ASSIGNMENT COVER PAGE



SURNAME: Brinkmann                                                INITIALS: A

STUDENT NUMBER: 17573602

TELEPHONE NUMBER: 0828900663

PROGRAMME NAME: EDP 2012

MODULE: Financial Strategies

FACILITATOR: Prof Dave Flynn

DUE DATE: 25 September 2012

NUMBER OF PAGES: 39



CERTIFICATION
I certify the content of the assignment to be my own and original work and that all sources have been
accurately reported and acknowledged, and that this document has not previously been submitted in
its entirety or in part at any educational establishment.




_________________________
SIGNATURE

OR
6701130018085
_________________________
ID number for assignments submitted via e-mail


                                                                   FOR OFFICE USE
                                                    DATE RECEIVED:
REPORT AND RECOMMENDATIONS


     PREPARED FOR CONSIDERATION BY THE EXECUTIVE MANAGEMENT COMMITTEE:
                      WESTERN CAPE DEPARTMENT OF HEALTH
                                   [WCDOH]


                               25 SEPTEMBER 2012


  IMPROVING FINANCIAL EFFICIENCIES, SERVICE DELIVERY AND PATIENT-CENTRICITY BY
  CONSIDERING ALTERNATIVE FINANCE STRATEGIES, CAPITAL STRUCTURE POLICY, GREEN
           PROCUREMENT POLICY AND TRIPLE-BOTTOM LINE PARTNERSHIPS


AN ANALYSIS OF THE RISKS AND REWARDS OF INNOVATING TO STRETCH THE HEALTH RAND




                                 PREPARED BY:


                             AMANDA BRINKMANN
          ADVISER TO THE MINISTER OF HEALTH: WESTERN CAPE GOVERNMENT
          HEAD OF STRATEGIC PARTNERSHIPS: WESTERN CAPE GOVERNMENT




2|Page
TABLE OF CONTENT

  1.   Executive Summary

  1.1 Agreement, Implications and Considerations

  1.2 Decisions Required

  1.3 Acknowledgements

  2. Problem Statement

  3. Objectives

  4. Methodology and Approach

  5. Existing Financial Strategy, Procurement Policy and Operational Realities: WCDOH

  6. Finance Strategy and Procurement Policy Alternatives and Opportunities: Discussion

  6.1 Zero-based and Activity-based Budgeting

  6.2 Finance Decisions and Optimal Capital Structure

  6.2.1   Gearing or Leverage

  6.2.2   Financial Instruments

  6.2.3   Establishing the full value of assets

  6.3 Upfront purchase of Maintenance Contracts

  6.4 Green Procurement

  7. Operating Lease

  7.1 General Advantages of an Operating Lease

  7.2 Key Benefits of Operating Leasing to WCDOH

  7.2.1   Financial Evaluation and Benefits of Operating Leasing

  7.2.2   Proposed Structure of Operating Leasing Agreements

  7.2.3   Cost Reductions, Benefits, Savings: Accruing to WCDOH

  8.   Conclusions

  9. Recommendations

  10. References

  11. Glossary of Terms and Annexures



3|Page
1. EXECUTIVE SUMMARY

   This document summarises the potential risks and rewards to the WCDOH, of procuring high-
   value assets by using operating leases instead of by way of once-off cash procurement as is
   currently standard policy. Alternative finance strategies and procurement policy is proposed
   for consideration, including the incorporation of Green Procurement policy. Operating leasing
   is situated within the context of the range of provincial objectives and includes considerations
   of Extended Producer Responsibility, Life-cycle costing and usage analysis and eventual
   disposal management.

   The report furthermore deals with Corporate Social Investment [CSI], Triple Bottom Line
   strategic partnerships as an extension to this procurement option and the potential added
   value that could accrue to the WCDOH, its employees and patients, over time.

   1.1     Agreements, implications and considerations
   1.1.1   An asset/equipment backlog exists generally within the WCDOH, but specifically at the
           three [3] Tertiary, Central Hospitals: Groote Schuur Hospital, Tygerberg Hospital and
           Red Cross Hospital.
   1.1.2   Some, or all, of the facilities managed by the WCDOH have a shortage of equipment
           and/or ageing or obsolete equipment that need to be upgraded or replaced.
   1.1.3   There are real costs, financial and non-financial, associated with the lack of necessary
           equipment in certain facilities.
   1.1.4   The budget allocated by Treasury to the WCDOH is currently not sufficient to meet
           the annual equipment demands of all facilities, and by inference, insufficient to reduce
           and/or eliminate the existing backlog. [ Annexure C. Botha, T. 26 March 2012]
   1.1.5   Strategic Partnerships, efficiency, innovation, stretching the healthcare rand and
           patient-centricity are all at the very heart of achieving the objectives of the WCDOH.
           [ Annexure C. Botha, T. 26 March 2012]
   1.1.6   The WCDOH only wishes to consider operating leases and NOT finance leases.
   1.1.7   Possible assets which could be leased, if this route were followed, would be limited to:
           a) High-value, high redundancy, high maintenance, high technology assets, required
              at the three Central [Tertiary, Educational] Hospitals and other facilities
           b) Transversal IT systems of hardware and or networks or systems which would
              support the WCDOH Information Management data capabilities.
   1.1.8   The process must adhere to all of the relevant regulatory frameworks and the
           WCDOH‟s existing procurement process must be enhanced.
   1.1.9   The “Essential Equipment List” for Central, Regional and District Hospitals and clinics
           is also considered, as well as the transversal IT requirements. This would imply that
           such asset planning should extend beyond the Medium Term Expenditure Framework
           [MTEF].[ www-personal.umich.edu]




4|Page
1.2        DECISIONS REQUIRED
       1.2.1   Principle agreement to pursue alternative finance strategy, procurement policy and
               operating leasing along with triple bottom line partnerships within WCDOH.
       1.2.2   Principle agreement to allow for individualized projects and case studies to be
               conducted, under empirical conditions and within regulatory and policy frameworks,
               so as to evaluate the qualitative, quantitative, tangible as well as intangible benefits of
               operating leasing and alternative finance and procurement strategy over time.
    1.3        ACKNOWLEDGEMENTS
This document is the culmination of a year-long investigative process that has involved
interrogation of data, research, interviews, robust debates, lobbying and hard work, dedication
and passion from a great many people. In no specific order, I wish to acknowledge the following
people:
        Minister of Health, Mr Theuns Botha and Head of Department: WCDOH, Prof Househam,
         for having the vision and foresight to provide the mandate for the exploratory process.
        Mr Mike Loverock: Independent Financial Analyst – for assisting with the creation of the
         financial models and scenarios.
        Mr Isaac Smith: Head of Procurement: WCDOH – for bringing his experience, knowledge,
         skills and wisdom to bear whenever required.
        Messrs Van Niekerk, Jooste and Manning: Financial Management team: WCDOH – for their
         openness to engage with new, innovative and different ideas and concepts.
        Manufacturers and suppliers of medical and other high technology equipment – for their
         inputs regarding mechanisms that would add value to the procurement and life-cycle of
         assets.
        Various officials, managers, role players and staff within Level 2 and 3 health facilities as
         well as senior officials and management within WCDOH Head Office, too many to mention
         by name - for their input in terms of desirability, feasibility and viability.
The intent remains for this to be a living document as we move towards becoming the Learning
Organisation [Liao, S. H., Chang, W. J., Wu, C. C., & Katrichis, J. M. 2011]. The hope is to arrive at
a policy solution which would deliver against the range of objectives of the WCDOH, whilst
mitigating any potential future financial and environmental risks. The report and recommendations
if adopted in its entirety will lead to the more effective use of capital, reduction in costs and
increases in available budget or free cash flow to WCDOH.


AMANDA BRINKMANN




Special Adviser to the Minister of Health & Leader of Government Business
HOD: Strategic Partnerships: Western Cape Government




5|Page
2. PROBLEM STATEMENT


    2.1    An asset/equipment backlog exists generally within the WCDOH, but specifically at the
           three Tertiary, Central Hospitals.

    2.2    Some, or all, of the facilities managed by the WCDOH have a shortage of equipment
           and/or ageing or obsolete equipment that need to be upgraded or replaced.

    2.3    There is particular need, as evidenced by the attached proposal titled: Strengthening
           of the Surgical Platform: Western Cape Department of Health. [Brinkmann, A.
           November 2011] for surgical theatres, suites and training facilities to be upgraded.

    2.4    There are real costs, financial and non-financial, associated with the lack of necessary
           equipment or the presence of ageing, inefficient, sub-optimal equipment in certain
           facilities.

    2.5    The budget allocated by Treasury to the WCDOH is currently not sufficient to meet the
           annual equipment demands from all facilities, and by inference, insufficient to reduce
           and/or eliminate the existing backlog. [ Annexure C. Botha, T. 26 March 2012]

    2.6    National Treasury has issued a notice indicating a tightening of the budgetary
           envelope. The estimated time horizon is anticipated to be three to five years. [National
           Treasury Department: South Africa. August 2012]

    2.7    Notwithstanding the above, negative impact on service delivery is not an option as is
           evidenced by the Strategic Objective Four of the WCDOH as set out within the Annual
           Performance Plan 2012/13[Annexure D: Western Cape Department of Health. March
           2012] as well as with the spirit, content and objectives of Vision 2020 [Annexure B:
           WCDOH. November 2011]. This is reiterated within the content of the WCDOH Budget
           Speech 2012. [Annexure C. Botha, T. 26 March 2012]

    2.8    There is an acute shortage of doctors and nurses in South Africa and Minister Aaron
           Motsoaledi, National Minster of Health, has committed to the training of additional
           clinical staff and the upgrade of facilities [Child, K. 11 Oct 2011].

   3. OBJECTIVES

Through innovation in financial, procurement and strategic partnership strategies and policies,
within severe budgetary constraints, ensure improved delivery of the various strategic objectives
and service delivery outcomes of WCDOH as well as those of the Western Cape Government
[WCG] as a whole, without compromising either the present or future delivery of such services.




6|Page
4. METHODOLOGY AND APPROACH

    4.1    The existing capital structure [Flynn, D.2009. Chapter 13-3] and capital budgeting
           structure [Flynn, D. 2009. Chapter 14-3] of WCDOH was interrogated and evaluated in
           respect of efficiency and effectiveness.

    4.2    The Five Principles of Financial Viability [Flynn, D. EDP 2012. Slide 26] were borne in
           mind, adjusted for governmental circumstances.

    4.3    The existing „Essential Equipment List‟ was assessed against what is required in reality
           and adapted accordingly.

    4.4    The benefits of new assets as well as replacement assets have been sufficiently
           quantified for comparison against the opportunity cost of incurring finance costs.

    4.5    Various pieces of legislation, policies, regulations, practice notes, strategies and plans,
           as referenced within and annexed to this report were interrogated and reviewed.

   5. EXISTING FINANCIAL STRATEGY, PROCUREMENT POLICY and OPERATIONAL
       REALITIES: WCDOH

In summary, WCDOH currently employs the following financial strategies and policies:

    5.1    Historic, Incremental Budgeting or Capped Budgeting

    5.2    Working Capital Structure allows for the purchase of fixed assets mainly via outright
           cash purchase

    5.3    Valuation and Value are not quantified on the principles of risk and return in finance

    5.4    Useful life of assets and operational maintenance are not adequately planned and
           budgeted for

    5.5    Budget priorities are not necessarily reflective of changing service delivery needs and
           requirements

   6. FINANCE STRATEGY AND PROCUREMENT POLICY ALTERNATIVES and
       OPPORTUNIES: DISCUSSION

    6.1    ZERO-BASED & ACTIVITY BASED BUDGETING

A hybridized version of a zero-based and activity based budgeting approach would allow for the
budget to be built around what is needed to deliver on the objectives of WCDOH.

    6.2    FINANCE DECISIONS AND OPTIMAL CAPITAL STRUCTURES

     6.2.1 Gearing or Leverage

An optimal capital structure strikes a delicate balance between cash funding and funding from
debt. An element of gearing or leverage, at a moderate level, could have the ability of bringing



7|Page
future procurement into the present. Long-term assets should ideally be procured via long-term
finance. Benefits and use are realized over time. [Flynn, D. 2009]

     6.2.2 Financial instruments

Operational Leasing could fast-track the procurement of high technology, high maintenance, high
redundancy and high value equipment. Innovative contractual agreements between WCDOH,
Lessors and suppliers of assets could provide considerable added value.

     6.2.3 Establishing the full value of assets

New techniques to establish the value of assets should be agreed based on the principles of risk
and return in finance.

    6.3      UPFRONT PURCHASE OF MAINTENANCE CONTRACTS

WCDOH could purchase maintenance contracts up-front. This could lead to savings of up to 25%.
[Lipsitz, N. 6 October 2011]

    6.4      GREEN PROCUREMENT

The White Paper on Greening the Procurement of Goods and Services within the Western Cape
Government [The Department of Environmental Affairs and Development Planning: Western Cape
Government. 21 June 2011] provides as follows:

     6.4.1   Life-cycle analysis, costing, planning, sustainability and resource efficiency so as to
             prolong the useful life of assets and re-use as long as possible.

   7. OPERATING LEASE
In general, leasing is based on the concept that for the purpose of production / service delivery,
the determining factor is not the ownership of the assets to be acquired, but rather their
availability for use. [National Treasury.1 April 2000]

    7.1      GENERAL ADVANTAGES OF AN OPERATING LEASE

     7.1.1   Creating free cash flows within a budgetary constrained environment
     7.1.2   Spreading the Cost by initially paying for use, thereby matching the costs of an asset
             against the asset‟s future economic service potential
     7.1.3   Complete Finance
     7.1.4   Flexibility to add to or upgrade the asset base when required
     7.1.5   Vendor Independence
     7.1.6   Acceleration of service delivery projects via gearing
     7.1.7   Transparency in contracting which improves governance
     [www.fao.org. Accessed August 2012]




8|Page
7.2    KEY BENEFITS OF OPERATING LEASING TO WCDOH

     7.2.1 FINANCIAL EVALUATION and BENEFITS OF OPERATING LEASING

Annexure F: TABLE ONE: OPERATING LEASING BENCHMARK SCENARIO MODEL REFERS

The financial model was built on the following assumptions:
      WCDOH CAPEX budget for equipment is set at R200 million per annum.
      Budget growth: 5% per fiscal, which effectively neutralises inflation.
      Of the R200 million 2011/2012 budget, 50% [R100 million] is allocated to the procurement
       of high value assets.
      WCDOH determines to acquire equipment to the value of R75 million via operating leasing
       and the balance of R25 million via outright cash purchase.
      The equipment identified as appropriate for rental has an estimated minimum useful life
       of seven years. To ensure the highest level of healthcare delivery, such equipment will
       be replaced at the end of year five, but will continue in use at a separate / tier
       two facility for its remaining economic life.
      All rates used in the cash flow evaluation are at market rates as at April 2011.

Western Cape - Department of Health

Capital Expenditure Budget 2011 – 2016
Annual increase 5%                                                                  2011/2012
1. Allocation for low-value equipment and other assets                             100 000 000
2. Allocation for big-ticket assets *                                              100 000 000
Budgeted Expenditure                                                               200 000 000



Cash Flows
Annual Budget                   2011/2012                                          100 000 000
                                Cumulative                                               0
Rental Cash Flows               2011/2012                                         (17 601 918)
                                Cumulative                                               0
Cash Differential                                         Current Year              82 398 082
                                                           Cumulative                     0
Less: (assets not rented)                                 Current Year            (25 000 000)

Available Cash:                                           Current Year             57 398 082

                                                              Cumulative            82 398 082




9|Page
The table and its summary above are interpreted as follows:
        7.2.1.1 From the rental cash flow in 2011/2012 costs of only R17.6 million is incurred.
        7.2.1.2 This creates a potential for gearing, at an applied factor of 4.5 (75 million / 17.6
                   million.
        7.2.1.3 This form of acceleration may be imprudent on an annual basis, because of the
                   cumulative effect of rental payments on succeeding years‟ budgets.
        7.2.1.4 Acceleration in the 2011/2012 and again in the 2014/2015 budget years have been
                   assumed, with the cash flow effects thereof running through until the 2018/2019
                   budget year.
        7.2.1.5 Consistent with the analysis for the 2011/2012 year, a surplus cash position of
                   approximately R50 million is reflected for the 2014/2015 year, which in turn
                   creates the ability for WCDOH to once more accelerate the procurement of
                   equipment.
        7.2.1.6 A financing strategy of this nature could be regarded as a moderate approach to
                   asset procurement, within which there are countless permutations.
        7.2.1.7 A vital component in the strategic decision-making process in general, but
                   specifically in this regard, is the potential cost savings that accrue to the WCDOH.


        7.2.2 PROPOSED STRUCTURE OF OPERATING LEASING AGREEMENTS

        The Lessor [who is vendor-independent] will purchase the assets from the supplier/s
         selected by WCDOH at the best possible price, and
        The Lessor will negotiate a discounted up-front maintenance/service contract,
        The Lessor will include Extended Producer Responsibility into the contract,
        The Lessor and Vendor agree to redeploy assets into lower-tier health facilities at their
         cost, which costs shall include transport, installation, full maintenance and training of
         clinical staff, where relevant
        The Lessor will lease such assets to WCDOH at a fixed rate and over an agreed term, and
        The Lessor, through a separate corporate social investment agreement with The Health
         Foundation, donates leased assets to the WCDOH, at the end of the agreed lease period.




10 | P a g e
7.2.3 COST REDUCTIONS, BENEFITS, SAVINGS: ACCRUING TO WCDOH

From a purely [and very limited] financial perspective, I would suggest that the acid test here is to
obtain comfort that the cost savings and benefits that accrue, at least exceed the costs of finance.
       7.2.3.1 Ability to purchase up to four times more equipment by gearing moderately in
                  specific budgetary period
       7.2.3.2 Creating free cash flows within the specific period so as to assist with service
                  delivery within financially constrained circumstances
       7.2.3.3 By having state-of-the-art equipment at teaching hospitals, the ability to attract,
                  train and retain the best possible clinical talent in the province and country
       7.2.3.4 By upgrading the surgical platform alone, it is anticipated that vast savings in
                  respect of patient experience, recovery, reduction in bed days, post-operative
                  morbidity and mortality would be achieved
       7.2.3.5 The value of bringing future delivery into the present via sound finance and
                  procurement policies
       7.2.3.6 Over time, replace obsolete and ageing equipment with sustainable, energy-efficient
                  assets
       7.2.3.7 Inclusion of Extended Producer Responsibility into contractual agreements ensures
                  that the useful life the asset is extended as far as possible and that the cost of
                  disposal is vested in the producer
       7.2.3.8 By planning for the acquisition of assets over the MTEF, a five, seven and ten year
                  horizon can be constructed; planning for the redeployment of assets to lower-
                  tiered facilities could be included into such planning
       7.2.3.9 The cost of relocation, installation and training of staff related to assets will be
                  borne by the producer
       7.2.3.10 Lower-tiered facilities will, over time, be able to diagnose and treat patients in situ,
                  thereby improving prognosis and overall patient outcomes, potentially saving the
                  health system considerable costs attached the late detection and treatment of
                  certain conditions
       7.2.3.11 Savings related to the reduction in the maintenance division and budget of the
                  WCDOH over time as well as savings related to the up-front procurement of
                  maintenance contract, acting to mitigate finance costs over the term
       7.2.3.12 Savings in transport of patients via Health Net – fuel, driver, support staff salaries
                  and consumables used en route
       7.2.3.13 Hospitalisation costs at the facility to which the patients would have been taken,
                  which may include more bed days than would otherwise have been necessary
       7.2.3.14 Savings in loss of man days [ and the costs thereof] related to providing at
                  treatment at facilities that are remote from the patient‟s home
       7.2.3.15 General improvement of the patient experience and a complete move towards the
                  stated goal of patient-centricity by equipping the health network with improved
                  capacity and diagnostic abilities closer to where the patient is
       7.2.3.16 Demand management, Disposal Management, Extended Producer Responsibility,
                  Full-life cycle assessment, costing and planning and contractual innovations
                  would optimize capital expenditure and asset acquisition
       7.2.3.17 Improved staff morale and motivation over time




11 | P a g e
8. CONCLUSIONS

     8.1       The existing planning, finance strategy and procurement policies within WCDOH are
               not optimised to deliver against the changing service delivery needs of patients as well
               as clinicians.
     8.2       The very constrained budgetary environment necessitates looking at new and
               innovative capital and finance structuring methodologies.
     8.3       To achieve societal outcomes, there is a shift towards partnering via the sustainability
               platform as is evidenced by the findings attached to the establishment of The Health
               Foundation [ Ernst & Young. 9 February 2012. Annexure A] as well as the outcomes of
               the UN Global Compact/Accenture CEO survey[Lacy, P; Cooper, T; Hayward, R;
               Neuberger, L. June 2010].
     8.4       Green procurement policy and principles provide significant additional opportunities to
               save costs and improve efficiencies. [DEADP. 21 June 2011]
     8.5       There is a compelling case to be made for the use of Operating Leasing and the
               proposed contractual structure so as to accelerate service delivery and reduce the
               existing equipment/asset backlog.
     8.6       Such policy has the potential to benefit other departments within WCGOV. Department
               of Education and the acquisition and renewal of ICT infrastructure spring to mind.
     8.7       The proposed gearing factor of 4.5 could in essence accelerate asset procurement by
               more than 100% every 3 years.
     8.8       By implementing a prudent and moderate operating leasing procurement strategy,
               significant long term savings and benefits could accrue to the WCDOH, its patients and
               employees.

     8.9       The proposed upgrade of the Surgical Platform in the province, with further reference
               to the acquisition of equipment and training in Laparoscopy or Minimally Invasive
               Surgeries [Heisler, J. January 2012.] could lead to significant cost-savings to the health
               system as well as improved patient outcomes. This is evidenced by the outcomes of a
               range of global studies.[Braga, M. et al. Dec 2005]; [Rodriguez, A et al. January
               2011.];[Maslekar, S. et al.March 2007.]; [Roumm, AR. Pizzi, L et al. March 2009.];
               [Goldsmith, H. Herman, L. January 2002.]

     8.10      It goes without saying that any form of funding [bond, loan, finance lease, operating
               lease] carries a financing cost. The WCDOH budget, which is allocated from Treasury,
               of course does not carry such a cost, at least not to the WCDOH.

     8.11      If the only analysis undertaken is to compare the allocated cash [per the WCDOH
               budget] to any form of debt financing, and the end objective of the analysis is the




12 | P a g e
quantum of assets that can be acquired over time, by definition cash will always
               prevail, by virtue of the financing costs of debt.

     8.12      Additional assets made possible through the use of alternate finance strategies, whilst
               not generating income, could have a material impact on reducing costs.

     8.13      Examples of these costs are dealt with in the main document, and should be identified
               within the operating budget, and quantified. These could correctly be considered hard
               cash savings that accrue to the WCDOH, and a tangible benefit.

     8.14      A meaningful and correct analysis in comparing a cash purchase to an operating lease
               solution is then to include a line in the budget in which these cost savings are
               recorded.

     8.15      Properly managed financing costs can be seen as the price that the WCDOH pays for
               the ability to bring the procurement of essential medical equipment from future years
               into the now. Coupled to this ability, is the concomitant reduction in associated
               expenses.

     8.16      We have to shy away from a purely rands and cents analysis when considering the
               cost benefits of employing a moderate operating leasing strategy.

     8.17      Whilst an operational lease is subject to compound interest over the lease period, this
               cost should ideally be weighed up against the short-to mid-term benefits as described
               within this report.
     8.18      Although difficult, it would be useful to compare the full, actual cost of assets procured
               by cash over the complete useful life of the asset.

     8.19      Assets are generally „sweated‟ for as long as possible, but the cost of running an
               operational maintenance unit is not factored in, accounted or budgeted for adequately.
               [Gartner Group. 2003]. The complete cost of ownership of state assets is therefore
               not known.

     8.20      The proposed new standard for leases moves away from the current „risk and returns‟
               basis to a „right of use‟ basis. This adjustment would make accounting for leases
               more congruent with the Conceptual Framework for Financial Reporting 2010, as
               drafted by the International Accounting Standard Board. [IASB.2010]
     8.21      By continuing on a „ business-as-usual‟ path, the backlogs in equipment will not be
               addressed and this would have material impact on the ability of WCDOH to achieve its
               strategic objectives.




13 | P a g e
9. RECOMMENDATIONS

Given the constrained budgetary environment, the range of strategic objectives as iterated by the
WCDOH as well as Western Cape Government in general and the need to innovate so as to stretch
the health rand, the following recommendations are made for consideration by the Committee:
     9.1       Zero-based and activity based budgeting to establish the real needs as required to
               deliver against the objectives of WCDOH, specifically as those deliverables would up
               operational efficiences, save costs in the longer term, improve quality and access to
               services and be focused entirely on patient-centricity.
     9.2       Based on the latter activity, develop a phased, rolling 10-year asset procurement plan,
               that would seek to address the most immediate priorities over time.
     9.3       These priorities would, in the main, be related to high technology, high redundancy,
               high maintenance and high value assets. This should include ICT and management
               information infrastructure.
     9.4       Explicit rules need to be established which define the potential assets which would be
               considered.
     9.5       Key priority requirements should be projectised.
     9.6       Such projects and case studies would be decided based on the necessity of the
               procurement of such equipment so that such procurement aligns with delivery of the
               Strategic Objective Four [ 4] of the WCDOH as set out within the Annual Performance
               Plan 2012/13[Annexure D:Western Cape Department of Health. March 2012] as well as
               with the spirit, content and objectives of Vision 2020 [Annexure B: WCDOH. November
               2011]. Such projects would furthermore be guided by the content, intent and spirit of
               the WCDOH Budget Speech 2012. [ Annexure C. Botha, T. 26 March 2012]
     9.7       Certain projects, such as for instance the upgrading of the Surgical Platform in the
               province, could be managed by the Strategic Partnerships portfolio in collaboration
               with The Health Foundation. This recommendation is based upon the fact that a
               significant number of suppliers, manufacturers and donor partners have already
               indicated their support for such a project. The balance of funds which are not
               secured via such partnerships and donations could be financed by WCDOH.
     9.8       Operating Leasing, used in a moderate and pragmatic manner should be adopted as
               part of the WCDOH‟s finance and procurement policy and strategy.
     9.9       The proposed structure of the Operating Leasing agreement, as proposed within this
               report should be adopted and all contracts negotiated on this basis so that the full
               added value benefits to WCDOH and its patients are realised over time.
     9.10      The benefits of new as well as replacement assets must be quantified in order to
               assess this cost against the opportunity cost of incurring finance costs.




14 | P a g e
9.11      Factors, including: Net Present Value calculation should include, amongst others: *
               Value of the asset * Funds being paid * Maintenance costs * Administration costs*
               Potential staffing costs * Disposal value/cost of asset used * Environmental costs*
               Input materials and resources required to operate the asset * Capital cost of the
               asset* Positive cash flows that the asset is expected to generate, net of financing costs
               *Changes to working capital requirements
     9.12      Other than cash flows as basis for the valuation technique, other factors, such as the
               capacity to influence existing and future service delivery, capacity to influence future
               cash flows, capacity to generate present and future benefits, rewards or savings,
               timing of cash flows and impact of the investment on the business operations should
               be taken into consideration. WCDOH must appropriately evaluate whether the
               benefits of ownership of equipment or assets in the present, seem to be greater than
               the wealth foregone, expressed as the price. We should establish whether the total
               exchange price is in reality lower than the value or worth of the asset to WCDOH.
     9.13      Accounting for leases must be congruent with the Conceptual Framework for Financial
               Reporting 2010, as drafted by the International Accounting Standard Board [IASB] as
               well as Finance Instruction G22/2009. [Jooste, J. 27 March 2009]
     9.14      Finally, it is my assessment, based on all of the information gathered, assessed,
               interrogated and discussed over the past year, subject to internal compliance issues
               being satisfied, that an Operating Lease methodology as proposed within this report
               can generate compelling and very real benefits to the WCDOH and should therefor
               form part of the overal finance, procurement and funding strategy.
     9.15      In general, the Finance, Investment and Capital structures of WCDOH should be
               reviewed so as to be in more in keeping with the delivery of the strategic objectives of
               the Western Cape Government, The Western Cape Department of Health and with the
               changing service delivery and business landscapes.
The report and recommendations if adopted in its entirety will lead to the more effective use of
capital, reduction in costs and increases in available budget or free cash flow to WCDOH.




15 | P a g e
10. REFERENCES: FINANCIAL STRATEGIES REPORT AND RECOMMENDATIONS

Botha, T. 26 March 2012. Western Cape Health Budget Speech 2012 by Mr Theuns Botha,
Minister of Health at Western Cape Provincial Legislature

Braga,M.et al. December 2005. Laparoscopic versus open colorectal surgery: cost-benefit analysis
in a single center randomized trial.

Campbell, R. H. 2012. http://financial-dictionary.thefreedictionary.com/Finance+Lease. Define:
Financial Lease. Accessed August 2012

Child, K. 11 Oct 2011. Health Minister promises more doctors and nurses. www.mg.co.za.
Accessed September 2012

Enterprise Financial Solutions. 2012. Definition of Operating Lease

Ernst & Young. 9 February 2012. The Health Foundation: The Journey Thus Far. Presentation
format.

Flood, R.1999. Rethinking the Fifth Discipline: Learning from the Unknowable.

Flynn, D. EDP 2012. Financial Strategies Presentation document.

Flynn, D. 2009. Understanding Finance & Accounting. Chapter 6. Pg 27. 6. Non-financial issues in
analysis; 6.1 The Balanced Scorecard

Gartner Group. 2003. Total Cost of Ownership model.

Goldsmith, H. Herman, L. January 2002. Endoluminal gastroplication. A new therapeutic
endoscopic procedure for gastro-esophageal reflux disease.

Heisler, J. January 2012. Definition of Laparoscopic Surgery. About.com Guide. Accessed August
2012

http://www.businessdictionary.com/definition/positive-cash-flow.html. Define: Positive Cash
Flows. Accessed September 2012

http://www.fao.org/docrep/W4343E/w4343e08.htm. Basic Finance for Marketers. Advantages of
Operating Leases. Accessed August 2012.



http://www.investopedia.com/terms/n/npv.asp. Define: Net Present Value [NPV]. Accessed
August 2012.

http://www.investopedia.com/terms/o/operatinglease.asp. Define: Operating Lease. Accessed
August 2012.




16 | P a g e
http://www-personal.umich.edu/~alandear/glossary/m.html#mtef2. Definition: Medium Term
Expenditure Framework [MTEF]. Accessed September 2012

International Accounting Standards Board [IASB]. 2010. The Conceptual Framework for Financial
Reporting. www.ifrs.org. Accessed August 2012

Jooste, J.M. March 2009. Finance Instruction G22/2009. Classification of Lease Agreements in the
Standard Chart of Accounts as well as the Reporting on Lease commitments at the end of each
financial year.

Lacy, P; Cooper, T; Hayward, R; Neuberger, L. June 2010. A New Era of Sustainability. UN
Global Compact Accenture CEO Survey study 2010. ; CEO reflections on progress to date,
challenges ahead and the impact of the journey toward a sustainable economy.

Liau, S.H.,Chang, W.J., Wu, C.C. & Katrichis, J.M. 2011. A survey of market orientation.

Lipsitz, N. 6 October 2011. CT Tender: Savings on upfront maintenance contracts: Siemens and
City of Cape Town

Maslekar, S. et al. March 2007. Cost analysis for trans-anal endoscopic micro-surgery for rectal
tumours

National Treasury Department: South Africa. August 2012. Medium Term Expenditure Framework
Guidelines. Preparation of Expenditure Estimates for the 2012 Medium Term Expenditure
Framework.

National Treasury: South Africa. Public Finance Management Act No. 1 of 1999 [PFMA]. Date of
commencement: 1 April 2000. Updated to Government Gazette 33059, 1 April 2010.

Public Finance Management Act No1. Of 1999 [PFMA]. Date of Commencement: 1 April 2000.
Gazette#25915. Public-Private Partnerships issued in terms of the Public Finance Management
Act. Treasury Regulation 16.

Rodriguez, A et al. January 2011. Providing endoscopy for underserved patients benefits public
health and resident education.

Roumm, AR. Pizzi, L et al. March 2009. Minimally invasive: minimally reimbursed? An examination
of six laparoscopic surgical procedures.

The Department of Environmental Affairs and Development Planning [DEADP]: Western Cape
Government. 21 June 2011. Draft White Paper on Greening the Procurement of Goods and
Services within the Western Cape Government. Provincial Gazette Extraordinary No. 6880

Vancock, H. 2007. "Dimensions of sustainability". Journal of Engineering for Sustainable
Development: Energy, Environment, and Health 2 (1): 47–57.

Western Cape Department of Health [WCDOH]. November 2011. 2020 –The Future of Health Care
in the Western Cape. A Draft Framework for Dialogue




17 | P a g e
Western Cape Government Department of Health. March 2012. Health Annual Performance Plan
2012/13. www. Westerncape.gov.za/health. Accessed March 2012.




18 | P a g e
11. GLOSSARY OF TERMS and ANNEXURES

GLOSSARY OF TERMS

1. Non-financial issues in analysis
This methodology takes issues of interest and benefit to a variety of stakeholders into account,
which issues may not be directly viewed as being able to be measurable in financial terms. These
issues nonetheless add value and so to provide a complete analysis, should be considered as part
of emergence: the whole being larger than the sum of the parts. [Flynn, D. 2009]

This requires systemic evaluation rather than the quite one-dimensional practices that are often
used in analysis models and requires a leap from current conservative measurement metrics to
William Flood‟s integrated model of systems thinking, design and systemic evaluation. [Flood,
R.1999]

2. The Balanced Scorecard
The Balanced Scorecard focuses not only on the financial outcomes, but also on the operational,
marketing and developmental facets of a company/organisation. This tool links the objectives and
strategies of the organisation to measurable outcomes, but not only in financial terms. One of the
main challenges for financial management is to identify and agree on the strategies that would
achieve the overall goals and objectives of the organisation via a process of strategy mapping.
The further challenge is inherent in apportioning weighted values or quantum‟s to such non-
financial outcomes. [Flynn, D. 2009]

3. The Triple Bottom Line

People. Profit. Planet.

In her article, titled, Dimensions of Sustainability, published in the Journal of Engineering for
Sustainable Development, Energy, Environment and Health, Hasna Vancock [ Vancock, H. 2007]
speaks to the fact that sustainability is a process – this process deals with the development of all
aspects of human life that affects sustenance. This process involves constantly trying to balance
conflicting goals, objectives and interests and involves the simultaneous pursuit of economic
prosperity, environmental quality and social equity, known as the three dimensions or the Triple
bottom line. Triple Bottom Line Reporting is fast becoming mandatory for listed companies and
government.

4. Finance Lease
A agreement where the lessor receives lease payments to cover its ownership costs. The lessee is
responsible for maintenance, insurance and taxes. Some finance leases are conditional sales or
hire purchase agreements. [Campbell, R.H. 2012]

5. Operating Lease
A contract that allows for the use of an asset, but does not convey the rights of ownership of the
asset to the lessee. An operating lease is not capitilised; it is accounted for as rental expense in
what is known as „off balance sheet financing‟. For the lessor, the asset being leased is accounted
for as an asset and depreciated as such. Operating leases result in assets or liabilities not being
recorded on the lessee‟s balance sheet. This can improve the lessee‟s financial ratios.
[http://www.investopedia.com/terms/o/operatinglease.asp]




19 | P a g e
6. Capital Structure
Capital is a scarce commodity. The objective of business management is to create value and add
value by the correct allocation of scarce resources. There are two primary ways in which capital
is used to return in an operating business. These are investments in fixed assets and in current
assets that are referred to as working capital items.

Financial Management has to align the capital structure of an organisation
[debt; equity; cash; liquidity] to achieve the objectives, strategies and desired outcomes of the
business most optimally. [Flynn, D. 2009. Chapter 13-3]

7. Capital Budgeting
In the case of government, capital budgeting is the process of evaluating projects that generate
improvements in service delivery outcomes and that align with the achievements of the Strategic
Objectives of a particular department and the provincial government as a whole. In its broadest
sense, the term is used for any expansion or replacement decision.

All of the principles of capital investing are pertinent to capital budgeting. The capital investment
decision must earn the required return on investment in order to add value or by adding value to
the activities of the organisation.

Capital budgeting decisions are generally considered to be more risky than working capital
decisions, because capital budgeting decisions carry long-term commitments of funds and are not
easily reversed if they prove to be unsuccessful. [Flynn, D. 2009. Chapter 14-3]

8. Net Present Value [ NPV]
This methodology compares the value of a rand today to the value of the same rand in the future,
taking inflation and returns into account. If the NPV of a prospective project is positive, it should
be accepted. Conversely, if NPV is negative, the project should probably be rejected because cash
flows may also be negative. [www.investopedia.com]

9. Positive cash flow
Creating a situation where cash inflows during a period are higher than the cash outflows during
the same period. Positive cash flow, in the case of government, does not mean profit. It is
achieved due to the careful management of cash inflows and expenditure.
[www.thebusinessdictionary.com] The Capital Structure [Flynn, D. 2009. Chapter 13-3] plays a
large role in determining an organisation‟s positive or free cash flows.

10. Working capital policies and management
Financial managers constantly grapple with decisions relating to risk and return in all aspects of
the business. Working capital is no exception. This decision is also a clear risk and return issue.
Managers must decide how much of the scarce resources of capital should be invested in inventory
and debtors and then determine the extent to which creditors will be used to finance further
investments. In government terms, a more conservative policy would aim to be less reliant on
short-term credit, financing a greater proportion of current assets through the use of longer-term
finance. [Flynn, D. 2009. Chapter 13-3]

Commentary: Within the context of the report presented, working capital policies are
recommended so as to free up much needed cash flows within the narrowing fiscal envelope,



20 | P a g e
whilst not compromising on the ability to procure much needed equipment required to improve
service delivery in the immediate future.

11. The Learning Organisation
In their abstract, A survey of market orientation research [Liao, S. H., Chang, W. J., Wu, C. C., &
Katrichis, J. M. 2011], we become aware that a Learning Organisation refers “to an organisation-
wide activity involved in creating and using knowledge to enhance competitiveness”.

12. Laparoscopic Surgery
Laparoscopic surgery, also known as minimally invasive surgery, is a technique that allows surgery
to be performed without the long traditional incision. By using multiple small incisions, each a few
centimeters long, the surgeon inserts instruments including a tiny camera. The camera allows the
surgeon to visualize the surgery. Incisions are made through the skin, muscle and other tissue,
making laparoscopic surgery safer as less tissue is cut [Heisler, J. January 2012.].

13. Extended Producer Responsibility

Extended Producer Responsibility is based on the „Polluter pays‟ principle and entails making
manufacturers responsible for the entire lifecycle of the products and packaging they produce.
This means companies that manufacture, import and/or sell products and packaging, are required
to be financially or physically responsible for such products after their useful life. They must either
take back spent products and manage them through reuse, recycling or in energy production or
delegate the responsibility to a third party which is paid by the producer for the spent-product
management. [DEADP.June 2011]

14. Life-Cycle Costing Analysis or Life-Cycle Cost Assessment

This is a procurement evaluation technique which determines the total cost of acquisition,
operation, maintaining and disposal of the items acquired; the lowest ownership cost during the
time the items is in use. [DEADP.June 2011]

15. Disposal Management

This refers to the decommissioning, clearance and removable of unserviceable, redundant and
obsolete assets. It considers obsolescence planning; maintaining a data base of redundant
material; inspecting material for potential reuse; determining a disposal strategy; and executing
the physical disposal process. [DEADP.June 2011]

16. Capped Budgeting

Budgeting is done by using historic or incremental budgeting, which has, in the main, the net
effect of not necessarily being able to keep pace with the constantly changing healthcare needs of
the citizens of the province or the changes required within the healthcare system as a whole.
Capped budgeting, by inference, remains unchanged, irrespective of the changing needs of the
organization and its clients.




21 | P a g e
17. Zero-based Budgeting and Activity-Based Budgeting

Expenses are justified for each new period and starts from a zero base. Each function within the
organization is analysed for needs and costs and budgets are built around what is need for the up-
coming period, regardless of whether such budgets are higher or lower than the previous period.
This allows for strategic goals to be implemented into the budgeting process.

Activity-based budgeting means that all activities that incur costs in every functional area of the
organization are recorded, their relationships defined and analysed. Activities are tied to the
strategic objectives, after which the cost of the activities are used to create the budget. This also
provides opportunities to streamline costs and improve business processes and activities. [Flynn,
D. 2009]




22 | P a g e
ANNEXURE A: ERNST & YOUNG. 9 FEBRUARY 2012. THE HEALTH FOUNDATION: THE
JOURNEY THUS FAR. SLIDE 23 EXTRACTED FROM PRESENTATION




23 | P a g e
ANNEXURE B: 2020 – The Future of Health Care in the Western Cape. A Draft
Framework for Dialogue: Key excerpt of material relevance to the Report and
Recommendations

“It is important to reflect on the achievements to date, what worked (and what did not) and the
lessons learned. While a formal external evaluation of the 2010 plan has not been undertaken, this
document summarises the most important achievements and lessons learned. An important theme
throughout the document is what should be done differently. (Section A).”

“What is the case for change? The compelling motivation for change includes changes in provincial
demography, socio-economic determinants of health and the burden of disease; advances in
technology; and the global, national and provincial policy environment. Sustaining the current
good practices, and improving others, is key to becoming a world class organisation. We
must focus on key priorities and the most cost-effective interventions within the limited
resources available. (Section B)”

“The planning for 2020 takes cognisance of both national and provincial policy developments.
Important policy frameworks include the “green paper” on the National Health Insurance, the
national Human Resources for Health framework and the provincial strategic plan, with particular
emphasis on Strategic Objective 4 (Improving Wellness). (Section B).”

“Prevention of disease and the promotion of wellness is the basis of health service development.
The upstream factors that contribute to the burden of disease will be addressed with the relevant
stakeholders through a “whole of society” approach. This approach has been recently endorsed
through the Cape Town Declaration on Wellness. The Department of Health will focus on
prevention and downstream promotion within the health service delivery platform. (Annexures A
and B).”

“The Department has drafted a broad strategic overview of a desired health care system in 2020.
Seven guiding principles have been identified to guide the 2020 strategy (Section C):

1. Patient-centred quality of care
2. A move towards an outcomes-based approach
3. The retention of a Primary Health Care philosophy
4. Strengthening the District Health Services model
5. Equity
6. Affordability
7. Building Strategic Partnerships “




24 | P a g e
ANNEXURE C: WESTERN CAPE HEALTH BUDGET SPEECH 2012 BY MR THEUNS BOTHA,
MINISTER OF HEALTH AT THE WESTERN CAPE PROVINCIAL LEGISLATURE

EXCERPTS OF MATERIAL RELEVANCE TO THE REPORT AND RECOMMENDATIONS

“Creating Wellness

The department is now engaged in planning for 2020 to determine the service requirements
going forward to 2020 and beyond. It will enable human resources, infrastructure and other
requirements to be identified that will shape the future services. At the heart of the vision
for 2020, there is a renewed commitment to a quality, caring and patient-centred health
service and improved health outcomes where the care pathways will be designed to
respond to patient needs.”

“The shift in focus from illness to one of promoting and seeking wellness that gained significant
ground during 2011/2012 culminating with the Wellness Summit and the ensuing Cape Town
Declaration will be further strengthened in the coming year. In particular, I am committed to
developing wellness centres that will increase the access in communities to health services and
activities promoting a healthier lifestyle.”

“Public private partnerships

Partnership with a range of stakeholders have increased year-on-year during the term of
this government. In the past two years, the province has been able to secure successful
partnerships with the private sector that have led to significant contributions to our
healthcare system. These public-private partnerships leverage the talents of the private
sector for the benefit of public sector patients. It is based on a win-win philosophy that
improves the physical health of patients and the financial health of the economy.”

“Surgical skills training centre

Located at the Red Cross War Memorial Children's Hospital, this centre is a partnership with the
Children's Hospital Trust and Karl Storz Endoscopy SA, the latter having donated R10 million in
equipment and technical assistance. It is the only training centre on this continent for
surgeons-in-training from across Africa.”

“Western Cape Health Foundation

Supporting our efforts increase departmental income to address the R800 million
maintenance backlog, we have appointed Ernst and Young Consultants, which resulted in the
establishment of the independent Western Cape Health Foundation.

The Foundation will take responsibility for the Commercial Rights project and independently
spearhead new and innovative initiatives to generate resources for health. This is a
significant step in strengthening this key relationship between the department and the
private sector.

I am encouraged that a number of prominent people, including Dr Paul Cluver, who will chair the
board of directors of the Health Foundation, have been willing to give of their time and energy to
promote better health in the Western Cape. Clearly an example of people who also feel that it is
better together! The Foundation will be publicly introduced in the coming months.

These examples certainly demonstrate that the Western Cape has succeeded in responding with
solutions which have proved to bring about better health outcomes. At the heart of our



25 | P a g e
provincial system is a commitment to accountability, affordability and efficiency - all
necessary elements for high-quality health outcomes.”

“The focus areas of the department in the coming 2012/2013 financial year include:

       1. Developing action plans to improve overall patient experience and quality of clinical
          care.
       2. The full commissioning of the Khayelitsha Hospital.
       3. Commissioning of the Mitchell's Plain Hospital.
       4. Finalising the 2020 strategy and plan for health services in the Western Cape.
       5. Finalising the priority projects related to the Cape Town Declaration on Wellness including
          the:

         High Five area approach to reduce alcohol-related injuries.
         Healthy lifestyle campaign to decrease the incidence of chronic disease.
         Programme to reduce intimate partner violence.

       6. Improving maternal and child health outcomes.
       7. Achieving an unqualified audit for finance, human resources and pre-determined
          objectives.”

“Challenges

The allocation to the department in 2012/2013, although increasing in nominal terms, is
marginally less in real terms than the 2011/2012 Adjusted Budget. The gap between the
need for health services and the available resources remains the challenge and increases
the need to increase efficiency, work smarter and reprioritise services within the
existing baseline allocation.”

“Distribution of the budget

The budget of the department is divided between the eight budget programmes with R12.722
billion or 87% of the vote being allocated to Programmes 2, 3, 4 and 5 which fund the direct
operational costs of providing health services.

Compensation of employees accounts for R8.478 billion or 58% of the total budget. The
department has allocated approximately 31 % or R4.456 billion to the procurement of goods and
services, which amounts to approximately 55% of the goods and services procured by the Western
Cape Government. “

“Programme Three: Emergency Medical Services

Emergency Medical Services, which is responsible for the provision of emergency medical transport
including inter-hospital transfers and planned patient transport, is allocated R701 million or 4.8%
of the vote.

An amount of R15 million has been allocated provisionally for the Information
Communication Technology system. This new computer-aided dispatch system, required to
replace the existing system, will provide both the communication centre solution and the vehicle-
based solution. It is anticipated that the system, once implemented, will improve the efficiency of
the ambulance dispatch process and will also provide real-time information. “




26 | P a g e
“HealthNet is a transport service for our patients and the only-of-its-kind in the country. We
have a fleet of 78 HealthNet vehicles, adapted for ill patients, which transport approximately
4000 patients from rural areas across the province to central hospitals per month. The service
employs 95 personnel and performs outpatient transfers between levels of care.

This transport infrastructure also transfers patients from primary healthcare facilities to regional
and district hospitals. Although the service is often under unfair scrutiny, the new electronic
supply and demand system will certainly improve the booking system, and address the problems
of misuse.”

“Programme Four: Provincial Hospital Services

This programme is responsible for the provision of general specialist and specialised
hospital services that include tuberculosis, psychiatric, rehabilitation and dental training hospitals.
Central hospitals, which are large functional service delivery structures, are integral to a
coherent health care delivery system at provincial level. These hospitals are the health
facilities where a majority of health sciences trainees are trained to become health
professionals, and where much of the health professional service skills, health
research and knowledge capital resides.

The Western Cape is the only province that over a number of years attempted to define and
manage general and highly specialist services separately within the central hospitals. The funding
of these services was distributed accordingly to separate budgetary programs however after
concluding that with the current information and management systems that this was not possible
the department has reverted to funding the hospitals as functional entities. This reinforces the
argument that to attempt to manage and fund these hospitals divorced from the health system
within which they function is not viable.”

“Programme Five: Central Hospital Services

The central hospitals, Groote Schuur Hospital, Tygerberg Hospital and Red Cross Children's
Hospital, provide highly specialised healthcare services and a platform for research and
training of health workers by the universities. All three hospitals provide highly
specialised services as national referral centres.

Central hospitals are allocated R4.212 billion or 28.8% of the vote in 2012/2013, which amounts to
a nominal increase of R240.029 million or 6%.

The total National Tertiary Services Grant of R2.182 billion, R270 million of the Health Professions
Training and Development Grant and R3 million of the National Health Insurance Grant constitute
approximately 58% of the funding allocated to this programme. The balance of R1.757 billion
allocated to the programme is derived from the provincial equitable share, which clearly illustrates
the extent of the underfunding of highly specialised services by the national conditional
grants. Personnel costs are especially high in these hospitals constituting approximately 69% of
the expenditure of this programme.

The central hospitals will manage approximately 140 395 patient admissions in 2 545 beds and 1
123 389 patient day equivalents at a cost of R3 244 per patient day equivalent.”

“The provincial equitable share funding has been allocated as follows:

        R47 million for the purpose of maintaining current infrastructure.
        R11 million for preventive maintenance.
        R180 million for the purpose of maintenance and capital expenditure.



27 | P a g e
    R12 million for Red Cross War Memorial Children's Hospital.”

“Although the Western Cape does not support the National Health Insurance green paper
in its current format, it does not mean that the province will not participate in the NHI pilot
projects.

As an alternative solution, Western Cape Government proposes Universal Healthcare, built
on a primary healthcare basis, similar to the structures implemented in the Western Cape at
present, where patients are referred to regional and specialised facilities according to their medical
needs, and government providing the transport infrastructure. The rest is governance-based on
good business principles - financial discipline, efficiency, equality, modernisation,
monitoring and evaluation.

The lesson we have learned in the Western Cape is that we can improve healthcare for everyone
by strengthening the positive elements of the public sector and removing its
deficiencies on a planned and sustained basis. “

“In the efforts to increase wellness by working together we can all be better together! If all
those who work in the department work effectively and efficiently and make the best use
of the available funds to provide the best service, we can be better together!”

“Improving the health status and well-being of the people of the Western Cape can only be
achieved through partnerships, put differently by working better together we can all live
a better life!

Thank you!”




28 | P a g e
ANNEXURE D: WESTERN CAPE GOVERNMENT HEALTH. ANNUAL PERFORMANCE PLAN.
2012/13.

EXCERPT SUMMARISING STRATEGIC OBJECTIVE FOUR [4]

“The draft strategy for 2020 has two main thrusts, as described in the Strategic Objective:
Improving Wellness (SO 4) that forms part of provincial strategic plan.

Firstly, at the heart of the vision of 2020 is a renewed commitment to a caring, quality,
patient-centric health service. The district health service, supported by all levels and sections
of the service is the key vehicle to deliver this quality health service. The PHC philosophy implies a
comprehensive health service across levels of care and the various sectors allowing for meaningful
and active participation by communities.

The limited resource base compared to the need for health services demands a more
focused approach to improve health outcomes in the most efficient and productive
manner possible. The Department acknowledges that addressing these challenges requires
strong partnerships with a range of role players.

Secondly, there is an important conceptual shift from managing the consequences of the burden
of disease to improving wellness. Central to this approach is an increased emphasis on prevention
and promotion by addressing the upstream risk factors that impact on health and wellness in the
whole of society. The endorsement at the Western Cape Health Summit held in November 2011 of
the Cape Town Declaration on Wellness by approximately 250 delegates from all sectors of society
in the Western Cape was an important milestone in this regard. There are six focus areas that
have been identified and work is underway to identify, plan and implement projects in these
areas.”




29 | P a g e
ANNEXURE E: FINANCE INSTRUCTION G22/2009

CLASSIFICATION OF LEASE AGREEMENTS IN THE STANDARD CHART OF ACCOUNTS AS WELL
AS THE REPORTING ON LEASE COMMITMENTS AT THE END OF EACH FINANCIAL YEAR

1.       The contents of this Finance Instruction must be brought to the attention of all
         officials concerned.

2.       Finance Instruction G19/2009 dated 10 March 2009 is applicable to the 2008/2009
         financial year only and is repealed as from 1 April 2009.

         However Finance Instruction G22/2009 must be read in conjunction with Finance
         Instruction G19/2006 dated 13 April 2006.

3.       PURPOSE

3.1      The purpose of this Finance Instruction is to provide guidance to all financial staff on
         the economic classification of lease payments in the budget and in BAS using the
         new SCOA accounts and segments.              In addition the circular clarifies the link
         between the economic classification and the disclosure requirements in the Annual
         Financial Statements and also introduces the differentiation between Operational
         and Financial Leases.

4.       DEFINITION OF LEASE COMMITMENTS

4.1      Lease commitments represent amounts owing from the reporting date to the end
         of the lease contract.

4.2      A lease is a contract that gives the lessee (the renter) the right to use an asset for
         an agreed period of time in return for a payment or series of payments.

4.3      A finance lease is a lease that transfers substantially all risks and rewards incidental
         to ownership of an asset. Title may or may not eventually be transferred

4.4      An operating lease is a lease other than a finance lease.

4.5      Economic life is the period over which an asset is expected to yield economic
         benefits or service potential to one or more users.

4.6      Useful life is the estimated remaining period, from the beginning of the lease term,
         without limitation by the lease term, over which the economic benefits or service
         potential embodied in the asset are expected to be consumed by the entity

4.7      The definition of a lease includes contracts for the hire of an asset, which contain a
         provision giving the option to acquire title upon the fulfillment of agreed conditions.
         These contracts are sometimes known as hire purchase contracts.

4.8      It is common practice for contracts to be termed rental agreements. This therefore
         does not mean that this is excluded from being a lease. One still needs to go
         through the conditions of the contract to determine whether it is a finance lease or
         an operating lease.

4.9      It is important to note that the payment of a lump sum amount (rather than regular
         periodic payment such as monthly payments) does not preclude lease accounting
         as such arrangements may still meet the definition of a lease.



30 | P a g e
5.       DETERMINATION OF A FINANCE LEASE VS. OPERATING LEASE

5.1      FINANCE LEASE


                   Lessor                                                           Lessee

               Treat as a sale                                                Treat as a purchase
                                               Asset


Lease that transfers substantially all the risks and rewards of ownership

5.2      OPERATING LEASE



                  Lessor                                                            Lessee
                                               Right to use the
                                               asset




         Lease that does not transfer substantially all the risks and rewards of ownership

6.       CLASSIFICATION OF LEASES

6.1      The classification of leases is based on the extent to which risks and rewards
         incidental to ownership of a leased asset lie with the lessor or the lessee rather than
         on which party has legal ownership over the asset.

6.2      Risks include the possibilities of losses from idle capacity, technological
         obsolescence or changes in value due to changing economic conditions. Rewards
         may be represented by the expectation of service potential or profitable operation
         over the asset’s economic life and of gain from appreciation in value or realisation
         of a residual value

6.3      Although the following are examples of situations, which would normally lead to a
         lease being classified as a finance lease, a lease does not need to meet all these
         criteria in order to be classified as a finance lease:

              The lease transfers ownership of the asset to the lessee by the end of the lease
               term;

              The lessee has the option to purchase the asset at a price which is expected to
               be sufficiently lower than the fair value at the date the option becomes
               exercisable, so that at the inception of the lease it is reasonably certain that the
               option will be exercised;

              The lease term is for the major part of the economic life of the asset even if title
               is not transferred;

              At the inception of the lease the present value of the minimum lease payments
               amounts to at least 90% of the fair value of the asset.




31 | P a g e
     The leased assets are of a specialised nature such that only the institution can
               use the assets without modifications being made;

              The lessor’s losses associated with cancellation of the lease by the lessee is
               borne by the lessee; or

              The leased assets cannot easily be replaced by another asset.

6.4      Transactions and other events are accounted for and presented in accordance
         with their substance and financial reality and not merely with legal form. While the
         legal form of a lease agreement is that the lessee may acquire no legal title to the
         leased asset, in the case of finance lease the substance and financial reality are
         that the lessee acquires the economic benefits or service potential of the use of the
         leased asset for the obligation to pay for that right an amount approximating to the
         fair value of the asset and the related finance charge.

6.5      Sometimes the terms of a lease is such that the lessee is substantially in the same
         economic position as if the lessee had borrowed money to buy the asset (even
         though legal title may not pass to the lessee). For example, this may be the case if
         the lease payments effectively are paying for the whole asset or if the lease term is
         such that the lessee can use the asset for the major part of its economic life.




32 | P a g e
7.       CLASSIFICATION OF A LEASE AGREEMENT

                                                                           Yes
               Ownership transferred at end of lease?



                                No



               Bargain purchase option?                                    Yes




                                No



           Lease term = major part of economic life?
                                                                           Yes



                                No




           Present value of minimum lease payment >                        Yes
           fair value of asset?



                                No
                                                                  FINANCE LEASE

                      OPERATING LEASE




8.       ACCOUNTING POLICY

8.1   Operating and finance lease commitments are expensed when the payments are
made.

         Assets acquired in terms of finance lease agreements are disclosed in the
         annexures and disclosure notes to the Financial Statements.

8.2      The classification of the lease (i.e. operating or finance lease) must be made at the
         inception of the lease agreement and accounted for as follows:




33 | P a g e
Item Segment                    Asset Segment                    Project segment

Operating lease

OPERATING LEASE            LEASES: PHOTOSTAT MACHINES            NO PROJECTS (STAND ALONE
                                                                 ITEM) CUR
                           LEASES: FAX MACHINES

Finance lease

FINANCE        LEASE       LEASES: CELLPHONES                    NO PROJECTS (STAND ALONE
(Capital portion of                                              ITEM) CAP
instalments)               LEASES: TELEPHONE SWITCHES

                           LEASES: MEDICAL EQUIPMENT

                           LEASES: NON-MEDICAL EQUIPMENT

Interest on leases

INTEREST ON LEASES         LEASES: CELLPHONES                    NO PROJECTS (STAND ALONE
                                                                 ITEM) CUR
(interest portion of       LEASES: TELEPHONE SWITCHES
instalment
                           LEASES: MEDICAL EQUIPMENT

                           LEASES: NON-MEDICAL EQUIPMENT



8.3      Unfortunately the PFMA prohibits borrowing by National/Provincial Departments
         and the Treasury Regulations makes it clear that finance leases are deemed to be
         borrowings and are therefore not permitted.

8.4      Although departments are not permitted to enter into/have finance leases, all
         finance leases that they do have should be disclosed as finance leases. It will
         however mean that the department will not be complying with the Treasury
         Regulations (TR 13). Finance leases may not (incorrectly) be disclosed as operating
         leases even when the lease is condoned by National Treasury.

8.5      Practice Note 5 of 2007/08 issued by the Office of the Accountant General seeks to
         provide the following circumstances where departments may enter into finance
         leases without additional approval required:

8.5.1    Finance leases where:

              A Finance lease is more economical than an operating lease; and

              The period of the finance lease does not exceed 60 months in respect of motor
               vehicles and 36 months for equipment except with written approval by the
               relevant Treasury; and

              The finance lease was entered into in terms of RT3 of 2006 or a transversal
               contract entered into by National Treasury



34 | P a g e
8.5.2    Blanket approval for any irregular expenditure incurred as a result of RT3 of 2000
         and RT3 of 2003 Transversal contracts entered with various suppliers for the supply,
         delivery, installation, commissioning and maintenance of office equipment and
         labour saving devices has been given

9.       PROCEDURES TO BE FOLLOWED BY DIRECTORATES/DISTRICTS AND INSTITUTIONS WITH
         REGARD TO THE CLASSIFICATION AND ACCOUNTING OF LEASES

9.1      MAINTENANCE OF SEPARATE LEASE REGISTERS FOR FINANCE AND OPERATING LEASES
         AND THE CLASSIFICATION OF LEASES:

9.1.1. Directorates/Districts and Institutions must ensure that all leases concluded be
       identified and classified.

9.1.2. The following serves as examples of Operating and Finance Leases determined
       from lease agreements currently in place.

                     Finance Leases                           Operating Leases

          Cell phone contracts where         the Photostat machines
          department holds the contract

          Telephone Switchboard Agreements          Fax machines

          Equipment Lease Agreements

          These agreements are sometimes
          known as hire purchase agreements
          where it was clear from the outset
          that the asset will remain with the
          department for most of its economic
          life and the only reason why it was
          not outright purchased was because
          it was deemed more economical
          and affordable to pay the purchase
          price over a fixed period.

          Also in cases where assets are almost
          permanently        placed         with
          Departments     with    the    written
          arrangement that Departments will
          buy dedicated consumables to be
          used on the equipment. If there is a
          fixed portion paid for the availability
          of the equipment and even possibly
          a fixed amount for consumables per
          month, the fixed amount for the asset
          will be the lease and that for the
          consumables will be a normal
          commitment while the variable



35 | P a g e
amount for the consumables at a unit
          price will be normal expenditure. If
          there is no charge for the asset being
          placed on the premises there is no
          lease.

         It must be noted that the terms of the agreement will dictate whether an Operating
         or Finance Lease has been concluded. If in doubt kindly approach the SCM Unit
         at Head Office for assistance.

9.1.3    Leases concluded must be entered into a Lease Register. Separate Lease registers
         must be maintained for Operational and Finance Leases. Each Lease register must
         contain the minimum requirements as per paragraph 6 of Treasury Circular 5/ 2006
         dated 10 March 2006 distributed under cover of Finance Instruction G19/ 2006
         dated 13 April 2006.

9.1.4    Information on leases concluded and copies of the Lease Agreements must be
         forwarded to SCM: Section Contract Management, 4 Dorp Street, Cape Town on a
         monthly basis. An indication must also be given of the classification of the lease for
         audit purposes.

9.1.5    The Section: Contract Management will also maintain a Lease Register and will
         ensure that the Register maintained at Head Office agrees with the Lease Register
         maintained by the Directorate/District/Institution.

9.1.6      The rental of gas cylinders via National Contract RT 81 should not be considered
           as leases as the rental is payable annually in advance. If any other gases or
           containers are rented or leased on a basis where it is payable on a fixed monthly/
           quarterly/ six-monthly basis, these arrangements should be measured against the
           criteria for leases.

9.2        ACCOUNTING OF LEASES

9.2.1      Leases must be accounted according to the new SCOA effective from 1 April
           2008.

9.2.1.1 All Operating Leases must be paid as follows:

           Item Segment

           Operating Leases

           Asset Segment

           Leases: Photostat Machines

           Leases: Fax Machines

           Project Segment

           No projects (stand-alone) current




36 | P a g e
9.2.1.2 All Finance Leases to be paid as follows:

           Item Segment

           Financial Leases

           Asset Segment

           Leases: Cellphones

           Leases: Telephone Switches

           Leases: Medical Equipment

           Leases: Non-Medical Equipment

           Project Segment

           No projects (stand-alone) capital

9.2.1.3 All interest payments on finance leases must be paid as follows:

           Item Segment

           Interest Paid: Finance Leases

           Asset Segment

           Leases: Cellphones

           Leases: Telephone Switches

           Leases: Medical Equipment

           Leases: Non-Medical Equipment

           Project Segment

           No projects (stand-alone) current

9.2.2      At the end of the financial year i.e. from 1 – 15 April of each year the Section:
           Contract Management will obtain the relevant information on the Finance Lease
           payments made. A Journal where the interest portion will be shifted from capital
           to interest will be drawn by Head Office before 31 April of each year.

Your co-operation is appreciated.

MR JM JOOSTE

pp HEAD: HEALTH

DATE: 27 March 2009 Jooste/Fin InstructionG22/2009

Classification of lease agreements in the SCOA/March 2009




37 | P a g e
38 | P a g e
Western Cape - Dept of Health

               Capex Budget         2011 - 2016

               Annual increase                5%
                                                                              2011/2012        2012/2013         2013/2014         2014/2015         2015/2016        2016/2017        2017/2018       2018/2019        2019/2020        2020/2021

                                                                                          0                0                 0                 0                 0                0                0               0                0                0

 1. Allocation for low-value equipment and other assets                       100 000 000      105 000 000       110 250 000       115 762 500       121 550 625      127 628 156      134 009 564      140 710 042     147 745 544      155 132 822

 2. Allocation for big-ticket assets *                                        100 000 000      105 000 000       110 250 000       115 762 500       121 550 625      127 628 156      134 009 564      140 710 042     147 745 544      155 132 822

                                    Budgeted Expenditure                      200 000 000      210 000 000       220 500 000       231 525 000       243 101 250      255 256 313      268 019 128      281 420 085     295 491 089      310 265 643




                                                                             Possible #       Possible #       Possible #        Possible #        Possible #        Possible #
                                                                             of units         of units         of units          of units          of units          of units
           *           6 units at     5 000 000    =        30   000   000                6                0                 0                 7                 0                0
                       3             10 000 000    =        30   000   000                3                0                 0                 2                 0                0
                       1             15 000 000    =        15   000   000                1                0                 0                 2                 0                0
                                                            75   000   000

                                                                               75 000 000                  0                 0      85 000 000                   0                0


                                                                              2011/2012        2012/2013         2013/2014         2014/2015         2015/2016        2016/2017        2017/2018       2018/2019        2019/2020        2020/2021
               Cash Flows

               Annual Budget          Per Year                                100 000 000      105 000 000       110 250 000       115 762 500       121 550 625      127 628 156      134 009 564      140 710 042      147 745 544      155 132 822
                                     Cumulative                               100 000 000      205 000 000       315 250 000       431 012 500       552 563 125      680 191 281      814 200 845      954 910 888    1 102 656 432    1 257 789 254


               Rental Cash Flows      Per Year                                (17 601 918)     (17 601 918)      (17 601 918)      (37 978 339)      (37 978 339)     (27 604 078)     (27 604 078)     (20 376 421)     (8 366 917)      (8 366 917)
                                     Cumulative                               (17 601 918)     (35 203 837)      (52 805 755)      (90 784 094)     (128 762 433)    (156 366 511)    (183 970 590)    (204 347 010)   (212 713 927)    (221 080 844)

                                    Cash Differential     Per Year             82 398 082       87 398 082        92 648 082        77 784 161        83 572 286      100 024 078      106 405 486      120 333 622     139 378 627       146 765 905
                                                          Cumulative           82 398 082      169 796 163       262 444 245       340 228 406       423 800 692      523 824 770      630 230 256      750 563 877     889 942 505     1 036 708 409

                                    less: (assets not rented)                 (25 000 000)     (26 250 000)      (27 562 500)      (28 940 625)      (30 387 656)     (31 907 039)     (33 502 391)     (35 177 511)    (36 936 386)     (38 783 205)
                                            0.25
                                    Available Cash:        Per Year            57 398 082       61 148 082        65 085 582        48 843 536        53 184 630       68 117 039       72 903 095       85 156 111     102 442 241      107 982 699
                                                           Cumulative          57 398 082      118 546 163       183 631 745       232 475 281       285 659 910      353 776 949      426 680 044      511 836 155     614 278 397      722 261 096

               Accelerated equipment purchases: 2011/2012
 13




                       4 units at     5 000 000    =        20 000 000
                       2 units at    10 000 000    =        20 000 000
 P A G E




                       1 units at    15 000 000    =        15 000 000         55 000 000


               Accelerated equipment purchases: 2014/2015

                       5 units at     5 000 000    =        25 000 000
                       1 units at    10 000 000    =        10 000 000
                       1 units at    15 000 000    =        15 000 000                                                              50 000 000




ANNEXURE F: TABLE 1: OPERATING LEASING BENCHMARK SCENARIO MODEL
40 | P a g e

Mais conteúdo relacionado

Destaque

Istrazivanje Ipsos Puls o prijedlogu ustavnih promjena PRH
Istrazivanje Ipsos Puls o prijedlogu ustavnih promjena PRHIstrazivanje Ipsos Puls o prijedlogu ustavnih promjena PRH
Istrazivanje Ipsos Puls o prijedlogu ustavnih promjena PRHKrešimir Macan
 
Munich Re Claims Brochure July 2014
Munich Re Claims Brochure  July 2014Munich Re Claims Brochure  July 2014
Munich Re Claims Brochure July 2014Reuben Chikudo
 
Uni fiee scm sesion 02 arquitectura scm
Uni fiee scm sesion 02 arquitectura scmUni fiee scm sesion 02 arquitectura scm
Uni fiee scm sesion 02 arquitectura scmc09271
 
Impresario Credentials 13 03
Impresario Credentials 13 03Impresario Credentials 13 03
Impresario Credentials 13 03Praful Baweja
 
Alpenliebe in-app multimedia zone on RockeTalk, a mobile marketing case study
Alpenliebe in-app multimedia zone on RockeTalk, a mobile marketing case studyAlpenliebe in-app multimedia zone on RockeTalk, a mobile marketing case study
Alpenliebe in-app multimedia zone on RockeTalk, a mobile marketing case studyArvind Joshi
 
Latinports Boletín Informativo Septiembre-Diciembre 2012
Latinports Boletín Informativo Septiembre-Diciembre 2012Latinports Boletín Informativo Septiembre-Diciembre 2012
Latinports Boletín Informativo Septiembre-Diciembre 2012latinports
 
Pteg i-grupo5- cap 6-lenguaje de programacion
Pteg i-grupo5- cap 6-lenguaje de programacionPteg i-grupo5- cap 6-lenguaje de programacion
Pteg i-grupo5- cap 6-lenguaje de programacionErikValladarez
 
Recopilación examenes algebra
Recopilación examenes algebraRecopilación examenes algebra
Recopilación examenes algebraAmando Ferrer
 
Aurae Beidler CSE 627 final project
Aurae Beidler CSE 627 final projectAurae Beidler CSE 627 final project
Aurae Beidler CSE 627 final projectbeidlera
 
Propuesta Oficina Nutricional (SOFI 4218)
Propuesta Oficina Nutricional (SOFI 4218)Propuesta Oficina Nutricional (SOFI 4218)
Propuesta Oficina Nutricional (SOFI 4218)XiomaraMPG
 
Presentacion Boca Boca Diciembre
Presentacion  Boca  Boca  DiciembrePresentacion  Boca  Boca  Diciembre
Presentacion Boca Boca Diciembrebocabocaonline
 
How to prepare jiwamrita ( hindi)
How to prepare jiwamrita ( hindi)How to prepare jiwamrita ( hindi)
How to prepare jiwamrita ( hindi)Sunil Jain
 
Florida Green Home Building & Indoor Air Quality, John P. Lapotaire, CIEC
Florida Green Home Building & Indoor Air Quality,  John P. Lapotaire, CIEC Florida Green Home Building & Indoor Air Quality,  John P. Lapotaire, CIEC
Florida Green Home Building & Indoor Air Quality, John P. Lapotaire, CIEC John P. Lapotaire, CIEC.
 
El cuadrado mágigo de durero
El cuadrado mágigo de dureroEl cuadrado mágigo de durero
El cuadrado mágigo de dureroRoberto Polo
 
Brand24 Oferta
Brand24 OfertaBrand24 Oferta
Brand24 OfertaBrand24
 
L'affresco
L'affrescoL'affresco
L'affrescoBabBeba
 

Destaque (20)

Istrazivanje Ipsos Puls o prijedlogu ustavnih promjena PRH
Istrazivanje Ipsos Puls o prijedlogu ustavnih promjena PRHIstrazivanje Ipsos Puls o prijedlogu ustavnih promjena PRH
Istrazivanje Ipsos Puls o prijedlogu ustavnih promjena PRH
 
Munich Re Claims Brochure July 2014
Munich Re Claims Brochure  July 2014Munich Re Claims Brochure  July 2014
Munich Re Claims Brochure July 2014
 
Soul Transformation
Soul Transformation Soul Transformation
Soul Transformation
 
Uni fiee scm sesion 02 arquitectura scm
Uni fiee scm sesion 02 arquitectura scmUni fiee scm sesion 02 arquitectura scm
Uni fiee scm sesion 02 arquitectura scm
 
Impresario Credentials 13 03
Impresario Credentials 13 03Impresario Credentials 13 03
Impresario Credentials 13 03
 
Material El Salvador Ogalde
Material El Salvador OgaldeMaterial El Salvador Ogalde
Material El Salvador Ogalde
 
Alpenliebe in-app multimedia zone on RockeTalk, a mobile marketing case study
Alpenliebe in-app multimedia zone on RockeTalk, a mobile marketing case studyAlpenliebe in-app multimedia zone on RockeTalk, a mobile marketing case study
Alpenliebe in-app multimedia zone on RockeTalk, a mobile marketing case study
 
Latinports Boletín Informativo Septiembre-Diciembre 2012
Latinports Boletín Informativo Septiembre-Diciembre 2012Latinports Boletín Informativo Septiembre-Diciembre 2012
Latinports Boletín Informativo Septiembre-Diciembre 2012
 
Pteg i-grupo5- cap 6-lenguaje de programacion
Pteg i-grupo5- cap 6-lenguaje de programacionPteg i-grupo5- cap 6-lenguaje de programacion
Pteg i-grupo5- cap 6-lenguaje de programacion
 
Recopilación examenes algebra
Recopilación examenes algebraRecopilación examenes algebra
Recopilación examenes algebra
 
Aurae Beidler CSE 627 final project
Aurae Beidler CSE 627 final projectAurae Beidler CSE 627 final project
Aurae Beidler CSE 627 final project
 
Propuesta Oficina Nutricional (SOFI 4218)
Propuesta Oficina Nutricional (SOFI 4218)Propuesta Oficina Nutricional (SOFI 4218)
Propuesta Oficina Nutricional (SOFI 4218)
 
Presentacion Boca Boca Diciembre
Presentacion  Boca  Boca  DiciembrePresentacion  Boca  Boca  Diciembre
Presentacion Boca Boca Diciembre
 
Aktuelles zu ISO 27000
Aktuelles zu ISO 27000Aktuelles zu ISO 27000
Aktuelles zu ISO 27000
 
How to prepare jiwamrita ( hindi)
How to prepare jiwamrita ( hindi)How to prepare jiwamrita ( hindi)
How to prepare jiwamrita ( hindi)
 
Web Forum2009
Web Forum2009Web Forum2009
Web Forum2009
 
Florida Green Home Building & Indoor Air Quality, John P. Lapotaire, CIEC
Florida Green Home Building & Indoor Air Quality,  John P. Lapotaire, CIEC Florida Green Home Building & Indoor Air Quality,  John P. Lapotaire, CIEC
Florida Green Home Building & Indoor Air Quality, John P. Lapotaire, CIEC
 
El cuadrado mágigo de durero
El cuadrado mágigo de dureroEl cuadrado mágigo de durero
El cuadrado mágigo de durero
 
Brand24 Oferta
Brand24 OfertaBrand24 Oferta
Brand24 Oferta
 
L'affresco
L'affrescoL'affresco
L'affresco
 

Semelhante a IMPROVING FINANCIAL EFFICIENCIES, SERVICE DELIVERY AND PATIENT-CENTRICITY BY CONSIDERING ALTERNATIVE FINANCE STRATEGIES, CAPITAL STRUCTURE POLICY, GREEN PROCUREMENT POLICY AND TRIPLE-BOTTOM LINE PARTNERSHIPS AN ANALYSIS OF THE RISKS AND REWARDS OF INNOVA

Clean Energy Finance and Investment Roadmap of Thailand: background information
Clean Energy Finance and Investment Roadmap of  Thailand: background informationClean Energy Finance and Investment Roadmap of  Thailand: background information
Clean Energy Finance and Investment Roadmap of Thailand: background informationOECD Environment
 
African e health economics Forum: Amanda Brikmann Chair: 2 sessions: Context...
African e health economics Forum: Amanda Brikmann Chair: 2 sessions:  Context...African e health economics Forum: Amanda Brikmann Chair: 2 sessions:  Context...
African e health economics Forum: Amanda Brikmann Chair: 2 sessions: Context...Amanda Brinkmann
 
Chapter 15Learning ObjectivesElements of a h
Chapter 15Learning ObjectivesElements of a hChapter 15Learning ObjectivesElements of a h
Chapter 15Learning ObjectivesElements of a hEstelaJeffery653
 
A Public Private Partnership Approch to Climate Finance
A Public Private Partnership Approch to Climate FinanceA Public Private Partnership Approch to Climate Finance
A Public Private Partnership Approch to Climate FinanceAldo Baietti
 
Contracting for Services in Public Sector - 11 & 12 Aug - Canberra
Contracting for Services in Public Sector - 11 & 12 Aug - CanberraContracting for Services in Public Sector - 11 & 12 Aug - Canberra
Contracting for Services in Public Sector - 11 & 12 Aug - CanberraPASA Events
 
Restoration as an economic enterprise and driver of job creation
Restoration as an economic enterprise and driver of job creationRestoration as an economic enterprise and driver of job creation
Restoration as an economic enterprise and driver of job creationGlobal Landscapes Forum (GLF)
 
CEFI Roadmap for India workshop III
CEFI Roadmap for India workshop IIICEFI Roadmap for India workshop III
CEFI Roadmap for India workshop IIIOECD Environment
 
MR12CD Tuesday 13h00 - Sayed
MR12CD Tuesday 13h00 - SayedMR12CD Tuesday 13h00 - Sayed
MR12CD Tuesday 13h00 - Sayed7391456
 
HPAC0003 Strategic Plan June 2015 FINAL
HPAC0003 Strategic Plan June 2015 FINALHPAC0003 Strategic Plan June 2015 FINAL
HPAC0003 Strategic Plan June 2015 FINALEmma Hodgkin
 
OECD Principles on Public-Private Partnerships
OECD Principles on Public-Private PartnershipsOECD Principles on Public-Private Partnerships
OECD Principles on Public-Private PartnershipsOECD Governance
 
Case Study - Making the PMO the heart of the NHS Change Agenda
Case Study - Making the PMO the heart of the NHS Change AgendaCase Study - Making the PMO the heart of the NHS Change Agenda
Case Study - Making the PMO the heart of the NHS Change AgendaDavid Walton
 
FINANCING UNDER SME & CGTMSE
FINANCING UNDER SME & CGTMSEFINANCING UNDER SME & CGTMSE
FINANCING UNDER SME & CGTMSEAnkit Agarwal
 
Coverage Bcp Profile 200904
Coverage Bcp Profile 200904Coverage Bcp Profile 200904
Coverage Bcp Profile 200904yoria
 
Commissioning - Principles v5.1
Commissioning - Principles v5.1Commissioning - Principles v5.1
Commissioning - Principles v5.1Julian Ingram
 
Scaling Climate Action through Technology and Innovation by SMEs for Green In...
Scaling Climate Action through Technology and Innovation by SMEs for Green In...Scaling Climate Action through Technology and Innovation by SMEs for Green In...
Scaling Climate Action through Technology and Innovation by SMEs for Green In...Francois Stepman
 
CEFI Roadmap Overview: John Dulac & Poonam Sandhu
CEFI Roadmap Overview: John Dulac & Poonam SandhuCEFI Roadmap Overview: John Dulac & Poonam Sandhu
CEFI Roadmap Overview: John Dulac & Poonam SandhuOECD Environment
 

Semelhante a IMPROVING FINANCIAL EFFICIENCIES, SERVICE DELIVERY AND PATIENT-CENTRICITY BY CONSIDERING ALTERNATIVE FINANCE STRATEGIES, CAPITAL STRUCTURE POLICY, GREEN PROCUREMENT POLICY AND TRIPLE-BOTTOM LINE PARTNERSHIPS AN ANALYSIS OF THE RISKS AND REWARDS OF INNOVA (20)

Clean Energy Finance and Investment Roadmap of Thailand: background information
Clean Energy Finance and Investment Roadmap of  Thailand: background informationClean Energy Finance and Investment Roadmap of  Thailand: background information
Clean Energy Finance and Investment Roadmap of Thailand: background information
 
African e health economics Forum: Amanda Brikmann Chair: 2 sessions: Context...
African e health economics Forum: Amanda Brikmann Chair: 2 sessions:  Context...African e health economics Forum: Amanda Brikmann Chair: 2 sessions:  Context...
African e health economics Forum: Amanda Brikmann Chair: 2 sessions: Context...
 
Chapter 15Learning ObjectivesElements of a h
Chapter 15Learning ObjectivesElements of a hChapter 15Learning ObjectivesElements of a h
Chapter 15Learning ObjectivesElements of a h
 
A Public Private Partnership Approch to Climate Finance
A Public Private Partnership Approch to Climate FinanceA Public Private Partnership Approch to Climate Finance
A Public Private Partnership Approch to Climate Finance
 
Contracting for Services in Public Sector - 11 & 12 Aug - Canberra
Contracting for Services in Public Sector - 11 & 12 Aug - CanberraContracting for Services in Public Sector - 11 & 12 Aug - Canberra
Contracting for Services in Public Sector - 11 & 12 Aug - Canberra
 
Restoration as an economic enterprise and driver of job creation
Restoration as an economic enterprise and driver of job creationRestoration as an economic enterprise and driver of job creation
Restoration as an economic enterprise and driver of job creation
 
CEFI Roadmap for India workshop III
CEFI Roadmap for India workshop IIICEFI Roadmap for India workshop III
CEFI Roadmap for India workshop III
 
MR12CD Tuesday 13h00 - Sayed
MR12CD Tuesday 13h00 - SayedMR12CD Tuesday 13h00 - Sayed
MR12CD Tuesday 13h00 - Sayed
 
HPAC0003 Strategic Plan June 2015 FINAL
HPAC0003 Strategic Plan June 2015 FINALHPAC0003 Strategic Plan June 2015 FINAL
HPAC0003 Strategic Plan June 2015 FINAL
 
OECD Principles on Public-Private Partnerships
OECD Principles on Public-Private PartnershipsOECD Principles on Public-Private Partnerships
OECD Principles on Public-Private Partnerships
 
Case Study - Making the PMO the heart of the NHS Change Agenda
Case Study - Making the PMO the heart of the NHS Change AgendaCase Study - Making the PMO the heart of the NHS Change Agenda
Case Study - Making the PMO the heart of the NHS Change Agenda
 
FINANCING UNDER SME & CGTMSE
FINANCING UNDER SME & CGTMSEFINANCING UNDER SME & CGTMSE
FINANCING UNDER SME & CGTMSE
 
Coverage Bcp Profile 200904
Coverage Bcp Profile 200904Coverage Bcp Profile 200904
Coverage Bcp Profile 200904
 
Commissioning - Principles v5.1
Commissioning - Principles v5.1Commissioning - Principles v5.1
Commissioning - Principles v5.1
 
Scaling Climate Action through Technology and Innovation by SMEs for Green In...
Scaling Climate Action through Technology and Innovation by SMEs for Green In...Scaling Climate Action through Technology and Innovation by SMEs for Green In...
Scaling Climate Action through Technology and Innovation by SMEs for Green In...
 
Presentación resultados consulta electrónica organizada por Rimisp
Presentación resultados consulta electrónica organizada por RimispPresentación resultados consulta electrónica organizada por Rimisp
Presentación resultados consulta electrónica organizada por Rimisp
 
CEFI Roadmap Overview: John Dulac & Poonam Sandhu
CEFI Roadmap Overview: John Dulac & Poonam SandhuCEFI Roadmap Overview: John Dulac & Poonam Sandhu
CEFI Roadmap Overview: John Dulac & Poonam Sandhu
 
Decarbonisation Innovation Study
Decarbonisation Innovation StudyDecarbonisation Innovation Study
Decarbonisation Innovation Study
 
Final Report Decarbonisation Innovation Study
Final Report Decarbonisation Innovation StudyFinal Report Decarbonisation Innovation Study
Final Report Decarbonisation Innovation Study
 
13 tfm request-info_note_en1
13 tfm request-info_note_en113 tfm request-info_note_en1
13 tfm request-info_note_en1
 

Mais de Amanda Brinkmann

Thought piece about the dichotomies of life and living fragmentation systemic...
Thought piece about the dichotomies of life and living fragmentation systemic...Thought piece about the dichotomies of life and living fragmentation systemic...
Thought piece about the dichotomies of life and living fragmentation systemic...Amanda Brinkmann
 
South African Officially Registered tax base - One-view Perspective 2014
South African Officially Registered  tax base - One-view Perspective 2014South African Officially Registered  tax base - One-view Perspective 2014
South African Officially Registered tax base - One-view Perspective 2014Amanda Brinkmann
 
KULULA.COM - Case study Mini In-Class analysis - HAVING A BIT OF FUN WITH AN ...
KULULA.COM - Case study Mini In-Class analysis - HAVING A BIT OF FUN WITH AN ...KULULA.COM - Case study Mini In-Class analysis - HAVING A BIT OF FUN WITH AN ...
KULULA.COM - Case study Mini In-Class analysis - HAVING A BIT OF FUN WITH AN ...Amanda Brinkmann
 
AVOIDING THE " TRAGEDY OF THE COMMONS" IN SA FISHING INDUSTRY - A SIMPLIFIED...
AVOIDING THE " TRAGEDY OF THE COMMONS" IN SA FISHING INDUSTRY -  A SIMPLIFIED...AVOIDING THE " TRAGEDY OF THE COMMONS" IN SA FISHING INDUSTRY -  A SIMPLIFIED...
AVOIDING THE " TRAGEDY OF THE COMMONS" IN SA FISHING INDUSTRY - A SIMPLIFIED...Amanda Brinkmann
 
Indigo consulting amanda brinkmann comprehensive cv 2013 v 2
Indigo consulting amanda brinkmann comprehensive cv 2013 v 2Indigo consulting amanda brinkmann comprehensive cv 2013 v 2
Indigo consulting amanda brinkmann comprehensive cv 2013 v 2Amanda Brinkmann
 
Systemic Thinking [Williams, 2002:pgs 26-29], Bob Williams discusses his conc...
Systemic Thinking [Williams, 2002:pgs 26-29], Bob Williams discusses his conc...Systemic Thinking [Williams, 2002:pgs 26-29], Bob Williams discusses his conc...
Systemic Thinking [Williams, 2002:pgs 26-29], Bob Williams discusses his conc...Amanda Brinkmann
 
STRATEGIC AND BUSINESS ANALYSIS OF THE WESTERN CAPE DEPARTMENT OF HEALTH AND ...
STRATEGIC AND BUSINESS ANALYSIS OF THE WESTERN CAPE DEPARTMENT OF HEALTH AND ...STRATEGIC AND BUSINESS ANALYSIS OF THE WESTERN CAPE DEPARTMENT OF HEALTH AND ...
STRATEGIC AND BUSINESS ANALYSIS OF THE WESTERN CAPE DEPARTMENT OF HEALTH AND ...Amanda Brinkmann
 
Sustainability Assignment EDP USGSB - The Waste Hierarchy 2012
Sustainability Assignment EDP USGSB - The Waste Hierarchy 2012Sustainability Assignment EDP USGSB - The Waste Hierarchy 2012
Sustainability Assignment EDP USGSB - The Waste Hierarchy 2012Amanda Brinkmann
 
Reference rodney africa webber wentzel
Reference rodney africa webber wentzelReference rodney africa webber wentzel
Reference rodney africa webber wentzelAmanda Brinkmann
 
Reference dr leon gouws gvi
Reference dr leon gouws gviReference dr leon gouws gvi
Reference dr leon gouws gviAmanda Brinkmann
 
Reference anne van niekerk noah nov 2012
Reference anne van niekerk noah nov 2012Reference anne van niekerk noah nov 2012
Reference anne van niekerk noah nov 2012Amanda Brinkmann
 
Julie cleverdon sciencentre reference
Julie cleverdon sciencentre referenceJulie cleverdon sciencentre reference
Julie cleverdon sciencentre referenceAmanda Brinkmann
 
Reference pharmacy education international
Reference pharmacy education  internationalReference pharmacy education  international
Reference pharmacy education internationalAmanda Brinkmann
 
Reference ian mac farlane medi spa
Reference ian mac farlane medi spaReference ian mac farlane medi spa
Reference ian mac farlane medi spaAmanda Brinkmann
 

Mais de Amanda Brinkmann (15)

Thought piece about the dichotomies of life and living fragmentation systemic...
Thought piece about the dichotomies of life and living fragmentation systemic...Thought piece about the dichotomies of life and living fragmentation systemic...
Thought piece about the dichotomies of life and living fragmentation systemic...
 
South African Officially Registered tax base - One-view Perspective 2014
South African Officially Registered  tax base - One-view Perspective 2014South African Officially Registered  tax base - One-view Perspective 2014
South African Officially Registered tax base - One-view Perspective 2014
 
KULULA.COM - Case study Mini In-Class analysis - HAVING A BIT OF FUN WITH AN ...
KULULA.COM - Case study Mini In-Class analysis - HAVING A BIT OF FUN WITH AN ...KULULA.COM - Case study Mini In-Class analysis - HAVING A BIT OF FUN WITH AN ...
KULULA.COM - Case study Mini In-Class analysis - HAVING A BIT OF FUN WITH AN ...
 
AVOIDING THE " TRAGEDY OF THE COMMONS" IN SA FISHING INDUSTRY - A SIMPLIFIED...
AVOIDING THE " TRAGEDY OF THE COMMONS" IN SA FISHING INDUSTRY -  A SIMPLIFIED...AVOIDING THE " TRAGEDY OF THE COMMONS" IN SA FISHING INDUSTRY -  A SIMPLIFIED...
AVOIDING THE " TRAGEDY OF THE COMMONS" IN SA FISHING INDUSTRY - A SIMPLIFIED...
 
Indigo consulting amanda brinkmann comprehensive cv 2013 v 2
Indigo consulting amanda brinkmann comprehensive cv 2013 v 2Indigo consulting amanda brinkmann comprehensive cv 2013 v 2
Indigo consulting amanda brinkmann comprehensive cv 2013 v 2
 
Systemic Thinking [Williams, 2002:pgs 26-29], Bob Williams discusses his conc...
Systemic Thinking [Williams, 2002:pgs 26-29], Bob Williams discusses his conc...Systemic Thinking [Williams, 2002:pgs 26-29], Bob Williams discusses his conc...
Systemic Thinking [Williams, 2002:pgs 26-29], Bob Williams discusses his conc...
 
STRATEGIC AND BUSINESS ANALYSIS OF THE WESTERN CAPE DEPARTMENT OF HEALTH AND ...
STRATEGIC AND BUSINESS ANALYSIS OF THE WESTERN CAPE DEPARTMENT OF HEALTH AND ...STRATEGIC AND BUSINESS ANALYSIS OF THE WESTERN CAPE DEPARTMENT OF HEALTH AND ...
STRATEGIC AND BUSINESS ANALYSIS OF THE WESTERN CAPE DEPARTMENT OF HEALTH AND ...
 
Sustainability Assignment EDP USGSB - The Waste Hierarchy 2012
Sustainability Assignment EDP USGSB - The Waste Hierarchy 2012Sustainability Assignment EDP USGSB - The Waste Hierarchy 2012
Sustainability Assignment EDP USGSB - The Waste Hierarchy 2012
 
Reference rodney africa webber wentzel
Reference rodney africa webber wentzelReference rodney africa webber wentzel
Reference rodney africa webber wentzel
 
Reference dr leon gouws gvi
Reference dr leon gouws gviReference dr leon gouws gvi
Reference dr leon gouws gvi
 
Reference chaeli campaign
Reference chaeli campaignReference chaeli campaign
Reference chaeli campaign
 
Reference anne van niekerk noah nov 2012
Reference anne van niekerk noah nov 2012Reference anne van niekerk noah nov 2012
Reference anne van niekerk noah nov 2012
 
Julie cleverdon sciencentre reference
Julie cleverdon sciencentre referenceJulie cleverdon sciencentre reference
Julie cleverdon sciencentre reference
 
Reference pharmacy education international
Reference pharmacy education  internationalReference pharmacy education  international
Reference pharmacy education international
 
Reference ian mac farlane medi spa
Reference ian mac farlane medi spaReference ian mac farlane medi spa
Reference ian mac farlane medi spa
 

Último

Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 

Último (20)

VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 

IMPROVING FINANCIAL EFFICIENCIES, SERVICE DELIVERY AND PATIENT-CENTRICITY BY CONSIDERING ALTERNATIVE FINANCE STRATEGIES, CAPITAL STRUCTURE POLICY, GREEN PROCUREMENT POLICY AND TRIPLE-BOTTOM LINE PARTNERSHIPS AN ANALYSIS OF THE RISKS AND REWARDS OF INNOVA

  • 1. ASSIGNMENT COVER PAGE SURNAME: Brinkmann INITIALS: A STUDENT NUMBER: 17573602 TELEPHONE NUMBER: 0828900663 PROGRAMME NAME: EDP 2012 MODULE: Financial Strategies FACILITATOR: Prof Dave Flynn DUE DATE: 25 September 2012 NUMBER OF PAGES: 39 CERTIFICATION I certify the content of the assignment to be my own and original work and that all sources have been accurately reported and acknowledged, and that this document has not previously been submitted in its entirety or in part at any educational establishment. _________________________ SIGNATURE OR 6701130018085 _________________________ ID number for assignments submitted via e-mail FOR OFFICE USE DATE RECEIVED:
  • 2. REPORT AND RECOMMENDATIONS PREPARED FOR CONSIDERATION BY THE EXECUTIVE MANAGEMENT COMMITTEE: WESTERN CAPE DEPARTMENT OF HEALTH [WCDOH] 25 SEPTEMBER 2012 IMPROVING FINANCIAL EFFICIENCIES, SERVICE DELIVERY AND PATIENT-CENTRICITY BY CONSIDERING ALTERNATIVE FINANCE STRATEGIES, CAPITAL STRUCTURE POLICY, GREEN PROCUREMENT POLICY AND TRIPLE-BOTTOM LINE PARTNERSHIPS AN ANALYSIS OF THE RISKS AND REWARDS OF INNOVATING TO STRETCH THE HEALTH RAND PREPARED BY: AMANDA BRINKMANN ADVISER TO THE MINISTER OF HEALTH: WESTERN CAPE GOVERNMENT HEAD OF STRATEGIC PARTNERSHIPS: WESTERN CAPE GOVERNMENT 2|Page
  • 3. TABLE OF CONTENT 1. Executive Summary 1.1 Agreement, Implications and Considerations 1.2 Decisions Required 1.3 Acknowledgements 2. Problem Statement 3. Objectives 4. Methodology and Approach 5. Existing Financial Strategy, Procurement Policy and Operational Realities: WCDOH 6. Finance Strategy and Procurement Policy Alternatives and Opportunities: Discussion 6.1 Zero-based and Activity-based Budgeting 6.2 Finance Decisions and Optimal Capital Structure 6.2.1 Gearing or Leverage 6.2.2 Financial Instruments 6.2.3 Establishing the full value of assets 6.3 Upfront purchase of Maintenance Contracts 6.4 Green Procurement 7. Operating Lease 7.1 General Advantages of an Operating Lease 7.2 Key Benefits of Operating Leasing to WCDOH 7.2.1 Financial Evaluation and Benefits of Operating Leasing 7.2.2 Proposed Structure of Operating Leasing Agreements 7.2.3 Cost Reductions, Benefits, Savings: Accruing to WCDOH 8. Conclusions 9. Recommendations 10. References 11. Glossary of Terms and Annexures 3|Page
  • 4. 1. EXECUTIVE SUMMARY This document summarises the potential risks and rewards to the WCDOH, of procuring high- value assets by using operating leases instead of by way of once-off cash procurement as is currently standard policy. Alternative finance strategies and procurement policy is proposed for consideration, including the incorporation of Green Procurement policy. Operating leasing is situated within the context of the range of provincial objectives and includes considerations of Extended Producer Responsibility, Life-cycle costing and usage analysis and eventual disposal management. The report furthermore deals with Corporate Social Investment [CSI], Triple Bottom Line strategic partnerships as an extension to this procurement option and the potential added value that could accrue to the WCDOH, its employees and patients, over time. 1.1 Agreements, implications and considerations 1.1.1 An asset/equipment backlog exists generally within the WCDOH, but specifically at the three [3] Tertiary, Central Hospitals: Groote Schuur Hospital, Tygerberg Hospital and Red Cross Hospital. 1.1.2 Some, or all, of the facilities managed by the WCDOH have a shortage of equipment and/or ageing or obsolete equipment that need to be upgraded or replaced. 1.1.3 There are real costs, financial and non-financial, associated with the lack of necessary equipment in certain facilities. 1.1.4 The budget allocated by Treasury to the WCDOH is currently not sufficient to meet the annual equipment demands of all facilities, and by inference, insufficient to reduce and/or eliminate the existing backlog. [ Annexure C. Botha, T. 26 March 2012] 1.1.5 Strategic Partnerships, efficiency, innovation, stretching the healthcare rand and patient-centricity are all at the very heart of achieving the objectives of the WCDOH. [ Annexure C. Botha, T. 26 March 2012] 1.1.6 The WCDOH only wishes to consider operating leases and NOT finance leases. 1.1.7 Possible assets which could be leased, if this route were followed, would be limited to: a) High-value, high redundancy, high maintenance, high technology assets, required at the three Central [Tertiary, Educational] Hospitals and other facilities b) Transversal IT systems of hardware and or networks or systems which would support the WCDOH Information Management data capabilities. 1.1.8 The process must adhere to all of the relevant regulatory frameworks and the WCDOH‟s existing procurement process must be enhanced. 1.1.9 The “Essential Equipment List” for Central, Regional and District Hospitals and clinics is also considered, as well as the transversal IT requirements. This would imply that such asset planning should extend beyond the Medium Term Expenditure Framework [MTEF].[ www-personal.umich.edu] 4|Page
  • 5. 1.2 DECISIONS REQUIRED 1.2.1 Principle agreement to pursue alternative finance strategy, procurement policy and operating leasing along with triple bottom line partnerships within WCDOH. 1.2.2 Principle agreement to allow for individualized projects and case studies to be conducted, under empirical conditions and within regulatory and policy frameworks, so as to evaluate the qualitative, quantitative, tangible as well as intangible benefits of operating leasing and alternative finance and procurement strategy over time. 1.3 ACKNOWLEDGEMENTS This document is the culmination of a year-long investigative process that has involved interrogation of data, research, interviews, robust debates, lobbying and hard work, dedication and passion from a great many people. In no specific order, I wish to acknowledge the following people:  Minister of Health, Mr Theuns Botha and Head of Department: WCDOH, Prof Househam, for having the vision and foresight to provide the mandate for the exploratory process.  Mr Mike Loverock: Independent Financial Analyst – for assisting with the creation of the financial models and scenarios.  Mr Isaac Smith: Head of Procurement: WCDOH – for bringing his experience, knowledge, skills and wisdom to bear whenever required.  Messrs Van Niekerk, Jooste and Manning: Financial Management team: WCDOH – for their openness to engage with new, innovative and different ideas and concepts.  Manufacturers and suppliers of medical and other high technology equipment – for their inputs regarding mechanisms that would add value to the procurement and life-cycle of assets.  Various officials, managers, role players and staff within Level 2 and 3 health facilities as well as senior officials and management within WCDOH Head Office, too many to mention by name - for their input in terms of desirability, feasibility and viability. The intent remains for this to be a living document as we move towards becoming the Learning Organisation [Liao, S. H., Chang, W. J., Wu, C. C., & Katrichis, J. M. 2011]. The hope is to arrive at a policy solution which would deliver against the range of objectives of the WCDOH, whilst mitigating any potential future financial and environmental risks. The report and recommendations if adopted in its entirety will lead to the more effective use of capital, reduction in costs and increases in available budget or free cash flow to WCDOH. AMANDA BRINKMANN Special Adviser to the Minister of Health & Leader of Government Business HOD: Strategic Partnerships: Western Cape Government 5|Page
  • 6. 2. PROBLEM STATEMENT 2.1 An asset/equipment backlog exists generally within the WCDOH, but specifically at the three Tertiary, Central Hospitals. 2.2 Some, or all, of the facilities managed by the WCDOH have a shortage of equipment and/or ageing or obsolete equipment that need to be upgraded or replaced. 2.3 There is particular need, as evidenced by the attached proposal titled: Strengthening of the Surgical Platform: Western Cape Department of Health. [Brinkmann, A. November 2011] for surgical theatres, suites and training facilities to be upgraded. 2.4 There are real costs, financial and non-financial, associated with the lack of necessary equipment or the presence of ageing, inefficient, sub-optimal equipment in certain facilities. 2.5 The budget allocated by Treasury to the WCDOH is currently not sufficient to meet the annual equipment demands from all facilities, and by inference, insufficient to reduce and/or eliminate the existing backlog. [ Annexure C. Botha, T. 26 March 2012] 2.6 National Treasury has issued a notice indicating a tightening of the budgetary envelope. The estimated time horizon is anticipated to be three to five years. [National Treasury Department: South Africa. August 2012] 2.7 Notwithstanding the above, negative impact on service delivery is not an option as is evidenced by the Strategic Objective Four of the WCDOH as set out within the Annual Performance Plan 2012/13[Annexure D: Western Cape Department of Health. March 2012] as well as with the spirit, content and objectives of Vision 2020 [Annexure B: WCDOH. November 2011]. This is reiterated within the content of the WCDOH Budget Speech 2012. [Annexure C. Botha, T. 26 March 2012] 2.8 There is an acute shortage of doctors and nurses in South Africa and Minister Aaron Motsoaledi, National Minster of Health, has committed to the training of additional clinical staff and the upgrade of facilities [Child, K. 11 Oct 2011]. 3. OBJECTIVES Through innovation in financial, procurement and strategic partnership strategies and policies, within severe budgetary constraints, ensure improved delivery of the various strategic objectives and service delivery outcomes of WCDOH as well as those of the Western Cape Government [WCG] as a whole, without compromising either the present or future delivery of such services. 6|Page
  • 7. 4. METHODOLOGY AND APPROACH 4.1 The existing capital structure [Flynn, D.2009. Chapter 13-3] and capital budgeting structure [Flynn, D. 2009. Chapter 14-3] of WCDOH was interrogated and evaluated in respect of efficiency and effectiveness. 4.2 The Five Principles of Financial Viability [Flynn, D. EDP 2012. Slide 26] were borne in mind, adjusted for governmental circumstances. 4.3 The existing „Essential Equipment List‟ was assessed against what is required in reality and adapted accordingly. 4.4 The benefits of new assets as well as replacement assets have been sufficiently quantified for comparison against the opportunity cost of incurring finance costs. 4.5 Various pieces of legislation, policies, regulations, practice notes, strategies and plans, as referenced within and annexed to this report were interrogated and reviewed. 5. EXISTING FINANCIAL STRATEGY, PROCUREMENT POLICY and OPERATIONAL REALITIES: WCDOH In summary, WCDOH currently employs the following financial strategies and policies: 5.1 Historic, Incremental Budgeting or Capped Budgeting 5.2 Working Capital Structure allows for the purchase of fixed assets mainly via outright cash purchase 5.3 Valuation and Value are not quantified on the principles of risk and return in finance 5.4 Useful life of assets and operational maintenance are not adequately planned and budgeted for 5.5 Budget priorities are not necessarily reflective of changing service delivery needs and requirements 6. FINANCE STRATEGY AND PROCUREMENT POLICY ALTERNATIVES and OPPORTUNIES: DISCUSSION 6.1 ZERO-BASED & ACTIVITY BASED BUDGETING A hybridized version of a zero-based and activity based budgeting approach would allow for the budget to be built around what is needed to deliver on the objectives of WCDOH. 6.2 FINANCE DECISIONS AND OPTIMAL CAPITAL STRUCTURES 6.2.1 Gearing or Leverage An optimal capital structure strikes a delicate balance between cash funding and funding from debt. An element of gearing or leverage, at a moderate level, could have the ability of bringing 7|Page
  • 8. future procurement into the present. Long-term assets should ideally be procured via long-term finance. Benefits and use are realized over time. [Flynn, D. 2009] 6.2.2 Financial instruments Operational Leasing could fast-track the procurement of high technology, high maintenance, high redundancy and high value equipment. Innovative contractual agreements between WCDOH, Lessors and suppliers of assets could provide considerable added value. 6.2.3 Establishing the full value of assets New techniques to establish the value of assets should be agreed based on the principles of risk and return in finance. 6.3 UPFRONT PURCHASE OF MAINTENANCE CONTRACTS WCDOH could purchase maintenance contracts up-front. This could lead to savings of up to 25%. [Lipsitz, N. 6 October 2011] 6.4 GREEN PROCUREMENT The White Paper on Greening the Procurement of Goods and Services within the Western Cape Government [The Department of Environmental Affairs and Development Planning: Western Cape Government. 21 June 2011] provides as follows: 6.4.1 Life-cycle analysis, costing, planning, sustainability and resource efficiency so as to prolong the useful life of assets and re-use as long as possible. 7. OPERATING LEASE In general, leasing is based on the concept that for the purpose of production / service delivery, the determining factor is not the ownership of the assets to be acquired, but rather their availability for use. [National Treasury.1 April 2000] 7.1 GENERAL ADVANTAGES OF AN OPERATING LEASE 7.1.1 Creating free cash flows within a budgetary constrained environment 7.1.2 Spreading the Cost by initially paying for use, thereby matching the costs of an asset against the asset‟s future economic service potential 7.1.3 Complete Finance 7.1.4 Flexibility to add to or upgrade the asset base when required 7.1.5 Vendor Independence 7.1.6 Acceleration of service delivery projects via gearing 7.1.7 Transparency in contracting which improves governance [www.fao.org. Accessed August 2012] 8|Page
  • 9. 7.2 KEY BENEFITS OF OPERATING LEASING TO WCDOH 7.2.1 FINANCIAL EVALUATION and BENEFITS OF OPERATING LEASING Annexure F: TABLE ONE: OPERATING LEASING BENCHMARK SCENARIO MODEL REFERS The financial model was built on the following assumptions:  WCDOH CAPEX budget for equipment is set at R200 million per annum.  Budget growth: 5% per fiscal, which effectively neutralises inflation.  Of the R200 million 2011/2012 budget, 50% [R100 million] is allocated to the procurement of high value assets.  WCDOH determines to acquire equipment to the value of R75 million via operating leasing and the balance of R25 million via outright cash purchase.  The equipment identified as appropriate for rental has an estimated minimum useful life of seven years. To ensure the highest level of healthcare delivery, such equipment will be replaced at the end of year five, but will continue in use at a separate / tier two facility for its remaining economic life.  All rates used in the cash flow evaluation are at market rates as at April 2011. Western Cape - Department of Health Capital Expenditure Budget 2011 – 2016 Annual increase 5% 2011/2012 1. Allocation for low-value equipment and other assets 100 000 000 2. Allocation for big-ticket assets * 100 000 000 Budgeted Expenditure 200 000 000 Cash Flows Annual Budget 2011/2012 100 000 000 Cumulative 0 Rental Cash Flows 2011/2012 (17 601 918) Cumulative 0 Cash Differential Current Year 82 398 082 Cumulative 0 Less: (assets not rented) Current Year (25 000 000) Available Cash: Current Year 57 398 082 Cumulative 82 398 082 9|Page
  • 10. The table and its summary above are interpreted as follows: 7.2.1.1 From the rental cash flow in 2011/2012 costs of only R17.6 million is incurred. 7.2.1.2 This creates a potential for gearing, at an applied factor of 4.5 (75 million / 17.6 million. 7.2.1.3 This form of acceleration may be imprudent on an annual basis, because of the cumulative effect of rental payments on succeeding years‟ budgets. 7.2.1.4 Acceleration in the 2011/2012 and again in the 2014/2015 budget years have been assumed, with the cash flow effects thereof running through until the 2018/2019 budget year. 7.2.1.5 Consistent with the analysis for the 2011/2012 year, a surplus cash position of approximately R50 million is reflected for the 2014/2015 year, which in turn creates the ability for WCDOH to once more accelerate the procurement of equipment. 7.2.1.6 A financing strategy of this nature could be regarded as a moderate approach to asset procurement, within which there are countless permutations. 7.2.1.7 A vital component in the strategic decision-making process in general, but specifically in this regard, is the potential cost savings that accrue to the WCDOH. 7.2.2 PROPOSED STRUCTURE OF OPERATING LEASING AGREEMENTS  The Lessor [who is vendor-independent] will purchase the assets from the supplier/s selected by WCDOH at the best possible price, and  The Lessor will negotiate a discounted up-front maintenance/service contract,  The Lessor will include Extended Producer Responsibility into the contract,  The Lessor and Vendor agree to redeploy assets into lower-tier health facilities at their cost, which costs shall include transport, installation, full maintenance and training of clinical staff, where relevant  The Lessor will lease such assets to WCDOH at a fixed rate and over an agreed term, and  The Lessor, through a separate corporate social investment agreement with The Health Foundation, donates leased assets to the WCDOH, at the end of the agreed lease period. 10 | P a g e
  • 11. 7.2.3 COST REDUCTIONS, BENEFITS, SAVINGS: ACCRUING TO WCDOH From a purely [and very limited] financial perspective, I would suggest that the acid test here is to obtain comfort that the cost savings and benefits that accrue, at least exceed the costs of finance. 7.2.3.1 Ability to purchase up to four times more equipment by gearing moderately in specific budgetary period 7.2.3.2 Creating free cash flows within the specific period so as to assist with service delivery within financially constrained circumstances 7.2.3.3 By having state-of-the-art equipment at teaching hospitals, the ability to attract, train and retain the best possible clinical talent in the province and country 7.2.3.4 By upgrading the surgical platform alone, it is anticipated that vast savings in respect of patient experience, recovery, reduction in bed days, post-operative morbidity and mortality would be achieved 7.2.3.5 The value of bringing future delivery into the present via sound finance and procurement policies 7.2.3.6 Over time, replace obsolete and ageing equipment with sustainable, energy-efficient assets 7.2.3.7 Inclusion of Extended Producer Responsibility into contractual agreements ensures that the useful life the asset is extended as far as possible and that the cost of disposal is vested in the producer 7.2.3.8 By planning for the acquisition of assets over the MTEF, a five, seven and ten year horizon can be constructed; planning for the redeployment of assets to lower- tiered facilities could be included into such planning 7.2.3.9 The cost of relocation, installation and training of staff related to assets will be borne by the producer 7.2.3.10 Lower-tiered facilities will, over time, be able to diagnose and treat patients in situ, thereby improving prognosis and overall patient outcomes, potentially saving the health system considerable costs attached the late detection and treatment of certain conditions 7.2.3.11 Savings related to the reduction in the maintenance division and budget of the WCDOH over time as well as savings related to the up-front procurement of maintenance contract, acting to mitigate finance costs over the term 7.2.3.12 Savings in transport of patients via Health Net – fuel, driver, support staff salaries and consumables used en route 7.2.3.13 Hospitalisation costs at the facility to which the patients would have been taken, which may include more bed days than would otherwise have been necessary 7.2.3.14 Savings in loss of man days [ and the costs thereof] related to providing at treatment at facilities that are remote from the patient‟s home 7.2.3.15 General improvement of the patient experience and a complete move towards the stated goal of patient-centricity by equipping the health network with improved capacity and diagnostic abilities closer to where the patient is 7.2.3.16 Demand management, Disposal Management, Extended Producer Responsibility, Full-life cycle assessment, costing and planning and contractual innovations would optimize capital expenditure and asset acquisition 7.2.3.17 Improved staff morale and motivation over time 11 | P a g e
  • 12. 8. CONCLUSIONS 8.1 The existing planning, finance strategy and procurement policies within WCDOH are not optimised to deliver against the changing service delivery needs of patients as well as clinicians. 8.2 The very constrained budgetary environment necessitates looking at new and innovative capital and finance structuring methodologies. 8.3 To achieve societal outcomes, there is a shift towards partnering via the sustainability platform as is evidenced by the findings attached to the establishment of The Health Foundation [ Ernst & Young. 9 February 2012. Annexure A] as well as the outcomes of the UN Global Compact/Accenture CEO survey[Lacy, P; Cooper, T; Hayward, R; Neuberger, L. June 2010]. 8.4 Green procurement policy and principles provide significant additional opportunities to save costs and improve efficiencies. [DEADP. 21 June 2011] 8.5 There is a compelling case to be made for the use of Operating Leasing and the proposed contractual structure so as to accelerate service delivery and reduce the existing equipment/asset backlog. 8.6 Such policy has the potential to benefit other departments within WCGOV. Department of Education and the acquisition and renewal of ICT infrastructure spring to mind. 8.7 The proposed gearing factor of 4.5 could in essence accelerate asset procurement by more than 100% every 3 years. 8.8 By implementing a prudent and moderate operating leasing procurement strategy, significant long term savings and benefits could accrue to the WCDOH, its patients and employees. 8.9 The proposed upgrade of the Surgical Platform in the province, with further reference to the acquisition of equipment and training in Laparoscopy or Minimally Invasive Surgeries [Heisler, J. January 2012.] could lead to significant cost-savings to the health system as well as improved patient outcomes. This is evidenced by the outcomes of a range of global studies.[Braga, M. et al. Dec 2005]; [Rodriguez, A et al. January 2011.];[Maslekar, S. et al.March 2007.]; [Roumm, AR. Pizzi, L et al. March 2009.]; [Goldsmith, H. Herman, L. January 2002.] 8.10 It goes without saying that any form of funding [bond, loan, finance lease, operating lease] carries a financing cost. The WCDOH budget, which is allocated from Treasury, of course does not carry such a cost, at least not to the WCDOH. 8.11 If the only analysis undertaken is to compare the allocated cash [per the WCDOH budget] to any form of debt financing, and the end objective of the analysis is the 12 | P a g e
  • 13. quantum of assets that can be acquired over time, by definition cash will always prevail, by virtue of the financing costs of debt. 8.12 Additional assets made possible through the use of alternate finance strategies, whilst not generating income, could have a material impact on reducing costs. 8.13 Examples of these costs are dealt with in the main document, and should be identified within the operating budget, and quantified. These could correctly be considered hard cash savings that accrue to the WCDOH, and a tangible benefit. 8.14 A meaningful and correct analysis in comparing a cash purchase to an operating lease solution is then to include a line in the budget in which these cost savings are recorded. 8.15 Properly managed financing costs can be seen as the price that the WCDOH pays for the ability to bring the procurement of essential medical equipment from future years into the now. Coupled to this ability, is the concomitant reduction in associated expenses. 8.16 We have to shy away from a purely rands and cents analysis when considering the cost benefits of employing a moderate operating leasing strategy. 8.17 Whilst an operational lease is subject to compound interest over the lease period, this cost should ideally be weighed up against the short-to mid-term benefits as described within this report. 8.18 Although difficult, it would be useful to compare the full, actual cost of assets procured by cash over the complete useful life of the asset. 8.19 Assets are generally „sweated‟ for as long as possible, but the cost of running an operational maintenance unit is not factored in, accounted or budgeted for adequately. [Gartner Group. 2003]. The complete cost of ownership of state assets is therefore not known. 8.20 The proposed new standard for leases moves away from the current „risk and returns‟ basis to a „right of use‟ basis. This adjustment would make accounting for leases more congruent with the Conceptual Framework for Financial Reporting 2010, as drafted by the International Accounting Standard Board. [IASB.2010] 8.21 By continuing on a „ business-as-usual‟ path, the backlogs in equipment will not be addressed and this would have material impact on the ability of WCDOH to achieve its strategic objectives. 13 | P a g e
  • 14. 9. RECOMMENDATIONS Given the constrained budgetary environment, the range of strategic objectives as iterated by the WCDOH as well as Western Cape Government in general and the need to innovate so as to stretch the health rand, the following recommendations are made for consideration by the Committee: 9.1 Zero-based and activity based budgeting to establish the real needs as required to deliver against the objectives of WCDOH, specifically as those deliverables would up operational efficiences, save costs in the longer term, improve quality and access to services and be focused entirely on patient-centricity. 9.2 Based on the latter activity, develop a phased, rolling 10-year asset procurement plan, that would seek to address the most immediate priorities over time. 9.3 These priorities would, in the main, be related to high technology, high redundancy, high maintenance and high value assets. This should include ICT and management information infrastructure. 9.4 Explicit rules need to be established which define the potential assets which would be considered. 9.5 Key priority requirements should be projectised. 9.6 Such projects and case studies would be decided based on the necessity of the procurement of such equipment so that such procurement aligns with delivery of the Strategic Objective Four [ 4] of the WCDOH as set out within the Annual Performance Plan 2012/13[Annexure D:Western Cape Department of Health. March 2012] as well as with the spirit, content and objectives of Vision 2020 [Annexure B: WCDOH. November 2011]. Such projects would furthermore be guided by the content, intent and spirit of the WCDOH Budget Speech 2012. [ Annexure C. Botha, T. 26 March 2012] 9.7 Certain projects, such as for instance the upgrading of the Surgical Platform in the province, could be managed by the Strategic Partnerships portfolio in collaboration with The Health Foundation. This recommendation is based upon the fact that a significant number of suppliers, manufacturers and donor partners have already indicated their support for such a project. The balance of funds which are not secured via such partnerships and donations could be financed by WCDOH. 9.8 Operating Leasing, used in a moderate and pragmatic manner should be adopted as part of the WCDOH‟s finance and procurement policy and strategy. 9.9 The proposed structure of the Operating Leasing agreement, as proposed within this report should be adopted and all contracts negotiated on this basis so that the full added value benefits to WCDOH and its patients are realised over time. 9.10 The benefits of new as well as replacement assets must be quantified in order to assess this cost against the opportunity cost of incurring finance costs. 14 | P a g e
  • 15. 9.11 Factors, including: Net Present Value calculation should include, amongst others: * Value of the asset * Funds being paid * Maintenance costs * Administration costs* Potential staffing costs * Disposal value/cost of asset used * Environmental costs* Input materials and resources required to operate the asset * Capital cost of the asset* Positive cash flows that the asset is expected to generate, net of financing costs *Changes to working capital requirements 9.12 Other than cash flows as basis for the valuation technique, other factors, such as the capacity to influence existing and future service delivery, capacity to influence future cash flows, capacity to generate present and future benefits, rewards or savings, timing of cash flows and impact of the investment on the business operations should be taken into consideration. WCDOH must appropriately evaluate whether the benefits of ownership of equipment or assets in the present, seem to be greater than the wealth foregone, expressed as the price. We should establish whether the total exchange price is in reality lower than the value or worth of the asset to WCDOH. 9.13 Accounting for leases must be congruent with the Conceptual Framework for Financial Reporting 2010, as drafted by the International Accounting Standard Board [IASB] as well as Finance Instruction G22/2009. [Jooste, J. 27 March 2009] 9.14 Finally, it is my assessment, based on all of the information gathered, assessed, interrogated and discussed over the past year, subject to internal compliance issues being satisfied, that an Operating Lease methodology as proposed within this report can generate compelling and very real benefits to the WCDOH and should therefor form part of the overal finance, procurement and funding strategy. 9.15 In general, the Finance, Investment and Capital structures of WCDOH should be reviewed so as to be in more in keeping with the delivery of the strategic objectives of the Western Cape Government, The Western Cape Department of Health and with the changing service delivery and business landscapes. The report and recommendations if adopted in its entirety will lead to the more effective use of capital, reduction in costs and increases in available budget or free cash flow to WCDOH. 15 | P a g e
  • 16. 10. REFERENCES: FINANCIAL STRATEGIES REPORT AND RECOMMENDATIONS Botha, T. 26 March 2012. Western Cape Health Budget Speech 2012 by Mr Theuns Botha, Minister of Health at Western Cape Provincial Legislature Braga,M.et al. December 2005. Laparoscopic versus open colorectal surgery: cost-benefit analysis in a single center randomized trial. Campbell, R. H. 2012. http://financial-dictionary.thefreedictionary.com/Finance+Lease. Define: Financial Lease. Accessed August 2012 Child, K. 11 Oct 2011. Health Minister promises more doctors and nurses. www.mg.co.za. Accessed September 2012 Enterprise Financial Solutions. 2012. Definition of Operating Lease Ernst & Young. 9 February 2012. The Health Foundation: The Journey Thus Far. Presentation format. Flood, R.1999. Rethinking the Fifth Discipline: Learning from the Unknowable. Flynn, D. EDP 2012. Financial Strategies Presentation document. Flynn, D. 2009. Understanding Finance & Accounting. Chapter 6. Pg 27. 6. Non-financial issues in analysis; 6.1 The Balanced Scorecard Gartner Group. 2003. Total Cost of Ownership model. Goldsmith, H. Herman, L. January 2002. Endoluminal gastroplication. A new therapeutic endoscopic procedure for gastro-esophageal reflux disease. Heisler, J. January 2012. Definition of Laparoscopic Surgery. About.com Guide. Accessed August 2012 http://www.businessdictionary.com/definition/positive-cash-flow.html. Define: Positive Cash Flows. Accessed September 2012 http://www.fao.org/docrep/W4343E/w4343e08.htm. Basic Finance for Marketers. Advantages of Operating Leases. Accessed August 2012. http://www.investopedia.com/terms/n/npv.asp. Define: Net Present Value [NPV]. Accessed August 2012. http://www.investopedia.com/terms/o/operatinglease.asp. Define: Operating Lease. Accessed August 2012. 16 | P a g e
  • 17. http://www-personal.umich.edu/~alandear/glossary/m.html#mtef2. Definition: Medium Term Expenditure Framework [MTEF]. Accessed September 2012 International Accounting Standards Board [IASB]. 2010. The Conceptual Framework for Financial Reporting. www.ifrs.org. Accessed August 2012 Jooste, J.M. March 2009. Finance Instruction G22/2009. Classification of Lease Agreements in the Standard Chart of Accounts as well as the Reporting on Lease commitments at the end of each financial year. Lacy, P; Cooper, T; Hayward, R; Neuberger, L. June 2010. A New Era of Sustainability. UN Global Compact Accenture CEO Survey study 2010. ; CEO reflections on progress to date, challenges ahead and the impact of the journey toward a sustainable economy. Liau, S.H.,Chang, W.J., Wu, C.C. & Katrichis, J.M. 2011. A survey of market orientation. Lipsitz, N. 6 October 2011. CT Tender: Savings on upfront maintenance contracts: Siemens and City of Cape Town Maslekar, S. et al. March 2007. Cost analysis for trans-anal endoscopic micro-surgery for rectal tumours National Treasury Department: South Africa. August 2012. Medium Term Expenditure Framework Guidelines. Preparation of Expenditure Estimates for the 2012 Medium Term Expenditure Framework. National Treasury: South Africa. Public Finance Management Act No. 1 of 1999 [PFMA]. Date of commencement: 1 April 2000. Updated to Government Gazette 33059, 1 April 2010. Public Finance Management Act No1. Of 1999 [PFMA]. Date of Commencement: 1 April 2000. Gazette#25915. Public-Private Partnerships issued in terms of the Public Finance Management Act. Treasury Regulation 16. Rodriguez, A et al. January 2011. Providing endoscopy for underserved patients benefits public health and resident education. Roumm, AR. Pizzi, L et al. March 2009. Minimally invasive: minimally reimbursed? An examination of six laparoscopic surgical procedures. The Department of Environmental Affairs and Development Planning [DEADP]: Western Cape Government. 21 June 2011. Draft White Paper on Greening the Procurement of Goods and Services within the Western Cape Government. Provincial Gazette Extraordinary No. 6880 Vancock, H. 2007. "Dimensions of sustainability". Journal of Engineering for Sustainable Development: Energy, Environment, and Health 2 (1): 47–57. Western Cape Department of Health [WCDOH]. November 2011. 2020 –The Future of Health Care in the Western Cape. A Draft Framework for Dialogue 17 | P a g e
  • 18. Western Cape Government Department of Health. March 2012. Health Annual Performance Plan 2012/13. www. Westerncape.gov.za/health. Accessed March 2012. 18 | P a g e
  • 19. 11. GLOSSARY OF TERMS and ANNEXURES GLOSSARY OF TERMS 1. Non-financial issues in analysis This methodology takes issues of interest and benefit to a variety of stakeholders into account, which issues may not be directly viewed as being able to be measurable in financial terms. These issues nonetheless add value and so to provide a complete analysis, should be considered as part of emergence: the whole being larger than the sum of the parts. [Flynn, D. 2009] This requires systemic evaluation rather than the quite one-dimensional practices that are often used in analysis models and requires a leap from current conservative measurement metrics to William Flood‟s integrated model of systems thinking, design and systemic evaluation. [Flood, R.1999] 2. The Balanced Scorecard The Balanced Scorecard focuses not only on the financial outcomes, but also on the operational, marketing and developmental facets of a company/organisation. This tool links the objectives and strategies of the organisation to measurable outcomes, but not only in financial terms. One of the main challenges for financial management is to identify and agree on the strategies that would achieve the overall goals and objectives of the organisation via a process of strategy mapping. The further challenge is inherent in apportioning weighted values or quantum‟s to such non- financial outcomes. [Flynn, D. 2009] 3. The Triple Bottom Line People. Profit. Planet. In her article, titled, Dimensions of Sustainability, published in the Journal of Engineering for Sustainable Development, Energy, Environment and Health, Hasna Vancock [ Vancock, H. 2007] speaks to the fact that sustainability is a process – this process deals with the development of all aspects of human life that affects sustenance. This process involves constantly trying to balance conflicting goals, objectives and interests and involves the simultaneous pursuit of economic prosperity, environmental quality and social equity, known as the three dimensions or the Triple bottom line. Triple Bottom Line Reporting is fast becoming mandatory for listed companies and government. 4. Finance Lease A agreement where the lessor receives lease payments to cover its ownership costs. The lessee is responsible for maintenance, insurance and taxes. Some finance leases are conditional sales or hire purchase agreements. [Campbell, R.H. 2012] 5. Operating Lease A contract that allows for the use of an asset, but does not convey the rights of ownership of the asset to the lessee. An operating lease is not capitilised; it is accounted for as rental expense in what is known as „off balance sheet financing‟. For the lessor, the asset being leased is accounted for as an asset and depreciated as such. Operating leases result in assets or liabilities not being recorded on the lessee‟s balance sheet. This can improve the lessee‟s financial ratios. [http://www.investopedia.com/terms/o/operatinglease.asp] 19 | P a g e
  • 20. 6. Capital Structure Capital is a scarce commodity. The objective of business management is to create value and add value by the correct allocation of scarce resources. There are two primary ways in which capital is used to return in an operating business. These are investments in fixed assets and in current assets that are referred to as working capital items. Financial Management has to align the capital structure of an organisation [debt; equity; cash; liquidity] to achieve the objectives, strategies and desired outcomes of the business most optimally. [Flynn, D. 2009. Chapter 13-3] 7. Capital Budgeting In the case of government, capital budgeting is the process of evaluating projects that generate improvements in service delivery outcomes and that align with the achievements of the Strategic Objectives of a particular department and the provincial government as a whole. In its broadest sense, the term is used for any expansion or replacement decision. All of the principles of capital investing are pertinent to capital budgeting. The capital investment decision must earn the required return on investment in order to add value or by adding value to the activities of the organisation. Capital budgeting decisions are generally considered to be more risky than working capital decisions, because capital budgeting decisions carry long-term commitments of funds and are not easily reversed if they prove to be unsuccessful. [Flynn, D. 2009. Chapter 14-3] 8. Net Present Value [ NPV] This methodology compares the value of a rand today to the value of the same rand in the future, taking inflation and returns into account. If the NPV of a prospective project is positive, it should be accepted. Conversely, if NPV is negative, the project should probably be rejected because cash flows may also be negative. [www.investopedia.com] 9. Positive cash flow Creating a situation where cash inflows during a period are higher than the cash outflows during the same period. Positive cash flow, in the case of government, does not mean profit. It is achieved due to the careful management of cash inflows and expenditure. [www.thebusinessdictionary.com] The Capital Structure [Flynn, D. 2009. Chapter 13-3] plays a large role in determining an organisation‟s positive or free cash flows. 10. Working capital policies and management Financial managers constantly grapple with decisions relating to risk and return in all aspects of the business. Working capital is no exception. This decision is also a clear risk and return issue. Managers must decide how much of the scarce resources of capital should be invested in inventory and debtors and then determine the extent to which creditors will be used to finance further investments. In government terms, a more conservative policy would aim to be less reliant on short-term credit, financing a greater proportion of current assets through the use of longer-term finance. [Flynn, D. 2009. Chapter 13-3] Commentary: Within the context of the report presented, working capital policies are recommended so as to free up much needed cash flows within the narrowing fiscal envelope, 20 | P a g e
  • 21. whilst not compromising on the ability to procure much needed equipment required to improve service delivery in the immediate future. 11. The Learning Organisation In their abstract, A survey of market orientation research [Liao, S. H., Chang, W. J., Wu, C. C., & Katrichis, J. M. 2011], we become aware that a Learning Organisation refers “to an organisation- wide activity involved in creating and using knowledge to enhance competitiveness”. 12. Laparoscopic Surgery Laparoscopic surgery, also known as minimally invasive surgery, is a technique that allows surgery to be performed without the long traditional incision. By using multiple small incisions, each a few centimeters long, the surgeon inserts instruments including a tiny camera. The camera allows the surgeon to visualize the surgery. Incisions are made through the skin, muscle and other tissue, making laparoscopic surgery safer as less tissue is cut [Heisler, J. January 2012.]. 13. Extended Producer Responsibility Extended Producer Responsibility is based on the „Polluter pays‟ principle and entails making manufacturers responsible for the entire lifecycle of the products and packaging they produce. This means companies that manufacture, import and/or sell products and packaging, are required to be financially or physically responsible for such products after their useful life. They must either take back spent products and manage them through reuse, recycling or in energy production or delegate the responsibility to a third party which is paid by the producer for the spent-product management. [DEADP.June 2011] 14. Life-Cycle Costing Analysis or Life-Cycle Cost Assessment This is a procurement evaluation technique which determines the total cost of acquisition, operation, maintaining and disposal of the items acquired; the lowest ownership cost during the time the items is in use. [DEADP.June 2011] 15. Disposal Management This refers to the decommissioning, clearance and removable of unserviceable, redundant and obsolete assets. It considers obsolescence planning; maintaining a data base of redundant material; inspecting material for potential reuse; determining a disposal strategy; and executing the physical disposal process. [DEADP.June 2011] 16. Capped Budgeting Budgeting is done by using historic or incremental budgeting, which has, in the main, the net effect of not necessarily being able to keep pace with the constantly changing healthcare needs of the citizens of the province or the changes required within the healthcare system as a whole. Capped budgeting, by inference, remains unchanged, irrespective of the changing needs of the organization and its clients. 21 | P a g e
  • 22. 17. Zero-based Budgeting and Activity-Based Budgeting Expenses are justified for each new period and starts from a zero base. Each function within the organization is analysed for needs and costs and budgets are built around what is need for the up- coming period, regardless of whether such budgets are higher or lower than the previous period. This allows for strategic goals to be implemented into the budgeting process. Activity-based budgeting means that all activities that incur costs in every functional area of the organization are recorded, their relationships defined and analysed. Activities are tied to the strategic objectives, after which the cost of the activities are used to create the budget. This also provides opportunities to streamline costs and improve business processes and activities. [Flynn, D. 2009] 22 | P a g e
  • 23. ANNEXURE A: ERNST & YOUNG. 9 FEBRUARY 2012. THE HEALTH FOUNDATION: THE JOURNEY THUS FAR. SLIDE 23 EXTRACTED FROM PRESENTATION 23 | P a g e
  • 24. ANNEXURE B: 2020 – The Future of Health Care in the Western Cape. A Draft Framework for Dialogue: Key excerpt of material relevance to the Report and Recommendations “It is important to reflect on the achievements to date, what worked (and what did not) and the lessons learned. While a formal external evaluation of the 2010 plan has not been undertaken, this document summarises the most important achievements and lessons learned. An important theme throughout the document is what should be done differently. (Section A).” “What is the case for change? The compelling motivation for change includes changes in provincial demography, socio-economic determinants of health and the burden of disease; advances in technology; and the global, national and provincial policy environment. Sustaining the current good practices, and improving others, is key to becoming a world class organisation. We must focus on key priorities and the most cost-effective interventions within the limited resources available. (Section B)” “The planning for 2020 takes cognisance of both national and provincial policy developments. Important policy frameworks include the “green paper” on the National Health Insurance, the national Human Resources for Health framework and the provincial strategic plan, with particular emphasis on Strategic Objective 4 (Improving Wellness). (Section B).” “Prevention of disease and the promotion of wellness is the basis of health service development. The upstream factors that contribute to the burden of disease will be addressed with the relevant stakeholders through a “whole of society” approach. This approach has been recently endorsed through the Cape Town Declaration on Wellness. The Department of Health will focus on prevention and downstream promotion within the health service delivery platform. (Annexures A and B).” “The Department has drafted a broad strategic overview of a desired health care system in 2020. Seven guiding principles have been identified to guide the 2020 strategy (Section C): 1. Patient-centred quality of care 2. A move towards an outcomes-based approach 3. The retention of a Primary Health Care philosophy 4. Strengthening the District Health Services model 5. Equity 6. Affordability 7. Building Strategic Partnerships “ 24 | P a g e
  • 25. ANNEXURE C: WESTERN CAPE HEALTH BUDGET SPEECH 2012 BY MR THEUNS BOTHA, MINISTER OF HEALTH AT THE WESTERN CAPE PROVINCIAL LEGISLATURE EXCERPTS OF MATERIAL RELEVANCE TO THE REPORT AND RECOMMENDATIONS “Creating Wellness The department is now engaged in planning for 2020 to determine the service requirements going forward to 2020 and beyond. It will enable human resources, infrastructure and other requirements to be identified that will shape the future services. At the heart of the vision for 2020, there is a renewed commitment to a quality, caring and patient-centred health service and improved health outcomes where the care pathways will be designed to respond to patient needs.” “The shift in focus from illness to one of promoting and seeking wellness that gained significant ground during 2011/2012 culminating with the Wellness Summit and the ensuing Cape Town Declaration will be further strengthened in the coming year. In particular, I am committed to developing wellness centres that will increase the access in communities to health services and activities promoting a healthier lifestyle.” “Public private partnerships Partnership with a range of stakeholders have increased year-on-year during the term of this government. In the past two years, the province has been able to secure successful partnerships with the private sector that have led to significant contributions to our healthcare system. These public-private partnerships leverage the talents of the private sector for the benefit of public sector patients. It is based on a win-win philosophy that improves the physical health of patients and the financial health of the economy.” “Surgical skills training centre Located at the Red Cross War Memorial Children's Hospital, this centre is a partnership with the Children's Hospital Trust and Karl Storz Endoscopy SA, the latter having donated R10 million in equipment and technical assistance. It is the only training centre on this continent for surgeons-in-training from across Africa.” “Western Cape Health Foundation Supporting our efforts increase departmental income to address the R800 million maintenance backlog, we have appointed Ernst and Young Consultants, which resulted in the establishment of the independent Western Cape Health Foundation. The Foundation will take responsibility for the Commercial Rights project and independently spearhead new and innovative initiatives to generate resources for health. This is a significant step in strengthening this key relationship between the department and the private sector. I am encouraged that a number of prominent people, including Dr Paul Cluver, who will chair the board of directors of the Health Foundation, have been willing to give of their time and energy to promote better health in the Western Cape. Clearly an example of people who also feel that it is better together! The Foundation will be publicly introduced in the coming months. These examples certainly demonstrate that the Western Cape has succeeded in responding with solutions which have proved to bring about better health outcomes. At the heart of our 25 | P a g e
  • 26. provincial system is a commitment to accountability, affordability and efficiency - all necessary elements for high-quality health outcomes.” “The focus areas of the department in the coming 2012/2013 financial year include: 1. Developing action plans to improve overall patient experience and quality of clinical care. 2. The full commissioning of the Khayelitsha Hospital. 3. Commissioning of the Mitchell's Plain Hospital. 4. Finalising the 2020 strategy and plan for health services in the Western Cape. 5. Finalising the priority projects related to the Cape Town Declaration on Wellness including the:  High Five area approach to reduce alcohol-related injuries.  Healthy lifestyle campaign to decrease the incidence of chronic disease.  Programme to reduce intimate partner violence. 6. Improving maternal and child health outcomes. 7. Achieving an unqualified audit for finance, human resources and pre-determined objectives.” “Challenges The allocation to the department in 2012/2013, although increasing in nominal terms, is marginally less in real terms than the 2011/2012 Adjusted Budget. The gap between the need for health services and the available resources remains the challenge and increases the need to increase efficiency, work smarter and reprioritise services within the existing baseline allocation.” “Distribution of the budget The budget of the department is divided between the eight budget programmes with R12.722 billion or 87% of the vote being allocated to Programmes 2, 3, 4 and 5 which fund the direct operational costs of providing health services. Compensation of employees accounts for R8.478 billion or 58% of the total budget. The department has allocated approximately 31 % or R4.456 billion to the procurement of goods and services, which amounts to approximately 55% of the goods and services procured by the Western Cape Government. “ “Programme Three: Emergency Medical Services Emergency Medical Services, which is responsible for the provision of emergency medical transport including inter-hospital transfers and planned patient transport, is allocated R701 million or 4.8% of the vote. An amount of R15 million has been allocated provisionally for the Information Communication Technology system. This new computer-aided dispatch system, required to replace the existing system, will provide both the communication centre solution and the vehicle- based solution. It is anticipated that the system, once implemented, will improve the efficiency of the ambulance dispatch process and will also provide real-time information. “ 26 | P a g e
  • 27. “HealthNet is a transport service for our patients and the only-of-its-kind in the country. We have a fleet of 78 HealthNet vehicles, adapted for ill patients, which transport approximately 4000 patients from rural areas across the province to central hospitals per month. The service employs 95 personnel and performs outpatient transfers between levels of care. This transport infrastructure also transfers patients from primary healthcare facilities to regional and district hospitals. Although the service is often under unfair scrutiny, the new electronic supply and demand system will certainly improve the booking system, and address the problems of misuse.” “Programme Four: Provincial Hospital Services This programme is responsible for the provision of general specialist and specialised hospital services that include tuberculosis, psychiatric, rehabilitation and dental training hospitals. Central hospitals, which are large functional service delivery structures, are integral to a coherent health care delivery system at provincial level. These hospitals are the health facilities where a majority of health sciences trainees are trained to become health professionals, and where much of the health professional service skills, health research and knowledge capital resides. The Western Cape is the only province that over a number of years attempted to define and manage general and highly specialist services separately within the central hospitals. The funding of these services was distributed accordingly to separate budgetary programs however after concluding that with the current information and management systems that this was not possible the department has reverted to funding the hospitals as functional entities. This reinforces the argument that to attempt to manage and fund these hospitals divorced from the health system within which they function is not viable.” “Programme Five: Central Hospital Services The central hospitals, Groote Schuur Hospital, Tygerberg Hospital and Red Cross Children's Hospital, provide highly specialised healthcare services and a platform for research and training of health workers by the universities. All three hospitals provide highly specialised services as national referral centres. Central hospitals are allocated R4.212 billion or 28.8% of the vote in 2012/2013, which amounts to a nominal increase of R240.029 million or 6%. The total National Tertiary Services Grant of R2.182 billion, R270 million of the Health Professions Training and Development Grant and R3 million of the National Health Insurance Grant constitute approximately 58% of the funding allocated to this programme. The balance of R1.757 billion allocated to the programme is derived from the provincial equitable share, which clearly illustrates the extent of the underfunding of highly specialised services by the national conditional grants. Personnel costs are especially high in these hospitals constituting approximately 69% of the expenditure of this programme. The central hospitals will manage approximately 140 395 patient admissions in 2 545 beds and 1 123 389 patient day equivalents at a cost of R3 244 per patient day equivalent.” “The provincial equitable share funding has been allocated as follows:  R47 million for the purpose of maintaining current infrastructure.  R11 million for preventive maintenance.  R180 million for the purpose of maintenance and capital expenditure. 27 | P a g e
  • 28. R12 million for Red Cross War Memorial Children's Hospital.” “Although the Western Cape does not support the National Health Insurance green paper in its current format, it does not mean that the province will not participate in the NHI pilot projects. As an alternative solution, Western Cape Government proposes Universal Healthcare, built on a primary healthcare basis, similar to the structures implemented in the Western Cape at present, where patients are referred to regional and specialised facilities according to their medical needs, and government providing the transport infrastructure. The rest is governance-based on good business principles - financial discipline, efficiency, equality, modernisation, monitoring and evaluation. The lesson we have learned in the Western Cape is that we can improve healthcare for everyone by strengthening the positive elements of the public sector and removing its deficiencies on a planned and sustained basis. “ “In the efforts to increase wellness by working together we can all be better together! If all those who work in the department work effectively and efficiently and make the best use of the available funds to provide the best service, we can be better together!” “Improving the health status and well-being of the people of the Western Cape can only be achieved through partnerships, put differently by working better together we can all live a better life! Thank you!” 28 | P a g e
  • 29. ANNEXURE D: WESTERN CAPE GOVERNMENT HEALTH. ANNUAL PERFORMANCE PLAN. 2012/13. EXCERPT SUMMARISING STRATEGIC OBJECTIVE FOUR [4] “The draft strategy for 2020 has two main thrusts, as described in the Strategic Objective: Improving Wellness (SO 4) that forms part of provincial strategic plan. Firstly, at the heart of the vision of 2020 is a renewed commitment to a caring, quality, patient-centric health service. The district health service, supported by all levels and sections of the service is the key vehicle to deliver this quality health service. The PHC philosophy implies a comprehensive health service across levels of care and the various sectors allowing for meaningful and active participation by communities. The limited resource base compared to the need for health services demands a more focused approach to improve health outcomes in the most efficient and productive manner possible. The Department acknowledges that addressing these challenges requires strong partnerships with a range of role players. Secondly, there is an important conceptual shift from managing the consequences of the burden of disease to improving wellness. Central to this approach is an increased emphasis on prevention and promotion by addressing the upstream risk factors that impact on health and wellness in the whole of society. The endorsement at the Western Cape Health Summit held in November 2011 of the Cape Town Declaration on Wellness by approximately 250 delegates from all sectors of society in the Western Cape was an important milestone in this regard. There are six focus areas that have been identified and work is underway to identify, plan and implement projects in these areas.” 29 | P a g e
  • 30. ANNEXURE E: FINANCE INSTRUCTION G22/2009 CLASSIFICATION OF LEASE AGREEMENTS IN THE STANDARD CHART OF ACCOUNTS AS WELL AS THE REPORTING ON LEASE COMMITMENTS AT THE END OF EACH FINANCIAL YEAR 1. The contents of this Finance Instruction must be brought to the attention of all officials concerned. 2. Finance Instruction G19/2009 dated 10 March 2009 is applicable to the 2008/2009 financial year only and is repealed as from 1 April 2009. However Finance Instruction G22/2009 must be read in conjunction with Finance Instruction G19/2006 dated 13 April 2006. 3. PURPOSE 3.1 The purpose of this Finance Instruction is to provide guidance to all financial staff on the economic classification of lease payments in the budget and in BAS using the new SCOA accounts and segments. In addition the circular clarifies the link between the economic classification and the disclosure requirements in the Annual Financial Statements and also introduces the differentiation between Operational and Financial Leases. 4. DEFINITION OF LEASE COMMITMENTS 4.1 Lease commitments represent amounts owing from the reporting date to the end of the lease contract. 4.2 A lease is a contract that gives the lessee (the renter) the right to use an asset for an agreed period of time in return for a payment or series of payments. 4.3 A finance lease is a lease that transfers substantially all risks and rewards incidental to ownership of an asset. Title may or may not eventually be transferred 4.4 An operating lease is a lease other than a finance lease. 4.5 Economic life is the period over which an asset is expected to yield economic benefits or service potential to one or more users. 4.6 Useful life is the estimated remaining period, from the beginning of the lease term, without limitation by the lease term, over which the economic benefits or service potential embodied in the asset are expected to be consumed by the entity 4.7 The definition of a lease includes contracts for the hire of an asset, which contain a provision giving the option to acquire title upon the fulfillment of agreed conditions. These contracts are sometimes known as hire purchase contracts. 4.8 It is common practice for contracts to be termed rental agreements. This therefore does not mean that this is excluded from being a lease. One still needs to go through the conditions of the contract to determine whether it is a finance lease or an operating lease. 4.9 It is important to note that the payment of a lump sum amount (rather than regular periodic payment such as monthly payments) does not preclude lease accounting as such arrangements may still meet the definition of a lease. 30 | P a g e
  • 31. 5. DETERMINATION OF A FINANCE LEASE VS. OPERATING LEASE 5.1 FINANCE LEASE Lessor Lessee Treat as a sale Treat as a purchase Asset Lease that transfers substantially all the risks and rewards of ownership 5.2 OPERATING LEASE Lessor Lessee Right to use the asset Lease that does not transfer substantially all the risks and rewards of ownership 6. CLASSIFICATION OF LEASES 6.1 The classification of leases is based on the extent to which risks and rewards incidental to ownership of a leased asset lie with the lessor or the lessee rather than on which party has legal ownership over the asset. 6.2 Risks include the possibilities of losses from idle capacity, technological obsolescence or changes in value due to changing economic conditions. Rewards may be represented by the expectation of service potential or profitable operation over the asset’s economic life and of gain from appreciation in value or realisation of a residual value 6.3 Although the following are examples of situations, which would normally lead to a lease being classified as a finance lease, a lease does not need to meet all these criteria in order to be classified as a finance lease:  The lease transfers ownership of the asset to the lessee by the end of the lease term;  The lessee has the option to purchase the asset at a price which is expected to be sufficiently lower than the fair value at the date the option becomes exercisable, so that at the inception of the lease it is reasonably certain that the option will be exercised;  The lease term is for the major part of the economic life of the asset even if title is not transferred;  At the inception of the lease the present value of the minimum lease payments amounts to at least 90% of the fair value of the asset. 31 | P a g e
  • 32. The leased assets are of a specialised nature such that only the institution can use the assets without modifications being made;  The lessor’s losses associated with cancellation of the lease by the lessee is borne by the lessee; or  The leased assets cannot easily be replaced by another asset. 6.4 Transactions and other events are accounted for and presented in accordance with their substance and financial reality and not merely with legal form. While the legal form of a lease agreement is that the lessee may acquire no legal title to the leased asset, in the case of finance lease the substance and financial reality are that the lessee acquires the economic benefits or service potential of the use of the leased asset for the obligation to pay for that right an amount approximating to the fair value of the asset and the related finance charge. 6.5 Sometimes the terms of a lease is such that the lessee is substantially in the same economic position as if the lessee had borrowed money to buy the asset (even though legal title may not pass to the lessee). For example, this may be the case if the lease payments effectively are paying for the whole asset or if the lease term is such that the lessee can use the asset for the major part of its economic life. 32 | P a g e
  • 33. 7. CLASSIFICATION OF A LEASE AGREEMENT Yes Ownership transferred at end of lease? No Bargain purchase option? Yes No Lease term = major part of economic life? Yes No Present value of minimum lease payment > Yes fair value of asset? No FINANCE LEASE OPERATING LEASE 8. ACCOUNTING POLICY 8.1 Operating and finance lease commitments are expensed when the payments are made. Assets acquired in terms of finance lease agreements are disclosed in the annexures and disclosure notes to the Financial Statements. 8.2 The classification of the lease (i.e. operating or finance lease) must be made at the inception of the lease agreement and accounted for as follows: 33 | P a g e
  • 34. Item Segment Asset Segment Project segment Operating lease OPERATING LEASE LEASES: PHOTOSTAT MACHINES NO PROJECTS (STAND ALONE ITEM) CUR LEASES: FAX MACHINES Finance lease FINANCE LEASE LEASES: CELLPHONES NO PROJECTS (STAND ALONE (Capital portion of ITEM) CAP instalments) LEASES: TELEPHONE SWITCHES LEASES: MEDICAL EQUIPMENT LEASES: NON-MEDICAL EQUIPMENT Interest on leases INTEREST ON LEASES LEASES: CELLPHONES NO PROJECTS (STAND ALONE ITEM) CUR (interest portion of LEASES: TELEPHONE SWITCHES instalment LEASES: MEDICAL EQUIPMENT LEASES: NON-MEDICAL EQUIPMENT 8.3 Unfortunately the PFMA prohibits borrowing by National/Provincial Departments and the Treasury Regulations makes it clear that finance leases are deemed to be borrowings and are therefore not permitted. 8.4 Although departments are not permitted to enter into/have finance leases, all finance leases that they do have should be disclosed as finance leases. It will however mean that the department will not be complying with the Treasury Regulations (TR 13). Finance leases may not (incorrectly) be disclosed as operating leases even when the lease is condoned by National Treasury. 8.5 Practice Note 5 of 2007/08 issued by the Office of the Accountant General seeks to provide the following circumstances where departments may enter into finance leases without additional approval required: 8.5.1 Finance leases where:  A Finance lease is more economical than an operating lease; and  The period of the finance lease does not exceed 60 months in respect of motor vehicles and 36 months for equipment except with written approval by the relevant Treasury; and  The finance lease was entered into in terms of RT3 of 2006 or a transversal contract entered into by National Treasury 34 | P a g e
  • 35. 8.5.2 Blanket approval for any irregular expenditure incurred as a result of RT3 of 2000 and RT3 of 2003 Transversal contracts entered with various suppliers for the supply, delivery, installation, commissioning and maintenance of office equipment and labour saving devices has been given 9. PROCEDURES TO BE FOLLOWED BY DIRECTORATES/DISTRICTS AND INSTITUTIONS WITH REGARD TO THE CLASSIFICATION AND ACCOUNTING OF LEASES 9.1 MAINTENANCE OF SEPARATE LEASE REGISTERS FOR FINANCE AND OPERATING LEASES AND THE CLASSIFICATION OF LEASES: 9.1.1. Directorates/Districts and Institutions must ensure that all leases concluded be identified and classified. 9.1.2. The following serves as examples of Operating and Finance Leases determined from lease agreements currently in place. Finance Leases Operating Leases Cell phone contracts where the Photostat machines department holds the contract Telephone Switchboard Agreements Fax machines Equipment Lease Agreements These agreements are sometimes known as hire purchase agreements where it was clear from the outset that the asset will remain with the department for most of its economic life and the only reason why it was not outright purchased was because it was deemed more economical and affordable to pay the purchase price over a fixed period. Also in cases where assets are almost permanently placed with Departments with the written arrangement that Departments will buy dedicated consumables to be used on the equipment. If there is a fixed portion paid for the availability of the equipment and even possibly a fixed amount for consumables per month, the fixed amount for the asset will be the lease and that for the consumables will be a normal commitment while the variable 35 | P a g e
  • 36. amount for the consumables at a unit price will be normal expenditure. If there is no charge for the asset being placed on the premises there is no lease. It must be noted that the terms of the agreement will dictate whether an Operating or Finance Lease has been concluded. If in doubt kindly approach the SCM Unit at Head Office for assistance. 9.1.3 Leases concluded must be entered into a Lease Register. Separate Lease registers must be maintained for Operational and Finance Leases. Each Lease register must contain the minimum requirements as per paragraph 6 of Treasury Circular 5/ 2006 dated 10 March 2006 distributed under cover of Finance Instruction G19/ 2006 dated 13 April 2006. 9.1.4 Information on leases concluded and copies of the Lease Agreements must be forwarded to SCM: Section Contract Management, 4 Dorp Street, Cape Town on a monthly basis. An indication must also be given of the classification of the lease for audit purposes. 9.1.5 The Section: Contract Management will also maintain a Lease Register and will ensure that the Register maintained at Head Office agrees with the Lease Register maintained by the Directorate/District/Institution. 9.1.6 The rental of gas cylinders via National Contract RT 81 should not be considered as leases as the rental is payable annually in advance. If any other gases or containers are rented or leased on a basis where it is payable on a fixed monthly/ quarterly/ six-monthly basis, these arrangements should be measured against the criteria for leases. 9.2 ACCOUNTING OF LEASES 9.2.1 Leases must be accounted according to the new SCOA effective from 1 April 2008. 9.2.1.1 All Operating Leases must be paid as follows: Item Segment Operating Leases Asset Segment Leases: Photostat Machines Leases: Fax Machines Project Segment No projects (stand-alone) current 36 | P a g e
  • 37. 9.2.1.2 All Finance Leases to be paid as follows: Item Segment Financial Leases Asset Segment Leases: Cellphones Leases: Telephone Switches Leases: Medical Equipment Leases: Non-Medical Equipment Project Segment No projects (stand-alone) capital 9.2.1.3 All interest payments on finance leases must be paid as follows: Item Segment Interest Paid: Finance Leases Asset Segment Leases: Cellphones Leases: Telephone Switches Leases: Medical Equipment Leases: Non-Medical Equipment Project Segment No projects (stand-alone) current 9.2.2 At the end of the financial year i.e. from 1 – 15 April of each year the Section: Contract Management will obtain the relevant information on the Finance Lease payments made. A Journal where the interest portion will be shifted from capital to interest will be drawn by Head Office before 31 April of each year. Your co-operation is appreciated. MR JM JOOSTE pp HEAD: HEALTH DATE: 27 March 2009 Jooste/Fin InstructionG22/2009 Classification of lease agreements in the SCOA/March 2009 37 | P a g e
  • 38. 38 | P a g e
  • 39. Western Cape - Dept of Health Capex Budget 2011 - 2016 Annual increase 5% 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 0 0 0 0 0 0 0 0 0 0 1. Allocation for low-value equipment and other assets 100 000 000 105 000 000 110 250 000 115 762 500 121 550 625 127 628 156 134 009 564 140 710 042 147 745 544 155 132 822 2. Allocation for big-ticket assets * 100 000 000 105 000 000 110 250 000 115 762 500 121 550 625 127 628 156 134 009 564 140 710 042 147 745 544 155 132 822 Budgeted Expenditure 200 000 000 210 000 000 220 500 000 231 525 000 243 101 250 255 256 313 268 019 128 281 420 085 295 491 089 310 265 643 Possible # Possible # Possible # Possible # Possible # Possible # of units of units of units of units of units of units * 6 units at 5 000 000 = 30 000 000 6 0 0 7 0 0 3 10 000 000 = 30 000 000 3 0 0 2 0 0 1 15 000 000 = 15 000 000 1 0 0 2 0 0 75 000 000 75 000 000 0 0 85 000 000 0 0 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 Cash Flows Annual Budget Per Year 100 000 000 105 000 000 110 250 000 115 762 500 121 550 625 127 628 156 134 009 564 140 710 042 147 745 544 155 132 822 Cumulative 100 000 000 205 000 000 315 250 000 431 012 500 552 563 125 680 191 281 814 200 845 954 910 888 1 102 656 432 1 257 789 254 Rental Cash Flows Per Year (17 601 918) (17 601 918) (17 601 918) (37 978 339) (37 978 339) (27 604 078) (27 604 078) (20 376 421) (8 366 917) (8 366 917) Cumulative (17 601 918) (35 203 837) (52 805 755) (90 784 094) (128 762 433) (156 366 511) (183 970 590) (204 347 010) (212 713 927) (221 080 844) Cash Differential Per Year 82 398 082 87 398 082 92 648 082 77 784 161 83 572 286 100 024 078 106 405 486 120 333 622 139 378 627 146 765 905 Cumulative 82 398 082 169 796 163 262 444 245 340 228 406 423 800 692 523 824 770 630 230 256 750 563 877 889 942 505 1 036 708 409 less: (assets not rented) (25 000 000) (26 250 000) (27 562 500) (28 940 625) (30 387 656) (31 907 039) (33 502 391) (35 177 511) (36 936 386) (38 783 205) 0.25 Available Cash: Per Year 57 398 082 61 148 082 65 085 582 48 843 536 53 184 630 68 117 039 72 903 095 85 156 111 102 442 241 107 982 699 Cumulative 57 398 082 118 546 163 183 631 745 232 475 281 285 659 910 353 776 949 426 680 044 511 836 155 614 278 397 722 261 096 Accelerated equipment purchases: 2011/2012 13 4 units at 5 000 000 = 20 000 000 2 units at 10 000 000 = 20 000 000 P A G E 1 units at 15 000 000 = 15 000 000 55 000 000 Accelerated equipment purchases: 2014/2015 5 units at 5 000 000 = 25 000 000 1 units at 10 000 000 = 10 000 000 1 units at 15 000 000 = 15 000 000 50 000 000 ANNEXURE F: TABLE 1: OPERATING LEASING BENCHMARK SCENARIO MODEL
  • 40. 40 | P a g e