1. Alun Richard Pike Mobile: 0415 068 489
14 Lowry Place, Woronora Heights, NSW 2233 Email: arpservicesptyltd@gmail.com
Seeking SMP supervisory or estimator/planner role in an organisation in need of a highly skilled
professional with extensive pipework and structural experience in oil and gas industry , Boiler outages,
Steelworks , LNG, construction and the mining industry.
Results-driven, detail-oriented Piping Supervisor with over 25 years of broad experience and expertise in pipe work
and structured steel work. A History of supervising on various projects thro to successful completion through
effective management and team collaboration. Continually strives to produce high quality projects while adhering to
a tight schedule and budget. Interact easily with people of diverse backgrounds, cultures, and professional levels and
possess excellent interpersonal relationship skills. Compliance to safe work practice by adhering to both
environmental and OH&S regulations. Excellent communication skills and able to collaborate effectively with co-
workers at all levels.
WORK SCOPE
• Experienced estimator/planner specialising In linebreaks and MJ,s, and imputing them into P6 Primavera.For
Qenos Shut down 2015 from job walking to determining work scope, scaffolding, craneage requirements to
planning and devolpment of workpacks for hot work, cold work, valve replacements/overhauls, exchangers,
safety valves and pressure vessels.
• Experience working in all aspects of the trade having worked on a wide variety of sites eg steel works,
Boiler outages at coal and gas fired power stations, shutdowns at petro chemical refineries to Mining and
LNG sites to piping in tank farms from berth to tank and erection of various sized tanks from ground up.
• Equally experienced with pipe work or structural steel work and worked as a coded welder for many years
• Skilled in both workshop and site work – Vast experience with CNC Press brakes, guillotines, pipe benders
and various hand tools developments and extensive hydro testing experience
• Worked on many diverse projects such as Aldermasten weapons establishment , Porton down , Sizewell B ,
The Torus project , To working at THE ORB manufacturing components for the Large Hadron Collider
• Worked on a wide range of contracts around the world from South Wales to Samoa to a boiler construction
in Tumut to working on the Sydney Olympic Site to LNG South Hook Site West Wales and an 6 foot pipeline
at Sydney Desalination Plant to a coal washery near Wollongong and many Refinery Turnarounds at Mobil ,
Caltex , Qenos Altona /Botany , BP, Texaco and chevron
• Attended a Foundation of Supervision Course whilst working for Theiss Services
• Experienced in working as subcontractor or an employee in a company setup
EDUCATION AND QUALIFICATIONS
Apprenticeship in Fabrication and Welding | Neath College 1987 - 1991
Bernard Hastie Engineering City & Guilds Fabrication/Welding - level 201 and level 229
Passed many welding tests using MIG, TIG and Stick in mild steel and stainless steel
5 GCSE’s | Cymmer Comprehensive School · South Wales 1981 - 1986
English, Mathematics, Geography, Biology and Woodwork
Page 1 of 4
2. Alun Richard Pike Mobile: 0415 068 489 • Email: arpservicesptyltd@gmail.com
Australia
n trade certificates
Boilermaker and 1st
class welder
Driving licence , White card Working at heights , Confined space , BA trained , Lokring trained
PROFESSIONAL EXPERIENCE
Estimator/Planner
• An Estimator/Planner working for the 2015 Qenos Turnaround, Botany. Specialising in Line Breaks and MJ’s
determining work scope planning and entering into P6 Primavera for the upcoming Shutdown.
Piping Supervisor
• Piping Supervisor at Vopac Botany Upgrade Project, the running of two 14”fuel lines and a 4”nitrogen line
from the new berth into the tank farm complete with pigging sender/receiver stations and associated valves.
• Piping Supervisor at BP Bulwer Turnaround, Running various piping jobs including renewal of 3ft overhead
line.
• Piping Supervisor at Caltex Lytton ALKY Turnaround, Running various piping jobs including renewal of nozzles
in several vessels
• Supervised the installation of pipe work at Amcor’s Paper Mill Botany which involved kms of pipe work.
Duties included the organising of men for the day-to-day installation of Pipe work and support’s for Paper
machine
• Boiler construction Tumut Prepared drawings and JSEA’s obtaining permits, also arrange pipe spools,
supports and spring hangers to be brought to the job site
• Shutdowns at various refineries ensuring the correct installation of pipe work and valves in a safe and
efficient manner. Perform tool box talks, allocation of workers daily duties, and running several work fronts
simultaneously
• Piping Supervisor at Westcliff Coal Washery. Upgrading the existing plant and installation of pipe work in
the new washery
Hot Work Supervisor
• Turnaround at Qenos Melbourne. Administered and maintained supervisory functions that include toolbox
talks with work crew, dealing with operators to spade and purge pipelines to be worked on, and filling out of
work packs for QA
Mechanical Supervisor
• Provided leadership and monitored activities of workers engaged in erecting two remediation buildings for BHP
Remediation Project in Newcastle. Administered permit acquisitions, work method statements preparation, tool
box talks and preparation of drawings. Allocated day’s duties for workers and collaboratively liaised with Theiss
and BHP throughout the day. Organised plant and cranes for the day erection, whilst ensuring adherence to safe
work practice
Coded Pipeline Welder/Pipefitter/Boilermaker/Welder
• Served as a pipefitter/Welder for DME Engineering working at VISI Paper and Pulp Mill to complete a 1000 tonne
recovery boiler construction
• Worked at LNG Terminal South Hook, Milford Haven to fabricate 100 meter diameter tanks
Page 2 of 4
3. Alun Richard Pike Mobile: 0415 068 489 • Email: arpservicesptyltd@gmail.com
• Partake in the construction of 350 tonne VCR liquor storage tank
• Worked on several large contracts ranging from summer shutdowns and outages, including Aberthaw
PowerStation, Texaco Petrochemical Plant, Llanwern Steelworks, BOS Plant, Hot mill, Blast Furnace and Dragon
LNG Terminal, and LNG South hook Milford Haven, Wales
• Coded welder on a 6ft diameter pipeline for De-Salination Plant , Sydney
• Coke Ovens Rebuild at Corus Steelworks Port Talbot
• Performed general shutdowns at the Cold Mill, Blast Furnace and BOS plant,coke ovens
• Involved in measuring up jobs to fabrication and welding of steelwork to the installation on site
• Worked on structural steelwork on Sydney Olympic Site and several sites around the city including Darling
Harbour, Citibank and Westfield Mall Bondi Junction and Westfield centre point, to Sydney SCG grandstand
• Experienced with stainless steel, mild steel and aluminium involving all aspects of TIG, MIG and Stick
• Worked on steam lines in a Paper Mill in Auckland to re-fitting a Tuna Factory in Samoa with ovens, fishmeal
plant and refrigeration units
EMPLOYMENT HISTORY
Estimator/P6 Planner Transfield Services, Qenos 2015 Shutdown, Botany, Sydney Jun 14 – Dec 15
Piping Supervisor Transfield Services, Altona Mobil Refinery Apr 14 – Jun 14
Piping Supervisor Transfield Services, Vopac Botany, Sydney Dec 13 – Feb 14
Piping Supervisor UGL Limited, Caltex Lytton Refinery, Brisbane Jul 13 - Nov 13
Piping Supervisor Transfield Services, BP Bulwer Island, Brisbane Apr 13 – Jun 13
Piping Supervisor | DME Engineering Services Pty Ltd · Botany B9 Paper Mill for Amcor Dec 12 – Apr 13
Hot Work Supervisor | Transfield Services · Qenos, Melbourne 2012 Turnaround Sep 12 - Nov 12
Piping Supervisor | DME Engineering Services Pty Ltd · Botany B9 Project for Amcor Jan 11 - Sep 12
Piping Supervisor | Transfield Services · Westcliff Coal Washery Upgrade Dec 10 - Dec 11
Mechanical Supervisor | DME Engineering · BHP Remediation Project, Newcastle Nov 09 - Dec 10
Coded Pipeline Welder | Caringbah Steel Pty Ltd · WDA Sydney Desalination Project Feb 09 - Oct 09
SMP supervisor | DME Engineering Pty Ltd · VISI Paper and Pulp Mill, Tumut, NSW Mar 08 - Feb 09
Pipefitter Power Units · LNG Terminal South Hook, Milford Haven 2007 - 2008
Pipefitter/Welder | Mitsui Babcocks, Texaco Oil Refinery, Aberthaw Power Station, Wales 2006 - 2007
Leading hand boilermaker| Bernard Hastie Engineering Ltd · South Wales 2004 - 2005
Boilermaker/Welder | Marcus Engineering · Various construction site around Sydney 1998 - 2004
Pipe Fitter | Robert Stones Engineering · New Zealand 1996 - 1998
Fabricator/Welder Apprentice to leading hand | Bernard Hastie Engineering Ltd , South Wales 1987 – 1995
On Completion of my Apprenticeship as a Fabricator/Welder, I have worked on many different projects over the
years, where I have fabricated, welded and erected steelwork and pipe work, then taking a Supervisory role. Duties
included reading of drawings organising pipe work being delivered to site signing on/off permits and organising men
ensuring the correct installation of pipe work in a safe and efficient manner. My latest role as an estimator/planner
which involves job walking and estimating line breaks and MJ,s, entering them into P6 Primavera for the upcoming
Qenos 2015 turnaround. My profile can also be found on the website www.linkedin.com.au
Page 3 of 4
4. Alun Richard Pike Mobile: 0415 068 489 • Email: arpservicesptyltd@gmail.com
PROFESSIONAL REFEREES
Mr Marcus Scott
Lead QA/QC
Mobile: 0405 196 717
Mr Greg Mawson
Turnaround Manager
Mobile: 0422 077 883
Mr matt kahl
Project Manager
Mobile: 0427 043 585
Page 4 of 4