage/httpImage/image.png_gen/derivatives/original_620/tanker-
graphic.png
 [14] http://www.jackmcneary.com/assets/images/Kalamazoo_oil_spill_2010.JPG
 [15] https://grist.files.wordpress.com/2012/09/otter-08.jpg 21
REPORT REFERENCES
• Allan, R. 2012. An Economic Assessment of Northern Gateway (January 2012).
• Bowles, P., Veltmeyer H. 2013. Voices of Resistance to Canada’s Enbridge Northern Gateway Pipeline. Global Research, 25 December 2013,
http://www.globalresearch.ca/voices-of-resistance-to-canadas-enbridge-northern-gateway-pipeline/5362704 (accessed 22 November 2016).
• CAPP. 2016. Crude Oil Forecast, Markets and Transportation, CAPP (June 2016). Carrier Sekani Tribal Council. 2011. Member Nations,
http://www.carriersekani.ca/member-nations/ (accessed 26 November 2016).
• CBC News. 2012. Northern Gateway pipeline: benefits vs. concerns. CBC News (published online 10 January 2012).
http://www.cbc.ca/news/canada/northern-gateway-pipeline-benefits-vs-concerns-1.1135312. Coastal First Nations. 2010. Communities,
http://www.coastalfirstnations.ca/communities (accessed 26 November 2016).
• Coastal First Nations. 2016. Supreme Court Rules BC Government Must Review Enbridge Northern Gateway Pipeline and Consult with
Gitga’at First Nation (Reprint 13 January 2016). http://www.coastalfirstnations.ca/news-release/january-13-2016-119pm.
• Coates, K. 2014. First Nations hold the key to the Northern Gateway pipeline. The Globe and Mail (published online 17 June 2014).
http://www.theglobeandmail.com/opinion/first-nations-hold-the-key-to-the-northern-gateway-pipeline/article19213035/.
• Enbridge Northern Gateway Project Joint Review Panel. 2014. Report of the Joint Review Panel for the Enbridge Northern Gateway Project
- Considerations Section 9 (17 January 2014).
• Environment Canada. 2012. Recovery Strategy for the Woodland Caribou (Rangifer tarandus caribou), Boreal population, in Canada,
Environment Canada, Ottawa, Ontario (2012).
• Fausto, J, A Featherstone. 2011. Halton Wasterwater Pumping Station Master Plan Class Environmental Assessment, LGL Limited
Environmental Research Associates, Burlington, Ontario (2011).
• Government of Canada. 2016. Canadian Environmental Assessment Act, 2012 (S.C. 2012, c. 19, s. 52) (Reprint). http://laws-
lois.justice.gc.ca/eng/acts/C-15.21/page-2.html#h-5.
• Luggi, D. 2010. Proposed Enbridge pipeline is not worth the risk. Carrier Sekani Tribal Council,
http://www.carriersekani.ca/images/docs/enbridge/010710%20MPs.pdf (accessed 26 November 2016). National Energy Board. 2012. The Joint
Review Panel, 2 November 2012, http://gatewaypanel.review-examen.gc.ca/clf-nsi/bts/jntrvwpnl-eng.html (accessed 25 November 2016).
• National Energy Board. 2012. The Joint Review Process, 18 September 2012, http://gatewaypanel.review-examen.gc.ca/clf-nsi/bts/jntrvwprcss-
eng.html (accessed 26 November 2016).
• National Energy Board. 2013a. Connections: Report of the Joint Review Panel for the Enbridge Northern Gateway Project Volume 1,
National Energy Board, Calgary, Alberta (December 2013).
22
• National Energy Board. 2013b. Considerations: Report of the Joint Review Panel for the Enbridge Northern Gateway Project Volume 2, National Energy
Board, Calgary, Alberta (December 2013).
• National Energy Board. 2014. Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 and Paragraph 104 (4) (b)
of the Jobs, Growth and Long-term Prosperity Act, 7 June 2014, http://gatewaypanel.review-examen.gc.ca/clf-nsi/dcmnt/dcsnsttmnt-eng.html (accessed 26
November 2016).
• Natural Resources Defense Council. 2011. Submission of the Natural Resources Defense Council to the Enbridge Northern Gateway Project Joint Review
Panel: Regarding Underwater Noise Impacts from Northern Gateway Tanker Traffic, Natural Resources Defense Council, Santa Monica, California (22
December 2011).
• Nored, M., Tweten, D., Brun, K. 2011. Compressor Station Piping Noise: Noise Mechanisms and Prediction Methods, Gas Machinery Research Council
(February 2011). Northern Gateway. n.d.-a. Benefits, http://www.gatewayfacts.ca/Benefits/Jobs-And-Training.aspx (accessed 25 November 2016). Northern
Gateway. n.d.-b. First Nations, http://www.gatewayfacts.ca/First-Nations.aspx (accessed 24 November 2016).
• Northern Gateway. n.d.-c. The most comprehensively scrutinized pipeline ever, http://www.gatewayfacts.ca/Newsroom/Pipeline-Safety/The-most-
comprehensively-scrutinized-pipeline-ever.aspx (accessed 26 November 2016).
• Northern Gateway. 2016. Northern Gateway announces it will not appeal recent Federal Court of Appeal decision that reversed project approval (Reprint
20 September 2016). http://www.gatewayfacts.ca/Newsroom/In-the-Media/Northern-Gateway-announces-it-will-not-appeal.aspx. Northern Gateway. n.d.-d.
Project Overview, http://www.gatewayfacts.ca/About-The-Project/Project-Overview.aspx (accessed 25 November 2016). Northern Gateway. n.d.-e. Why
NGP, http://www.gatewayfacts.ca/About-The-Project/Why-NGP.aspx (accessed 24 November 2016 2016).
• Office of the Wet'suwet'en. 2013. Argument of Office of Wet'suwet'en, 13 May 2013, http://www.wetsuweten.com/files/FINAL_ARGUMENT.pdf
(downloaded 26 November 2016). Pipe Up Against Enbridge. n.d. List of organizations, http://www.pipeupagainstenbridge.ca/the-movement/organizations
(accessed 25 November 2016).
• Raincoast Conservation Foundation. 2010. What’s at Stake? The cost of oil on British Columbia’s priceless coast. Raincoast Conservation Foundation.
Sidney, British Columbia (2010).
• Raincoast Conservation Foundation. 2011. Written Evidence of Raincoast Conservation Foundation, Raincoast Conservation Foundation, Calgary, Alberta
(21 December 2011).
• Raincoast Conservation Foundation. 2014. Raincoast’s Efforts: Enbridge’s Northern Gateway project and the NEB Hearings,
http://www.raincoast.org/enbridge-northern-gateway/ (accessed 25 November 2016). Save the Fraser. 2012. Save the Fraser Declaration,
http://savethefraser.ca/Fraser-Declaration-May2013.pdf (accessed 26 November 2016).
• Stantec Consulting Ltd. 2013. Parkway West Compressor Station: Environmental Report, Union Gas Limited, Guelph, Ontario (February 2013).
• Statistics Canada. 2016. Labour force characteristics, seasonally adjusted, by province (monthly), 4 November 2014, http://www.statcan.gc.ca/tables-
tableaux/sum-som/l01/cst01/lfss01c-eng.htm (accessed 24 November 2016).
• Sterritt, A. 2012. Enbridge can’t deny islands, Great Bear Rainforest. Vancouver Sun (published online 13 December 2012).
http://www.vancouversun.com/technology/Enbridge+deny+islands+Great+Bear+Rainforest/7696467/story.html.
23
REPORT REFERENCES
• Tasker, J. 2016a. Trudeau cabinet approves Trans Mountain, Line 3 pipelines, rejects Northern Gateway. CBC News (published online
29 November 2016). http://www.cbc.ca/news/politics/federal-cabinet-trudeau-pipeline-decisions-1.3872828.
• Tasker, J. 2016b. Liberals decide fate of Northern Gateway pipeline, but won't announce until next week. CBC News (published online
25 November 2016). http://www.cbc.ca/news/politics/northern-gateway-final-decision-friday-1.3865627.
• Tera Environmental Consultants. 2014. Environmental Impact Study of Core Area Wastewater Treatment Program Facilities:
Terrestrial Environment, Capital Regional District, Calgary, Alberta (March 2014).
• The Associated Press. 2015. Enbridge settles with Michigan over 2010 Kalamazoo oil spill. CBC News (published online 13 May 2015).
http://www.cbc.ca/news/business/enbridge-settles-with-michigan-over-2010-kalamazoo-oil-spill-1.3072149.
• Vernon, C. 2013. What Part of 'No' Does Enbridge Not Understand. The Huffington Post (published online 28 June 2013).
http://www.huffingtonpost.ca/caitlyn-vernon/enbridge-northern-gateway-no_b_3514309.html.
• Yinka Dene Alliance. 2014. Rejection of the Enbridge Northern Gateway Project, 8 December 2014.
http://yinkadene.ca/images/uploads/2014-12-08_YDA_to_Premier_Prentice.pdf (accessed 26 November 2016).
24
REPORT REFERENCES

Mais conteúdo relacionado

Mais procurados

Land Reclamation & Coastal Engineering
Land Reclamation & Coastal EngineeringLand Reclamation & Coastal Engineering
Land Reclamation & Coastal EngineeringCorin Tan
 
Herring River Restoration Project
Herring River Restoration ProjectHerring River Restoration Project
Herring River Restoration ProjectMary Lou Roberts
 
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Recycling and Resource Management Division
 
Reclamation presentation 2
Reclamation presentation 2Reclamation presentation 2
Reclamation presentation 2Enoch Chang
 
News Release: Commerce Resources Corp. Updates Community Dialogue and Inform...
News Release:  Commerce Resources Corp. Updates Community Dialogue and Inform...News Release:  Commerce Resources Corp. Updates Community Dialogue and Inform...
News Release: Commerce Resources Corp. Updates Community Dialogue and Inform...Commerce Resources Corp. (TSXv:CCE)
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Adam Berry
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockHoboken Resistance
 
Erosion As Pollution: The net economic and shoreline effects of coastal struc...
Erosion As Pollution: The net economic and shoreline effects of coastal struc...Erosion As Pollution: The net economic and shoreline effects of coastal struc...
Erosion As Pollution: The net economic and shoreline effects of coastal struc...Lisa Granquist
 
Shoreline Change in Urban Massachusetts, Time for Retreat?
Shoreline Change in Urban Massachusetts, Time for Retreat?Shoreline Change in Urban Massachusetts, Time for Retreat?
Shoreline Change in Urban Massachusetts, Time for Retreat?Lisa Granquist
 
Land Reclamation In Hong Kong ( Especially In
Land  Reclamation  In  Hong  Kong ( Especially  InLand  Reclamation  In  Hong  Kong ( Especially  In
Land Reclamation In Hong Kong ( Especially InIvyChan
 
January 13, 2011 City Council Workshop
January 13, 2011 City Council WorkshopJanuary 13, 2011 City Council Workshop
January 13, 2011 City Council Workshoppublicinvolvement
 
Shale the revolution that wasn't
Shale the revolution that wasn'tShale the revolution that wasn't
Shale the revolution that wasn'tRichard Chuchla
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Fairfax County
 
Planning of Water Resource Planning Projects
Planning of Water Resource Planning ProjectsPlanning of Water Resource Planning Projects
Planning of Water Resource Planning ProjectsDARSHAN MEHTA
 
C5 council workshop 111128_final
C5 council workshop 111128_finalC5 council workshop 111128_final
C5 council workshop 111128_finalpublicinvolvement
 
Turning the Tide: "Opening Out Towards the Water"– The Big Picture
Turning the Tide: "Opening Out Towards the Water"– The Big PictureTurning the Tide: "Opening Out Towards the Water"– The Big Picture
Turning the Tide: "Opening Out Towards the Water"– The Big PictureCUNY Sustainable Cities
 

Mais procurados (20)

AER 30.8 - Morris
AER 30.8 - MorrisAER 30.8 - Morris
AER 30.8 - Morris
 
Land Reclamation & Coastal Engineering
Land Reclamation & Coastal EngineeringLand Reclamation & Coastal Engineering
Land Reclamation & Coastal Engineering
 
Herring River Restoration Project
Herring River Restoration ProjectHerring River Restoration Project
Herring River Restoration Project
 
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
Gude Landfill Remediation Approach Update, Community Meeting, September 18, 2012
 
Municipal Wetland Initiatives by Frankie Barker
Municipal Wetland Initiatives by Frankie BarkerMunicipal Wetland Initiatives by Frankie Barker
Municipal Wetland Initiatives by Frankie Barker
 
Reclamation presentation 2
Reclamation presentation 2Reclamation presentation 2
Reclamation presentation 2
 
News Release: Commerce Resources Corp. Updates Community Dialogue and Inform...
News Release:  Commerce Resources Corp. Updates Community Dialogue and Inform...News Release:  Commerce Resources Corp. Updates Community Dialogue and Inform...
News Release: Commerce Resources Corp. Updates Community Dialogue and Inform...
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
 
Erosion As Pollution: The net economic and shoreline effects of coastal struc...
Erosion As Pollution: The net economic and shoreline effects of coastal struc...Erosion As Pollution: The net economic and shoreline effects of coastal struc...
Erosion As Pollution: The net economic and shoreline effects of coastal struc...
 
Shoreline Change in Urban Massachusetts, Time for Retreat?
Shoreline Change in Urban Massachusetts, Time for Retreat?Shoreline Change in Urban Massachusetts, Time for Retreat?
Shoreline Change in Urban Massachusetts, Time for Retreat?
 
Land Reclamation In Hong Kong ( Especially In
Land  Reclamation  In  Hong  Kong ( Especially  InLand  Reclamation  In  Hong  Kong ( Especially  In
Land Reclamation In Hong Kong ( Especially In
 
January 13, 2011 City Council Workshop
January 13, 2011 City Council WorkshopJanuary 13, 2011 City Council Workshop
January 13, 2011 City Council Workshop
 
Shale the revolution that wasn't
Shale the revolution that wasn'tShale the revolution that wasn't
Shale the revolution that wasn't
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
 
Planning of Water Resource Planning Projects
Planning of Water Resource Planning ProjectsPlanning of Water Resource Planning Projects
Planning of Water Resource Planning Projects
 
December 6 Public Forum
December 6 Public ForumDecember 6 Public Forum
December 6 Public Forum
 
C5 council workshop 111128_final
C5 council workshop 111128_finalC5 council workshop 111128_final
C5 council workshop 111128_final
 
Team Downtown: Part One
Team Downtown: Part OneTeam Downtown: Part One
Team Downtown: Part One
 
Turning the Tide: "Opening Out Towards the Water"– The Big Picture
Turning the Tide: "Opening Out Towards the Water"– The Big PictureTurning the Tide: "Opening Out Towards the Water"– The Big Picture
Turning the Tide: "Opening Out Towards the Water"– The Big Picture
 

Destaque

Content marketing 2016 conference in Prague by Dominik Grau
Content marketing 2016 conference in Prague by Dominik GrauContent marketing 2016 conference in Prague by Dominik Grau
Content marketing 2016 conference in Prague by Dominik GrauKateřina Borovanská
 
MN Coding Conference 2016 Kurland Talk
MN Coding Conference 2016 Kurland TalkMN Coding Conference 2016 Kurland Talk
MN Coding Conference 2016 Kurland TalkJoe Kurland
 
Feature presentation - Perfect Misparenting
Feature presentation - Perfect MisparentingFeature presentation - Perfect Misparenting
Feature presentation - Perfect MisparentingPrabhat Mandal
 
Acute pancreatitis
Acute pancreatitisAcute pancreatitis
Acute pancreatitisJabeMohammed
 
Deals encash affiliates onboarding
Deals encash affiliates onboardingDeals encash affiliates onboarding
Deals encash affiliates onboardingprakfirm
 
Segunda guerra mundial
Segunda guerra mundialSegunda guerra mundial
Segunda guerra mundialSebastián MV
 
Presentation 2 of 4
Presentation 2 of 4 Presentation 2 of 4
Presentation 2 of 4 Brian Hawkins
 
Plano de negócio franquia GRUPONS
Plano de negócio franquia GRUPONSPlano de negócio franquia GRUPONS
Plano de negócio franquia GRUPONSadmk1
 
ACR Strategies - Increase Church Visitors
ACR Strategies - Increase Church VisitorsACR Strategies - Increase Church Visitors
ACR Strategies - Increase Church VisitorsDon Koehler
 
Panorama mediático en Medio Oriente
Panorama mediático en Medio OrientePanorama mediático en Medio Oriente
Panorama mediático en Medio OrienteAle Palomares Barrios
 
Prometheus: User-Controlled P2P Social Data Management for Socially-aware App...
Prometheus: User-Controlled P2P Social Data Management for Socially-aware App...Prometheus: User-Controlled P2P Social Data Management for Socially-aware App...
Prometheus: User-Controlled P2P Social Data Management for Socially-aware App...Nicolas Kourtellis
 
SMS_White Paper_ClearView Assessment-PUB-v01r00
SMS_White Paper_ClearView Assessment-PUB-v01r00SMS_White Paper_ClearView Assessment-PUB-v01r00
SMS_White Paper_ClearView Assessment-PUB-v01r00Brent Anderson
 
Ana Popovic HE Marketing
Ana Popovic HE MarketingAna Popovic HE Marketing
Ana Popovic HE MarketingAna Popović
 
(11)prospek ukm dalam perdagangan bebas
(11)prospek ukm dalam perdagangan bebas(11)prospek ukm dalam perdagangan bebas
(11)prospek ukm dalam perdagangan bebasElisabeth Marina
 

Destaque (20)

Iczm project blended_education 13.09.2016
Iczm project blended_education 13.09.2016Iczm project blended_education 13.09.2016
Iczm project blended_education 13.09.2016
 
WHAP Ch. 12 Notes
WHAP Ch. 12 NotesWHAP Ch. 12 Notes
WHAP Ch. 12 Notes
 
Content marketing 2016 conference in Prague by Dominik Grau
Content marketing 2016 conference in Prague by Dominik GrauContent marketing 2016 conference in Prague by Dominik Grau
Content marketing 2016 conference in Prague by Dominik Grau
 
사업계획서
사업계획서사업계획서
사업계획서
 
MN Coding Conference 2016 Kurland Talk
MN Coding Conference 2016 Kurland TalkMN Coding Conference 2016 Kurland Talk
MN Coding Conference 2016 Kurland Talk
 
Feature presentation - Perfect Misparenting
Feature presentation - Perfect MisparentingFeature presentation - Perfect Misparenting
Feature presentation - Perfect Misparenting
 
Acute pancreatitis
Acute pancreatitisAcute pancreatitis
Acute pancreatitis
 
Deals encash affiliates onboarding
Deals encash affiliates onboardingDeals encash affiliates onboarding
Deals encash affiliates onboarding
 
Segunda guerra mundial
Segunda guerra mundialSegunda guerra mundial
Segunda guerra mundial
 
Presentation 2 of 4
Presentation 2 of 4 Presentation 2 of 4
Presentation 2 of 4
 
Plano de negócio franquia GRUPONS
Plano de negócio franquia GRUPONSPlano de negócio franquia GRUPONS
Plano de negócio franquia GRUPONS
 
Demo Brain Dev
Demo Brain DevDemo Brain Dev
Demo Brain Dev
 
ACR Strategies - Increase Church Visitors
ACR Strategies - Increase Church VisitorsACR Strategies - Increase Church Visitors
ACR Strategies - Increase Church Visitors
 
Panorama mediático en Medio Oriente
Panorama mediático en Medio OrientePanorama mediático en Medio Oriente
Panorama mediático en Medio Oriente
 
Juha Vainio
Juha VainioJuha Vainio
Juha Vainio
 
Prometheus: User-Controlled P2P Social Data Management for Socially-aware App...
Prometheus: User-Controlled P2P Social Data Management for Socially-aware App...Prometheus: User-Controlled P2P Social Data Management for Socially-aware App...
Prometheus: User-Controlled P2P Social Data Management for Socially-aware App...
 
SMS_White Paper_ClearView Assessment-PUB-v01r00
SMS_White Paper_ClearView Assessment-PUB-v01r00SMS_White Paper_ClearView Assessment-PUB-v01r00
SMS_White Paper_ClearView Assessment-PUB-v01r00
 
Ana Popovic HE Marketing
Ana Popovic HE MarketingAna Popovic HE Marketing
Ana Popovic HE Marketing
 
Final Shiloh
Final ShilohFinal Shiloh
Final Shiloh
 
(11)prospek ukm dalam perdagangan bebas
(11)prospek ukm dalam perdagangan bebas(11)prospek ukm dalam perdagangan bebas
(11)prospek ukm dalam perdagangan bebas
 

Semelhante a Northern Gateway Project: Challenges and Status

Project Engagement Overview Dec 15, 14
Project Engagement Overview Dec 15, 14Project Engagement Overview Dec 15, 14
Project Engagement Overview Dec 15, 14sarahartis
 
Part 490 Presentation
Part 490 PresentationPart 490 Presentation
Part 490 PresentationAmanda Post
 
Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...
Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...
Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...Kevin Perry
 
16-011_TMX Full Report-en_nov2-11-30am
16-011_TMX Full Report-en_nov2-11-30am16-011_TMX Full Report-en_nov2-11-30am
16-011_TMX Full Report-en_nov2-11-30amTony Penikett
 
GGSD 2017 Session 2 - Keynote Presentation by Susanna Fuller
GGSD 2017 Session 2 - Keynote Presentation by Susanna FullerGGSD 2017 Session 2 - Keynote Presentation by Susanna Fuller
GGSD 2017 Session 2 - Keynote Presentation by Susanna FullerOECD Environment
 
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...Graeme Donaldson
 
2013 06 bristol deep sea container terminal - jerry stanford
2013   06 bristol deep sea container terminal - jerry stanford2013   06 bristol deep sea container terminal - jerry stanford
2013 06 bristol deep sea container terminal - jerry stanfordSevernEstuary
 
(2013) Pipeline Politics in the West (2.6 MB)
(2013) Pipeline Politics in the West (2.6 MB)(2013) Pipeline Politics in the West (2.6 MB)
(2013) Pipeline Politics in the West (2.6 MB)K-12 STUDY CANADA
 
Bog Rewetting: A Farmer Discussion
Bog Rewetting: A Farmer DiscussionBog Rewetting: A Farmer Discussion
Bog Rewetting: A Farmer DiscussionIrishFarmers
 
2012 FEPA Presentation: Peter Lidiak
2012 FEPA Presentation: Peter Lidiak2012 FEPA Presentation: Peter Lidiak
2012 FEPA Presentation: Peter LidiakFloridaPipeTalk
 
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...LOWaterkeeper
 
Natural Resources Canada – Carbon Capture & Storage in Canada – Claude Gauvin...
Natural Resources Canada – Carbon Capture & Storage in Canada – Claude Gauvin...Natural Resources Canada – Carbon Capture & Storage in Canada – Claude Gauvin...
Natural Resources Canada – Carbon Capture & Storage in Canada – Claude Gauvin...Global CCS Institute
 
2016 FMA-presentation-Collaborateve FRR Projects (REV8)
2016 FMA-presentation-Collaborateve FRR Projects (REV8)2016 FMA-presentation-Collaborateve FRR Projects (REV8)
2016 FMA-presentation-Collaborateve FRR Projects (REV8)Jason Brabec, PE, CFM
 
2.6 Harbour bridge intro
2.6 Harbour bridge intro2.6 Harbour bridge intro
2.6 Harbour bridge introTaka Geo
 
Michael Moore - Regional Perspectives on CO2-EOR: The US
Michael Moore - Regional Perspectives on CO2-EOR: The USMichael Moore - Regional Perspectives on CO2-EOR: The US
Michael Moore - Regional Perspectives on CO2-EOR: The USGlobal CCS Institute
 
Lake Ontario Waterkeeper submissions: NEB modernization review process
Lake Ontario Waterkeeper submissions:  NEB modernization review processLake Ontario Waterkeeper submissions:  NEB modernization review process
Lake Ontario Waterkeeper submissions: NEB modernization review processLOWaterkeeper
 

Semelhante a Northern Gateway Project: Challenges and Status (20)

Project Engagement Overview Dec 15, 14
Project Engagement Overview Dec 15, 14Project Engagement Overview Dec 15, 14
Project Engagement Overview Dec 15, 14
 
Part 490 Presentation
Part 490 PresentationPart 490 Presentation
Part 490 Presentation
 
Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...
Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...
Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...
 
16-011_TMX Full Report-en_nov2-11-30am
16-011_TMX Full Report-en_nov2-11-30am16-011_TMX Full Report-en_nov2-11-30am
16-011_TMX Full Report-en_nov2-11-30am
 
EPA H2020 SC5 Info Day: Sean Finlay, Director, Geoscience Ireland
 EPA H2020 SC5 Info Day: Sean Finlay, Director, Geoscience Ireland EPA H2020 SC5 Info Day: Sean Finlay, Director, Geoscience Ireland
EPA H2020 SC5 Info Day: Sean Finlay, Director, Geoscience Ireland
 
GGSD 2017 Session 2 - Keynote Presentation by Susanna Fuller
GGSD 2017 Session 2 - Keynote Presentation by Susanna FullerGGSD 2017 Session 2 - Keynote Presentation by Susanna Fuller
GGSD 2017 Session 2 - Keynote Presentation by Susanna Fuller
 
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
USCID conference in San Diego May 17-20, 2016_GrD Salton Sea update presentat...
 
2013 06 bristol deep sea container terminal - jerry stanford
2013   06 bristol deep sea container terminal - jerry stanford2013   06 bristol deep sea container terminal - jerry stanford
2013 06 bristol deep sea container terminal - jerry stanford
 
(2013) Pipeline Politics in the West (2.6 MB)
(2013) Pipeline Politics in the West (2.6 MB)(2013) Pipeline Politics in the West (2.6 MB)
(2013) Pipeline Politics in the West (2.6 MB)
 
Highbank Resources - MDRC Presentation
Highbank Resources - MDRC PresentationHighbank Resources - MDRC Presentation
Highbank Resources - MDRC Presentation
 
Bog Rewetting: A Farmer Discussion
Bog Rewetting: A Farmer DiscussionBog Rewetting: A Farmer Discussion
Bog Rewetting: A Farmer Discussion
 
Main Caribbean Pipeline
Main Caribbean PipelineMain Caribbean Pipeline
Main Caribbean Pipeline
 
Main Caribbean pipeline
Main Caribbean pipelineMain Caribbean pipeline
Main Caribbean pipeline
 
2012 FEPA Presentation: Peter Lidiak
2012 FEPA Presentation: Peter Lidiak2012 FEPA Presentation: Peter Lidiak
2012 FEPA Presentation: Peter Lidiak
 
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
Submission of Lake Ontario Waterkeeper - Reviewing Canadian Nuclear Safety Co...
 
Natural Resources Canada – Carbon Capture & Storage in Canada – Claude Gauvin...
Natural Resources Canada – Carbon Capture & Storage in Canada – Claude Gauvin...Natural Resources Canada – Carbon Capture & Storage in Canada – Claude Gauvin...
Natural Resources Canada – Carbon Capture & Storage in Canada – Claude Gauvin...
 
2016 FMA-presentation-Collaborateve FRR Projects (REV8)
2016 FMA-presentation-Collaborateve FRR Projects (REV8)2016 FMA-presentation-Collaborateve FRR Projects (REV8)
2016 FMA-presentation-Collaborateve FRR Projects (REV8)
 
2.6 Harbour bridge intro
2.6 Harbour bridge intro2.6 Harbour bridge intro
2.6 Harbour bridge intro
 
Michael Moore - Regional Perspectives on CO2-EOR: The US
Michael Moore - Regional Perspectives on CO2-EOR: The USMichael Moore - Regional Perspectives on CO2-EOR: The US
Michael Moore - Regional Perspectives on CO2-EOR: The US
 
Lake Ontario Waterkeeper submissions: NEB modernization review process
Lake Ontario Waterkeeper submissions:  NEB modernization review processLake Ontario Waterkeeper submissions:  NEB modernization review process
Lake Ontario Waterkeeper submissions: NEB modernization review process
 

Northern Gateway Project: Challenges and Status

  • 1. THE NORTHERN GATEWAY PROJECT B Y B R I T TA N Y C H Y Z , A B D U L L A H A L S I N A N , A R M A N D O B O R J A S
  • 2. CONTENTS •Introduction •Project Overview •Timeline & Current Status •Social & Economic Benefits & Challenges •First Nations & Métis Concerns •Other Issues •Environmental Challenges •Terrestrial Wildlife •Marine Wildlife •Aquatic Ecosystems •Pollution •Recommendations •Conclusion 2
  • 3. INTRODUCTION A pipeline that will transfer heavy oil from Alberta to the shores of British Columbia. The capital cost is $7.9 Billion. A collaboration between Enbridge and the Aboriginal Equity Partners (AEP). Find new ways to diversify Canadian oil industry due to the US becoming self-dependent. Build a pipeline with the highest safety and environmental standards. The objective of this presentation is to highlight the main challenges and address the current status of the project. 3
  • 5. PROJECT OVERVIEW  Two parallel lines:  Marine Terminal with 2 tanker berths, 19 storage tanks and can handle 220 ships per year. Line Westbound Eastbound Route Bruderheim,AB to Kitimat, BC Kitimat, BC to Bruderheim,AB Length 1,177 km 1,177 km Diameter 36” 20” Fluid Type Heavy Oil Natural Gas Condensate Volume 525,000 barrels/day 193,000 barrels/day [1] 5
  • 6. TIMELINE & CURRENT STATUS 1998 • Project Feasibility Study and Needs Analysis. 2004 • Formal launch of the Northern Gateway Project. 2005 • Kitimat named as the terminal site. 2006 • Minister of the Environment calls for a Joint Review Panel (JRP). 2008 • The JRP terms of reference, scope of review and process are outlined. 2010 • Northern Gateway Pipeline Project JRP formally established. 2011 • Janet Holder appointed Senior leader of Northern Gateway. 2012 • JRP hearings begin in 17 communities to hear oral and written evidence and expert testimony. 2013 • JRP community hearings concludes closing arguments and statements. 2014 • The government approves the project with 209 conditions. 2014 • Several opposing parties appeal the decision. 2016 • The court dismantled the approval decision due to lack of consultation with First Nations. 62016 • On November 29th, the Federal Gov’t officially rejects the implementation of Northern Gateway Project
  • 8. SOCIAL AND ECONOMIC BENEFITS AND CHALLENGES • Create jobs and inspire economic growth. • Contribute: – $312 Billion to the Canada’s Gross Domestic Product; – $98 Billion in tax revenue; and – $70 Billion in labor. • Will create 2000-3000 jobs during peak construction activities, and 1200 long term positions. [2] [2] 8
  • 9. FIRST NATIONS AND MÉTIS [3] 9
  • 10. FIRST NATIONS AND MÉTIS CONCERNS •Environmental and land use concerns –Fish-bearing water bodies (Fraser River and Skeena River) –Great Bear Rainforest •Inadequate consultation –Federal Court of Appeal overturned the NEB Joint Review Panel’s approval of the project in June 2016. –Enbridge was trying to accommodate the concerns of First Nations and Métis groups. •Financial benefits –Increase in equity (~33%); –Employment. 10
  • 11. OTHER ISSUES • Concerns about impacts to commercial fishing. • Stigma of Oil Sands development. • Public perception of Enbridge. [4] [5] [6] 11
  • 13. ENVIRONMENTAL CHALLENGES •Impacts considered by the NEB Joint Review Panel: –Terrestrial wildlife; –Marine wildlife; –Aquatic ecosystems; and –Pollution. 13
  • 14. TERRESTRIAL WILDLIFE • Woodland Caribou – Right-of-ways cause more predation on caribou • Grizzly Bear • Endangerment [7] [8] 14
  • 15. MARINE WILDLIFE • Killer whale • HumpbackWhale • Tanker traffic and speed • Noise disturbance [9] [10] 15
  • 17. RECOMMENDATIONS • Mitigation plans, as outlined in the Report of the Joint Review Panel: – increased pipeline wall thickness. – decreased distance between isolation valves. – implantation of a leak-detection system. – use of trenchless crossing techniques. – use of tunnels in mountainous terrain to lower slide risk . – improved tanker navigation and use of tug boats to prevent tanker collisions. – surveillance of humpback whales. – establishing a Fisheries Liaison Committee. • NEB found that Northern Gateway’s mitigation procedures were appropriate, and thus recommend the implementation of the project. 18
  • 18. CONCLUSION •A highly complex and controversial project since its early beginnings. •Has been a subject of intense public scrutiny. •It has the potential of creating jobs and diversifying the economy. •However, opposition and environmentalists fear its potential impacts. •Federal government concluded that the project was not in the best interest of communities along the pipeline route. •The Northern Gateway Project has been dismissed. 19
  • 20. PRESENTATION REFERENCES  [1] Northern Gateway. n.d.-d. Project Overview, http://www.gatewayfacts.ca/About-The-Project/Project- Overview.aspx (accessed 25 November 2016).  [2] CAPP. 2016. Crude Oil Forecast, Markets and Transportation, CAPP (June 2016).  [3] Bowles, P.,Veltmeyer H. 2013.Voices of Resistance to Canada’s Enbridge Northern Gateway Pipeline. Global Research, 25 December 2013, http://www.globalresearch.ca/voices-of-resistance-to-canadas-enbridge- northern-gateway-pipeline/5362704 (accessed 22 November 2016).  [4] http://www.fisheries.noaa.gov/stories/2015/09/images/chinooksalmon00.jpg  [5] http://www.pngall.com/wp-content/uploads/2016/04/Fishing-Pole-PNG-Clipart.png  [6] http://www.theontarion.com/wp-content/uploads/2014/11/oil-sands_kris-kr%C3%BCg.jpg  [7] http://www.stantec.com/content/stantec/en/our-work/projects/creative-projects/caribou- monitoring/_jcr_content/promotionalImage.rpath.1200.0.medium.1438958934387.jpg  [8] http://static1.businessinsider.com/image/5499ddee69bedd0b4d8b456a-1200- 924/4765579600_dcd5a2f80f_o.jpg  [9] https://www.wildgratitude.com/wp-content/uploads/2015/06/whale-meaning-whale-symbolism.jpg  [10] https://marinebiologynews.files.wordpress.com/2016/02/8589130579880-orca-underwater-wallpaper- hd.jpg?w=1200  [11] National Energy Board. (2013). Connections: Report of the Joint Review Panel for the Enbridge Northern Gateway Project Volume 1. National Energy Board. Calgary: National Energy Board. Retrieved November 22, 2016, from https://docs.neb-one.gc.ca/ll- eng/llisapi.dll/fetch/2000/90464/90552/384192/620327/624909/2396699/Volume_1_%2D_Connections_%2D _A3S7C4.pdf?nodeid=2395827&vernum=-2  [12] http://assets.inhabitat.com/wp-content/blogs.dir/1/files/2010/09/BP-Stops-Oil-3.jpg  [13] https://i.cbc.ca/1.2774265.1411405819!/fileImage/httpImage/image.png_gen/derivatives/original_620/tanker- graphic.png  [14] http://www.jackmcneary.com/assets/images/Kalamazoo_oil_spill_2010.JPG  [15] https://grist.files.wordpress.com/2012/09/otter-08.jpg 21
  • 21. REPORT REFERENCES • Allan, R. 2012. An Economic Assessment of Northern Gateway (January 2012). • Bowles, P., Veltmeyer H. 2013. Voices of Resistance to Canada’s Enbridge Northern Gateway Pipeline. Global Research, 25 December 2013, http://www.globalresearch.ca/voices-of-resistance-to-canadas-enbridge-northern-gateway-pipeline/5362704 (accessed 22 November 2016). • CAPP. 2016. Crude Oil Forecast, Markets and Transportation, CAPP (June 2016). Carrier Sekani Tribal Council. 2011. Member Nations, http://www.carriersekani.ca/member-nations/ (accessed 26 November 2016). • CBC News. 2012. Northern Gateway pipeline: benefits vs. concerns. CBC News (published online 10 January 2012). http://www.cbc.ca/news/canada/northern-gateway-pipeline-benefits-vs-concerns-1.1135312. Coastal First Nations. 2010. Communities, http://www.coastalfirstnations.ca/communities (accessed 26 November 2016). • Coastal First Nations. 2016. Supreme Court Rules BC Government Must Review Enbridge Northern Gateway Pipeline and Consult with Gitga’at First Nation (Reprint 13 January 2016). http://www.coastalfirstnations.ca/news-release/january-13-2016-119pm. • Coates, K. 2014. First Nations hold the key to the Northern Gateway pipeline. The Globe and Mail (published online 17 June 2014). http://www.theglobeandmail.com/opinion/first-nations-hold-the-key-to-the-northern-gateway-pipeline/article19213035/. • Enbridge Northern Gateway Project Joint Review Panel. 2014. Report of the Joint Review Panel for the Enbridge Northern Gateway Project - Considerations Section 9 (17 January 2014). • Environment Canada. 2012. Recovery Strategy for the Woodland Caribou (Rangifer tarandus caribou), Boreal population, in Canada, Environment Canada, Ottawa, Ontario (2012). • Fausto, J, A Featherstone. 2011. Halton Wasterwater Pumping Station Master Plan Class Environmental Assessment, LGL Limited Environmental Research Associates, Burlington, Ontario (2011). • Government of Canada. 2016. Canadian Environmental Assessment Act, 2012 (S.C. 2012, c. 19, s. 52) (Reprint). http://laws- lois.justice.gc.ca/eng/acts/C-15.21/page-2.html#h-5. • Luggi, D. 2010. Proposed Enbridge pipeline is not worth the risk. Carrier Sekani Tribal Council, http://www.carriersekani.ca/images/docs/enbridge/010710%20MPs.pdf (accessed 26 November 2016). National Energy Board. 2012. The Joint Review Panel, 2 November 2012, http://gatewaypanel.review-examen.gc.ca/clf-nsi/bts/jntrvwpnl-eng.html (accessed 25 November 2016). • National Energy Board. 2012. The Joint Review Process, 18 September 2012, http://gatewaypanel.review-examen.gc.ca/clf-nsi/bts/jntrvwprcss- eng.html (accessed 26 November 2016). • National Energy Board. 2013a. Connections: Report of the Joint Review Panel for the Enbridge Northern Gateway Project Volume 1, National Energy Board, Calgary, Alberta (December 2013). 22
  • 22. • National Energy Board. 2013b. Considerations: Report of the Joint Review Panel for the Enbridge Northern Gateway Project Volume 2, National Energy Board, Calgary, Alberta (December 2013). • National Energy Board. 2014. Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 and Paragraph 104 (4) (b) of the Jobs, Growth and Long-term Prosperity Act, 7 June 2014, http://gatewaypanel.review-examen.gc.ca/clf-nsi/dcmnt/dcsnsttmnt-eng.html (accessed 26 November 2016). • Natural Resources Defense Council. 2011. Submission of the Natural Resources Defense Council to the Enbridge Northern Gateway Project Joint Review Panel: Regarding Underwater Noise Impacts from Northern Gateway Tanker Traffic, Natural Resources Defense Council, Santa Monica, California (22 December 2011). • Nored, M., Tweten, D., Brun, K. 2011. Compressor Station Piping Noise: Noise Mechanisms and Prediction Methods, Gas Machinery Research Council (February 2011). Northern Gateway. n.d.-a. Benefits, http://www.gatewayfacts.ca/Benefits/Jobs-And-Training.aspx (accessed 25 November 2016). Northern Gateway. n.d.-b. First Nations, http://www.gatewayfacts.ca/First-Nations.aspx (accessed 24 November 2016). • Northern Gateway. n.d.-c. The most comprehensively scrutinized pipeline ever, http://www.gatewayfacts.ca/Newsroom/Pipeline-Safety/The-most- comprehensively-scrutinized-pipeline-ever.aspx (accessed 26 November 2016). • Northern Gateway. 2016. Northern Gateway announces it will not appeal recent Federal Court of Appeal decision that reversed project approval (Reprint 20 September 2016). http://www.gatewayfacts.ca/Newsroom/In-the-Media/Northern-Gateway-announces-it-will-not-appeal.aspx. Northern Gateway. n.d.-d. Project Overview, http://www.gatewayfacts.ca/About-The-Project/Project-Overview.aspx (accessed 25 November 2016). Northern Gateway. n.d.-e. Why NGP, http://www.gatewayfacts.ca/About-The-Project/Why-NGP.aspx (accessed 24 November 2016 2016). • Office of the Wet'suwet'en. 2013. Argument of Office of Wet'suwet'en, 13 May 2013, http://www.wetsuweten.com/files/FINAL_ARGUMENT.pdf (downloaded 26 November 2016). Pipe Up Against Enbridge. n.d. List of organizations, http://www.pipeupagainstenbridge.ca/the-movement/organizations (accessed 25 November 2016). • Raincoast Conservation Foundation. 2010. What’s at Stake? The cost of oil on British Columbia’s priceless coast. Raincoast Conservation Foundation. Sidney, British Columbia (2010). • Raincoast Conservation Foundation. 2011. Written Evidence of Raincoast Conservation Foundation, Raincoast Conservation Foundation, Calgary, Alberta (21 December 2011). • Raincoast Conservation Foundation. 2014. Raincoast’s Efforts: Enbridge’s Northern Gateway project and the NEB Hearings, http://www.raincoast.org/enbridge-northern-gateway/ (accessed 25 November 2016). Save the Fraser. 2012. Save the Fraser Declaration, http://savethefraser.ca/Fraser-Declaration-May2013.pdf (accessed 26 November 2016). • Stantec Consulting Ltd. 2013. Parkway West Compressor Station: Environmental Report, Union Gas Limited, Guelph, Ontario (February 2013). • Statistics Canada. 2016. Labour force characteristics, seasonally adjusted, by province (monthly), 4 November 2014, http://www.statcan.gc.ca/tables- tableaux/sum-som/l01/cst01/lfss01c-eng.htm (accessed 24 November 2016). • Sterritt, A. 2012. Enbridge can’t deny islands, Great Bear Rainforest. Vancouver Sun (published online 13 December 2012). http://www.vancouversun.com/technology/Enbridge+deny+islands+Great+Bear+Rainforest/7696467/story.html. 23 REPORT REFERENCES
  • 23. • Tasker, J. 2016a. Trudeau cabinet approves Trans Mountain, Line 3 pipelines, rejects Northern Gateway. CBC News (published online 29 November 2016). http://www.cbc.ca/news/politics/federal-cabinet-trudeau-pipeline-decisions-1.3872828. • Tasker, J. 2016b. Liberals decide fate of Northern Gateway pipeline, but won't announce until next week. CBC News (published online 25 November 2016). http://www.cbc.ca/news/politics/northern-gateway-final-decision-friday-1.3865627. • Tera Environmental Consultants. 2014. Environmental Impact Study of Core Area Wastewater Treatment Program Facilities: Terrestrial Environment, Capital Regional District, Calgary, Alberta (March 2014). • The Associated Press. 2015. Enbridge settles with Michigan over 2010 Kalamazoo oil spill. CBC News (published online 13 May 2015). http://www.cbc.ca/news/business/enbridge-settles-with-michigan-over-2010-kalamazoo-oil-spill-1.3072149. • Vernon, C. 2013. What Part of 'No' Does Enbridge Not Understand. The Huffington Post (published online 28 June 2013). http://www.huffingtonpost.ca/caitlyn-vernon/enbridge-northern-gateway-no_b_3514309.html. • Yinka Dene Alliance. 2014. Rejection of the Enbridge Northern Gateway Project, 8 December 2014. http://yinkadene.ca/images/uploads/2014-12-08_YDA_to_Premier_Prentice.pdf (accessed 26 November 2016). 24 REPORT REFERENCES