16. Different – Disciplines Vs. Business Models Project Entity Virtual Oganization C C C C Owner Designer Constructor Project D D D D C C C C Owner Designer Constructor Project D D D D
29. Systems Benchmarking - Informing a budget BUILDING SYSTEMS COST DATA / COST RANGES $/SF COMMENTS Type 1 Type 2 Fire Protection 15/sf to 21/sf 4/sf to 8/sf Increased density of rooms and full height walls drive up number of heads. Seismic bracing requirements. Mechanical 125/sf to 175/sf 30/sf to 60/sf Increased number of zones because of patient care requirements. Increased air changes drives larger HVAC units, increased filtering & controls. Stricter exiting and occupancy requirements increase fire smoke dampers quantity and ductwork routing. Plumbing 70/sf to 90/sf 10/sf to 18/sf Certified med gas system is required through out the hospital. Hospitals have 1 fixture per 350sf vs 1 fixture per 1500sf for an office Electrical 125/sf to 150/sf 30/sf to 45/sf Electrical power system separated into 3 systems, normal, emergency & equipment this triples the distribution cost. IT cabling requirements increased to support patient information requirements. Increased number of electrical system make coordination and installation more difficult. b
33. Open Book - Supports continuous confirmation Spend as little as possible The project can not go like the last one Were going to shop this around I want this to be my gift to the city Let’s invest in doing things once and right We want no one else to be able to do this
34.
35.
36.
37.
38.
39.
40.
41.
42. Shared Risk/Reward Guaranteed At Risk Corporate Overhead Profit Limb 2 Limb 3 Pain Gain 0 Direct Project Costs Project- specific Overhead Limb 1 $
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
Notas do Editor
IPD Definition Task Group sTUART
IPD Definition Task Group S
IPD Definition Task Group S
IPD Definition Task Group J J will show Sketchup graphic here