SlideShare uma empresa Scribd logo
1 de 27
Baixar para ler offline
TSX-V: ALR




              WELL POSITIONED IN AN
             EMERGING COPPER-GOLD
               PORPHYRY DISTRICT

                    November 2012     1
Forward Looking Statements


 This document contains forward-looking statements under Canadian securities legislation. Forward-looking statements include, but are not limited
 to, statements with respect to the development potential and timetable of the Rosita project; the timing and amount of estimated future
 development and exploration; costs of future activities; capital and operating expenditures; success of exploration activities; government regulation
 of mining operations; and environmental risks. Generally, forward-looking statements can be identified by the use of forward-looking terminology
 such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not
 anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”,
 “might” or “will be taken”, “occur” or “be achieved”. Forward-looking statements are based on the opinions and estimates of management as of the
 date such statements are made. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may
 cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied
 by such forward-looking statements, including but not limited to risks related to: timing and availability of external financing on acceptable terms;
 unexpected events and delays during construction, expansion and start-up; variations in ore grade and recovery rates; receipt and revocation of
 government approvals; actual results of exploration and mining activities; changes in project parameters as plans continue to be refined; future
 prices of metals; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining
 industry. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from
 those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There
 can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those
 anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not
 undertake to update any forward-looking statements except in accordance with applicable securities laws.

 The technical and scientific information included herein has been reviewed and approved by Joseph Arengi, M.Sc., P.Geo , President and CEO of
 the Company, and a qualified person under National Instrument 43-101 of the Canadian Securities Administrators.




                                                                                                                                                    2
Investment Highlights

      Past producing                             • Option to earn a 65% interest in the high grade copper-gold-silver Rosita
                                                   project
      Rosita Project in                          • Historic production of 245 million lbs Cu, 160,000 oz Au and 2.6 million oz Ag
        Nicaragua                                  from two pits


     Well positioned in                          • Located in the prolific Mining Triangle of northeast Nicaragua
                                                 • 7 km north of Calibre Mining/B2Gold’s Primavera prospect, a significant
       an emerging                                 copper-gold porphyry discovery
      mining district                            • Stable, pro-mining government

                                                 • Stockpiles include a NI 43-101 compliant inferred resource of 8 million tonnes
           High grade
                                                   containing 108.5 million lbs Cu, 118,500 oz Au and 2.4 million oz Ag (1.01%
            resource                               Cu Eq. grade1)23

                                                 • Initial 5,500 m drill program has identified a 1.1 km long and 200 m deep Cu-
         Significant                               Au-Ag mineralized zone at the Santa Rita deposit
     exploration upside                          • Drill highlights include 0.57% Cu, 1.52 g/t Au and 5.93 g/t Ag over 15 m, 29.54
                                                   g/t Au over 8 m and 1.42% Cu, 0.18 g/t Au and 20.45 g/t Ag over 10 m

         Experienced                             • Experienced management team and Board of Directors
         Management                                        – Extensive exploration and community relations experience in Nicaragua


1.    Assumes a long term copper price of US$2.90/lb, gold price of US$1,200/oz and silver price of US$24/oz.
2.    See Data in NI 43-101 Technical Report entitled “Technical Report on Mineral Resource Estimate of the Rosita Stockpiles” dated June 22, 2012 and filed on SEDAR.
3.    As reported in the news release issued by Alder on May 9, 2012, the inferred resource estimate totals 7.95 mt, at an average grade of 0.62% Cu, 0.46 g/t Au and 9.2 g/t Ag
                                                                                                                                                                                   3
      with an overall copper equivalent grade of 1.01%. The inferred mineral resource contains 108 million pounds of Cu, 118,500 ounces of Au and 2.35 million ounces of Ag.
Management and Board of Directors


Joseph Arengi | President and CEO                           Don Dudek | Chairman
•   35 years of exploration and operational experience      •   Held various roles with junior and senior exploration and
    throughout Canada, Nicaragua, South America and             mining companies over the past 28 years
    Africa                                                  •   Currently serves as Senior VP Technical Services for
•   Credited with discovering 4 billion pounds of copper        Endeavour Mining Corp. and prior to that he served as
    and 60 million ounces of silver in Botswana                 Exploration Manager for Aur Resources Inc.
Ryan Ptolemy | CFO                                          Rene Bharti | Director
•   Certified General Accountant and CFA charter holder     •   Has held roles in several public and private companies,
•   Currently CFO of Rodinia Lithium Inc. and Belo Sun          including experience in the mining sector which will be
    Mining Corp.                                                important for the company's development of its projects in
                                                                Nicaragua
Josh van Deurzen | Corporate Secretary
                                                            Dan Bruno | Director
•   Corporate and securities lawyer, working as a legal
    consultant to various public and private companies in   •   Over 15 years of investment experience and was
    the resource-based sector                                   previously a Managing Director of a US based Investment
                                                                Bank and a Director, in the Investment Banking group at
                                                                GMP Securities Ltd.
                                                            Hon. Pierre Pettigrew | Director
                                                            •   Former Minister of Foreign Affairs and currently Executive
                                                                Advisor, Deloitte Touche LLP
                                                            •   Current board member of several public companies
                                                            Will Randall | Director
                                                            •   Professional Geologist and currently President and CEO
                                                                of Rodinia Lithium Inc.

                                                                                                                     4
Share Capital and Share Performance


TSX Venture Symbol                                             ALR
                                                                                   $0.45                                                                                                               3.50

Share Price (Nov 12, 2012)                                   $0.08                 $0.40
                                                                                                                                                                                                       3.00
                                                                                   $0.35
Share Price (52-week range)                        $0.06 - $0.29




                                                                                                                                                                                                              Volume (millions)
                                                                     Price (CAD)
                                                                                                                                                                                                       2.50
                                                                                   $0.30
Issued and Outstanding                               72.8 million
                                                                                   $0.25                                                                                                               2.00

Fully Diluted1                                       95.8 million
                                                                                   $0.20                                                                                                               1.50

Cash and Marketable Securities                       $1.0 million                  $0.15
                                                                                                                                                                                                       1.00
Market Capitalization (Basic)                        $5.8 million                  $0.10
                                                                                                                                                                                                       0.50
                                                                                   $0.05
Insider/Institutional Holders                                 8.6%
                                                                                     $-                                                                                                                0.00



                                                                                           Jan-11




                                                                                                                                                 Jan-12




                                                                                                                                                                            Jul-12
                                                                                                                      Jul-11
                                                                                                    Mar-11




                                                                                                                                                          Mar-12




                                                                                                                                                                                              Nov-12
                                                                                                                               Sep-11
                                                                                                                                        Nov-11




                                                                                                                                                                                     Sep-12
                                                                                                             May-11




                                                                                                                                                                   May-12
1. 7,025,000 options outstanding with a weighted average exercise
   price of $0.21 and a weighted average life of 2.7 years and
   15,952,019 warrants outstanding with an exercise price of $0.20
   expiring on January 31, 2014.
                                                                                                                       Volume                                Price




                                                                                                                                                                                                          5
Rosita Cu-Au-Ag Project




                          6
Project Overview

 •      Option agreement with Calibre Mining to earn
        a 65% interest in the Rosita D concession by
        making the following payments:
           –      Project expenditures of C$4.0 million (C$0.5
                  million already spent)
           –      Issuance of 1,000,000 shares over a four year
                  period (400,000 shares have been issued)
 •      NI 43-101 compliant inferred stockpile
        resource of 108.5 million lbs Cu, 118,500 oz
        Au and 2,354,300 oz Ag1,2
 •      Completed an initial 5,500 m drill program
        centered on the past producing Santa Rita and
        R-13 deposits
 •      Mineralization below the Santa Rita pit is open
        along strike to the east, west and down dip
 •      Exploration upside from the Bambana prospect
        located 4 km northwest of Santa Rita
           –      400 m drill program completed
 •      Historical data suggests a significant precious
        metal component to the mineralized system
1.   See Data in NI 43-101 Technical Report entitled “Technical Report on Mineral Resource Estimate of the Rosita Stockpiles” dated June 22, 2012 and filed on SEDAR.
2.   As reported in the news release issued by Alder on May 9, 2012, the inferred resource estimate totals 7.95 mt, at an average grade of 0.62% Cu, 0.46 g/t Au and 9.2 g/t Ag
     with an overall copper equivalent grade of 1.01%. The inferred mineral resource contains 108 million pounds of Cu, 118,500 ounces of Au and 2.35 million ounces of Ag.
                                                                                                                                                                                  7
Project Location
• The Rosita D concession covers 3,356 hectares in the prolific Mining Triangle of northeast Nicaragua,
  275 km northeast of the capital city of Managua
• 7 km north of the Primavera prospect (Calibre Mining/B2Gold), where a significant porphyry style Au-Cu
  mineralization has been discovered


                                                                   • Rated the safest country in Central
                                                                     America with a long mining history
                                                                   • Modern infrastructure and easily
                                                                     accessible
                                                                   • Stable, supportive and
                                                                     democratically elected government
                                            Cobre Panama             supportive of foreign investment
                                           605 M tonnes Cu
                                                                   • Supportive mining laws with an
                                                                     attractive tax regime: 3% NSR, 30%
                         Cerro Colorado
                       1,445 M tonnes Cu                             Net Profits Tax
                                                                   • Three producing gold mines:
                                                                         – La Libertad and El Limon Mines
                                                                           (B2Gold)
                                                                         – Bonanza Mine (Hemco)

       Prolific, underexplored mining district with a stable, pro-mining government

                                                                                                          8
Nicaragua – An Emerging Porphyry District

                     Bonanza
                   3.0M ozs Au
                   production*
                                                                                                                             Puerto
                                                                                                                             Cabezas




                                                                                             Managua


                          Forest Reserve


                                                             Rosita
                                                             108M lbs Cu, 118K ozs Au,
                                                             2.4M ozs Ag resource

                                           Primavera
                                                                    Alder
                            B2Gold/Calibre Discovery
                            261.7M @ 0.78 G/T Au, 0.30% Cu          Calibre
                                                                    Calibre-B2Gold
         Siuna
                                                                    Hemco
2.3M ozs Au production*
                                                               *See data in NI43-101 Technical Report entitled
                                                               “Technical Report on the Copper-Gold-Silver
                                                               Porphyry/Skarn Project at the Rosita D Concession dated
                                                               January 5, 2012 which is filed on SEDAR.


  Mining Triangle of Nicaragua has produced over 305 million lbs Cu and 8 million oz Au

                                                                                                                         9
Project History

• Concession hosts the historic open-pit Santa
  Rita copper-gold-silver deposit
                                                      1906 - 1912   Exploration and mining production
     – Historic production of 245 million lbs Cu,
                                                      1916 – 1918   Tunnel and drilling
       160,000 oz Au and 2.61 million oz Ag
                                                      1950          Tunnel sampling and diamond drilling
     – Reported mill recoveries of 60 – 80%
                                                      1955          Diamond drilling
• Early mining focused on high grade ore (5.37
                                                      1959 – 1974   Mining
  million tonnes of ore mined grading 2.06% Cu,
  0.93 g/t Au and 15.08 g/t Ag) with 2% copper        1981 – 1983   Geophysical survey, soil sampling and
                                                                    diamond drilling
  stockpiled
                                                      1996 – 1998   RC drilling, Geophysical survey and
• First gold recovery during the last five years of                 soil sampling
  production
                                                      2008          Trenching and rock sampling
• Mine closed in 1975 due to low copper prices        2009 – 2010   Trenching, mapping, soil sampling
                                                                    and diamond drilling
• Management believes that a substantial
  amount of Cu-Au-Ag mineralization lies both         2011 - 2012   Channel sampling and RC sampling
                                                                    on stockpiles
  below and adjacent to the Santa Rita pit


    High grade deposit with substantial historical copper, gold and silver production

                                                                                                   10
Project Geology, Targets and Prospects




                                      Multiple highly prospective targets yet to be drilled
Refer to press release dated Nov 1, 2012
                                                                                              11
Santa Rita Inferred Stockpile Mineral Resource

 Santa Rita Stockpiles – Compliant Inferred Resource
  Effective Date: June 22, 2012
                                    TONNES                  Cu               Au             Ag           CuEq                Cu                    Au                     Ag
         STOCKPILE
                                      (Mt)                  (%)             (g/t)          (g/t)          (%)              (M lbs)                (oz)                   (oz)

             NORTH                        3.33              0.78            0.58            10.3           1.25             56.99               62,100              1,100,900

             SOUTH                        2.20              0.33            0.49             5.1           0.69             16.16               34,700                360,000

                  NE                      0.55              0.50            0.22             9.6           0.75              6.06                3,800                168,300

               EAST                       1.88              0.71            0.30            12.0           1.03             29.33               17,900                725,100

             TOTALS                       7.95              0.62            0.46             9.2           1.01            108.54              118,500              2,354,300
        Notes on Mineral Resource Estimation
        1. See Data in NI 43-101 Technical Report entitled “Technical Report on Mineral Resource Estimate of the Rosita Stockpiles” dated June 22, 2012 and filed on SEDAR.
        2. The mineral resource estimate base case is reported at a 0.15% copper equivalent cut-off grade; this cut-off incorporates consideration of mining and processing cost,
           recoveries, commodity prices and selling cost.
        3. The mineral resource estimate is reported on an undiluted basis.
        4. The mineral resource estimate assumes a long term copper price of US$2.90/lb, a gold price of US$1,200/oz and a silver price of US$24/oz.
        5. Rounding as required by NI 43-101 reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content.
        6. Tonnage and grade measurements are in metric units. Contained gold and silver ounces are reported as troy ounces, contained copper pounds as imperial pounds.
        7. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by
           environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.
        8. The quantity and grade of reported inferred mineral resources in this estimation are uncertain in nature and there has been insufficient exploration to define these inferred
           mineral resources as indicated or measured mineral resources and it is uncertain if further exploration will result in upgrading them to indicated or measured mineral
           resources.


                      Robust resource base at low resource discovery cost of $0.01/lb Cu1
1.   Based on the inferred copper mineral resource and total exploration expenditures of $900,000
                                                                                                                                                                                           12
Santa Rita and R-13 Deposits




                                                                                                              0.49Cu, 1.15Au,
                                                                                                                 4.4Ag/4m

                                     29.54/8m
                                                                                           0.80Cu, 10.45Au,
                                                                                              21.83Ag/3m



                                                                         1.42Cu, 0.18Au,
                                                                          20.45Ag/10m


                                           0.87Cu, 0.81Au,
                                             7.96Ag/10m      6.90/8.0,
                                                             1.76/4m
                                                                          IP Anomaly



              Potential to add additional tonnage to an already robust stockpile resource
Refer to press release dated Nov 1, 2012
                                                                                                                                13
Santa Rita/R-13 Deposit Skarn Cu Mineralization




                                               0.54Cu/ 24.4m
                                                                                2.27Cu/ 16.7m




 Note: Alder has not yet verified the historic drill results reported herein and does not intend to use this information for purposes
 other than planning and prioritizing exploration targets. See News Release of May 31, 2012 and September 11, 2012                      14
Santa Rita/R-13 Deposit Skarn Au/Ag Mineralization




                                                                            Crosscutting New Gold Zones




 Note: Alder has not yet verified the historic drill results reported herein and does not intend to use this information for purposes
 other than planning and prioritizing exploration targets. See News Release of May 31, 2012 and September 11, 2012                      15
Santa Rita Targets
                                                           A


                                                             Multiple Cu-Au-Ag
                                                           skarn targets, historic
                                                                  resource
                                                           B


                                                                Santa Rita/R-13
                                                               corridor, Cu-Au-Ag
                                                                      skarn

                                                           C


                                                               New Au discovery,
                                                                29.54 g/t Au/8m*
                                                           D
                                              IP Anomaly
                                                               Porphyry Cu target,
                                                                 strong porphyry
                                                                 textures, highly
                                                                anomalous Cu, Au



 * Refer to news release dated Sept 5, 2012
                                                                               16
Santa Rita Targets




                     17
Bambana Targets
   •   Located 4 km northwest of the Santa Rita deposit
   •   Calibre Mining completed three drill holes that returned intercepts of up to 50 m grading
       0.42% Cu, 7.00 g/t Ag and 11.5 m grading 0.51% Cu, 7.56 g/t Ag and 0.25 g/t Au
   •   Prospect pit returned 2.8m grading 6.28% Cu, 0.74 g/t Au, 132.75 g/t Ag




                                                                                                   18
Bambana Area – T3 Prospect

•     Trench returned porphyry-style mineralization that
      included 12 m grading 3.32% Cu, 0.22 g/t Au and
      37.55 g/t Ag
•     Rock-chip sampling at two benches returned two
      wide intercepts of 29 m grading 2.09% Cu, 0.19
      g/t Au and 14.6 g/t Ag and 29 m grading 1.98%
      Cu, 0.14 g/t Au and 14.4 g/t Ag
•     400 m drill program has successfully confirmed the
      presence of shallow, high grade, oxide copper and
      silver mineralization
•     Untested IP chargeability anomaly with porphyry
      copper potential




                Close proximity to the Santa Rita pit provides future development upside
* Refer to news release dated Jun 13, 2012 and Nov 1, 2012
                                                                                           19
Bambana Area – Tipispan Prospect

•        Historic drilling returned porphyry-style
         mineralization that included 50 m grading 0.42%
                                                                       Circular Magnetic
         Cu and 7.00 g/t Ag and 11.5 m grading 0.51%                        Feature
         Cu, 0.25 g/t Au and 10.41 g/t Ag
                                                                                                         BB10-03
•        Rock-chip sampling at prospect pit returned 2.8 m
         grading 6.28% Cu, 0.74 g/t Au and 132.75 g/t Ag
                                                                                                              BB10-01
•        Mineralized zone traced >200 m on surface and                                                        0.42% Cu
                                                                                                         7.00 g/t Ag / 50.0m
         100 m vertical depth
                                                                             BB10-02                      Tipispan
                                                                         0.51 Cu, 0.25 Au
                                                                         7.56 Ag / 11.5m



                                                                       T3
                                                                                     919
                                                                                     1.23 Cu, 0.36 Au,
                                                                                     10.63 Ag / 13.0m
                                                                                                              Zopilote*
                                                                 920                                176,000 tonnes @ 0.90% Cu
                                                                 1.74 Cu, 0.09 Au,                             (Oxide)
                                                                 16.64 Ag / 18.0m                    79,000 tonnes @ 0.97% Cu
                                                                                                             (Sulphide)




                    Close proximity to the Santa Rita pit provides future development upside
    * Refer to news release dated Nov 1, 2012
                                                                                                                               20
Bambana Prospect – T3 Zone Bench Sample




                                           3.07% Cu, 0.14 g/t Au and 14.4 g/t Ag over 1 m
* Refer to news release dated Jun 13, 2012 and Nov 1, 2012
                                                                                            21
Ground Magnetic Survey – 108 km




     A number of prospective anomalies warrant follow-up exploration work

                                                                            22
Geophysics Compilation



                                        IP Targets




     A number of prospective anomalies warrant follow-up exploration work

                                                                            23
Exploration and Development Timeline

Milestone                                 Q1 2013   Q2 2013   Q3 2013   Q4 2013

Diamond Drilling – Santa Rita (7,500 m)


Diamond Drilling – Bambana (2,500 m)


Metallurgical Testing


Resource Estimate – Santa Rita


Scoping Study


General Exploration




                                                                            24
Reasons to Invest




      Past producing project                                      Well positioned in a stable
                                                                                                                                 Robust resource base with
     with significant economic                                      and emerging mining
                                                                                                                                    exploration upside
              potential                                                     district
 • Previously a high grade, open-                                • Located in the prolific Mining                                • Stockpiles include a NI 43-101
   pit mine with historic                                          Triangle of northeast                                           compliant inferred resource of
   production of 245 million lbs                                   Nicaragua, host to several                                      8 million tonnes containing
   Cu, 160,000 oz Au and 2.61                                      significant copper and gold                                     108.5 million lbs Cu, 118,500
   million oz Ag                                                   porphyry deposits                                               oz Au and 2.4 million oz Ag
 • Potential for project with                                    • Stable, pro-mining government                                   (1.01% Cu Eq. grade1)23
   excellent economics at current                                  with supportive mining laws                                   • Excellent drill results illustrate
   copper price levels                                             and an attractive mining tax                                    the potential to establish a
                                                                   regime                                                          significant high grade resource

1.   Assumes a long term copper price of US$2.90/lb, gold price of US$1,200/oz and silver price of US$24/oz.
2.   See Data in NI 43-101 Technical Report entitled “Technical Report on Mineral Resource Estimate of the Rosita Stockpiles” dated June 22, 2012 and filed on SEDAR.
3.   As reported in the news release issued by Alder on May 9, 2012, the inferred resource estimate totals 7.95 mt, at an average grade of 0.62% Cu, 0.46 g/t Au and 9.2 g/t Ag
                                                                                                                                                                                  25
     with an overall copper equivalent grade of 1.01%. The inferred mineral resource contains 108 million pounds of Cu, 118,500 ounces of Au and 2.35 million ounces of Ag.
TSX-V: ALR




                              65 Queen Street West, Suite 800
                                   Toronto, ON, M5H 2M5
                                  info@alderresources.ca

                                     Follow us:

         Joseph Arengi                 Don Dudek                Michael McAllister
      President and CEO                 Chairman                    Manager, IR
        (416) 309-4296               (416) 861-2261               (416) 309-2134
  jarengi@alderresources.ca                                mmcallister@alderresources.ca

                                                                                   26
Santa Rita and R-13 Drill Highlights
                                                              To    Thickness    Cu            Au             Ag
                 Hole ID           Area           From (m)   (m)       (m)      (%)           (g/t)          (g/t)
                  D901            Sta Rita           75      85.9      10.9     0.36          0.15           6.32
                    "                                89       92         3      0.12          1.27           3.57
                  D906             R-13              213     217         4      0.49          1.15           4.40
                  D910            Sta Rita           50      115        65      0.20     1.48 (1.00 cut)     2.00
                                Including            84       92         8      <0.1     6.90 (3.03 cut)    <0.1
                                    and             100      115        15      0.57          1.52           5.93
                                    and              106     110         4      1.46          3.22          15.25
                  D911             R-13              173     179         6      0.05          1.86           3.15
                                    and              262     292        30      0.31          1.10           5.78
                                including            289     292         3      0.80   10.45 (10.33 cut)    21.83
                                 including           290     291         1      0.48    30.37 (30.00 cut)    11.6
                   D912         Santa Rita           156     158         2      1.24          1.45          12.25
                                    and              197     201         4      0.03          1.76           0.09
                  D914            Sta Rita           235     250        15      0.04     15.82 (5.62 cut)    0.23
                                including            240     248         8      0.04    29.54 (9.38 cut)     0.29
                                including            241     243         2      0.04   110.69 (30.00 cut)    0.60
                  D915          Santa Rita           57       63         6      0.36          0.15           3.07
                                    and              96      149        53      0.50          0.08           6.44
                                including            128     138        10      1.42          0.18          20.45
                                    and              129     133         4      1.94          0.25          30.05
                  D916          Santa Rita            7       12         5      0.33          0.09           1.14
                  D917          Santa Rita            0       55        55      0.05          0.31           0.86
                                 including            8       14         6      0.19          1.07           3.62
                                    and              98      105         7      0.32          0.13           4.37
                                    and              165     169         4      0.35          0.55           2.40
                  D918          Santa Rita           71       85        14      0.87          0.81           7.96

Excellent drill results illustrate the potential to establish a significant high grade resource
Refer to press release dated May 31, 2011; Nov 1, 2012
                                                                                                                     27

Mais conteúdo relacionado

Mais procurados

07 24-12-august presentation
07 24-12-august presentation07 24-12-august presentation
07 24-12-august presentationJennieg
 
07 18-12-august presentation
07 18-12-august presentation07 18-12-august presentation
07 18-12-august presentationJennieg
 
08 07-12-august presentation
08 07-12-august presentation08 07-12-august presentation
08 07-12-august presentationJennieg
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Symposium
 
Us silver gold corp pres sep 7 2012 v3
Us silver gold corp pres sep 7 2012 v3Us silver gold corp pres sep 7 2012 v3
Us silver gold corp pres sep 7 2012 v3ussilver
 
09 20-12-fall presentation
09 20-12-fall presentation09 20-12-fall presentation
09 20-12-fall presentationJennieg
 
09 20-12-fall presentation
09 20-12-fall presentation09 20-12-fall presentation
09 20-12-fall presentationJennieg
 
U.S. Silver and Gold Corporate Presentation - Novemberr 2012
U.S. Silver and Gold Corporate Presentation - Novemberr 2012U.S. Silver and Gold Corporate Presentation - Novemberr 2012
U.S. Silver and Gold Corporate Presentation - Novemberr 2012ussilver
 
Us silver gold corp pres aug 27 2012
Us silver gold corp pres aug 27 2012Us silver gold corp pres aug 27 2012
Us silver gold corp pres aug 27 2012ussilver
 
Sep2010 corporatepresentation
Sep2010 corporatepresentationSep2010 corporatepresentation
Sep2010 corporatepresentationcarpathiangold
 
Galane gold company presentation
Galane gold company presentationGalane gold company presentation
Galane gold company presentationGalaneGold
 
U.S. Silver and Gold Corporate Presentation - November 14 2012
U.S. Silver and Gold Corporate Presentation - November 14 2012 U.S. Silver and Gold Corporate Presentation - November 14 2012
U.S. Silver and Gold Corporate Presentation - November 14 2012 ussilver
 
Corporate Presentation - December 19, 2012
Corporate Presentation - December 19, 2012Corporate Presentation - December 19, 2012
Corporate Presentation - December 19, 2012ussilver
 
U.S. Silver and Gold Corporate Presentation - November 29, 2012
U.S. Silver and Gold Corporate Presentation - November 29, 2012 U.S. Silver and Gold Corporate Presentation - November 29, 2012
U.S. Silver and Gold Corporate Presentation - November 29, 2012 ussilver
 
U.S. Silver & Gold Corporate Presentation - February 2013
U.S. Silver & Gold Corporate Presentation - February 2013U.S. Silver & Gold Corporate Presentation - February 2013
U.S. Silver & Gold Corporate Presentation - February 2013ussilver
 
U.S. Silver and Gold Corporate Presentation - November 27, 2012
U.S. Silver and Gold Corporate Presentation - November 27, 2012U.S. Silver and Gold Corporate Presentation - November 27, 2012
U.S. Silver and Gold Corporate Presentation - November 27, 2012ussilver
 

Mais procurados (18)

07 24-12-august presentation
07 24-12-august presentation07 24-12-august presentation
07 24-12-august presentation
 
07 18-12-august presentation
07 18-12-august presentation07 18-12-august presentation
07 18-12-august presentation
 
08 07-12-august presentation
08 07-12-august presentation08 07-12-august presentation
08 07-12-august presentation
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012
 
Us silver gold corp pres sep 7 2012 v3
Us silver gold corp pres sep 7 2012 v3Us silver gold corp pres sep 7 2012 v3
Us silver gold corp pres sep 7 2012 v3
 
09 20-12-fall presentation
09 20-12-fall presentation09 20-12-fall presentation
09 20-12-fall presentation
 
09 20-12-fall presentation
09 20-12-fall presentation09 20-12-fall presentation
09 20-12-fall presentation
 
U.S. Silver and Gold Corporate Presentation - Novemberr 2012
U.S. Silver and Gold Corporate Presentation - Novemberr 2012U.S. Silver and Gold Corporate Presentation - Novemberr 2012
U.S. Silver and Gold Corporate Presentation - Novemberr 2012
 
Mmv pr nov2010
Mmv pr nov2010Mmv pr nov2010
Mmv pr nov2010
 
Us silver gold corp pres aug 27 2012
Us silver gold corp pres aug 27 2012Us silver gold corp pres aug 27 2012
Us silver gold corp pres aug 27 2012
 
Sep2010 corporatepresentation
Sep2010 corporatepresentationSep2010 corporatepresentation
Sep2010 corporatepresentation
 
Galane gold company presentation
Galane gold company presentationGalane gold company presentation
Galane gold company presentation
 
U.S. Silver and Gold Corporate Presentation - November 14 2012
U.S. Silver and Gold Corporate Presentation - November 14 2012 U.S. Silver and Gold Corporate Presentation - November 14 2012
U.S. Silver and Gold Corporate Presentation - November 14 2012
 
Corporate Presentation - December 19, 2012
Corporate Presentation - December 19, 2012Corporate Presentation - December 19, 2012
Corporate Presentation - December 19, 2012
 
U.S. Silver and Gold Corporate Presentation - November 29, 2012
U.S. Silver and Gold Corporate Presentation - November 29, 2012 U.S. Silver and Gold Corporate Presentation - November 29, 2012
U.S. Silver and Gold Corporate Presentation - November 29, 2012
 
U.S. Silver & Gold Corporate Presentation - February 2013
U.S. Silver & Gold Corporate Presentation - February 2013U.S. Silver & Gold Corporate Presentation - February 2013
U.S. Silver & Gold Corporate Presentation - February 2013
 
Webshow1
Webshow1Webshow1
Webshow1
 
U.S. Silver and Gold Corporate Presentation - November 27, 2012
U.S. Silver and Gold Corporate Presentation - November 27, 2012U.S. Silver and Gold Corporate Presentation - November 27, 2012
U.S. Silver and Gold Corporate Presentation - November 27, 2012
 

Destaque

2014 06-09-alder presentation
2014 06-09-alder presentation2014 06-09-alder presentation
2014 06-09-alder presentationAlderResources
 
2014 04-21-alder presentation
2014 04-21-alder presentation2014 04-21-alder presentation
2014 04-21-alder presentationAlderResources
 
2014 05-01-alder presentation
2014 05-01-alder presentation2014 05-01-alder presentation
2014 05-01-alder presentationAlderResources
 
Alder Presentation October 2014
Alder Presentation October 2014Alder Presentation October 2014
Alder Presentation October 2014AlderResources
 
Corporate Presentation February 2015
Corporate Presentation February 2015Corporate Presentation February 2015
Corporate Presentation February 2015AlderResources
 
我流勝手のAiの歴史
我流勝手のAiの歴史我流勝手のAiの歴史
我流勝手のAiの歴史Kohei Kumazawa
 
Alder Presentation September 2014
Alder Presentation September 2014Alder Presentation September 2014
Alder Presentation September 2014AlderResources
 
2014 04-01-alder presentation
2014 04-01-alder presentation2014 04-01-alder presentation
2014 04-01-alder presentationAlderResources
 

Destaque (9)

2014 06-09-alder presentation
2014 06-09-alder presentation2014 06-09-alder presentation
2014 06-09-alder presentation
 
2014 04-21-alder presentation
2014 04-21-alder presentation2014 04-21-alder presentation
2014 04-21-alder presentation
 
2014 05-01-alder presentation
2014 05-01-alder presentation2014 05-01-alder presentation
2014 05-01-alder presentation
 
Alder Presentation October 2014
Alder Presentation October 2014Alder Presentation October 2014
Alder Presentation October 2014
 
Alder Presentation
Alder PresentationAlder Presentation
Alder Presentation
 
Corporate Presentation February 2015
Corporate Presentation February 2015Corporate Presentation February 2015
Corporate Presentation February 2015
 
我流勝手のAiの歴史
我流勝手のAiの歴史我流勝手のAiの歴史
我流勝手のAiの歴史
 
Alder Presentation September 2014
Alder Presentation September 2014Alder Presentation September 2014
Alder Presentation September 2014
 
2014 04-01-alder presentation
2014 04-01-alder presentation2014 04-01-alder presentation
2014 04-01-alder presentation
 

Semelhante a Alder Presentation November 23 2012

Alder Presentation November 2013
Alder Presentation November 2013Alder Presentation November 2013
Alder Presentation November 2013AlderResources
 
2013 12-03-alder presentation
2013 12-03-alder presentation2013 12-03-alder presentation
2013 12-03-alder presentationAlderResources
 
Alder Presentation October 2013
Alder Presentation October 2013Alder Presentation October 2013
Alder Presentation October 2013AlderResources
 
Alder Presentation September 2013
Alder Presentation September 2013Alder Presentation September 2013
Alder Presentation September 2013AlderResources
 
Alder pres 03_2_12_ver3
Alder pres 03_2_12_ver3Alder pres 03_2_12_ver3
Alder pres 03_2_12_ver3AlderResources
 
Alder Presentation August 2013
Alder Presentation August 2013Alder Presentation August 2013
Alder Presentation August 2013AlderResources
 
2013 05-07-alder presentation
2013 05-07-alder presentation2013 05-07-alder presentation
2013 05-07-alder presentationAlderResources
 
2013 05-28-alder presentation
2013 05-28-alder presentation2013 05-28-alder presentation
2013 05-28-alder presentationAlderResources
 
Alder Presentation July 2013
Alder Presentation July 2013Alder Presentation July 2013
Alder Presentation July 2013AlderResources
 
U.S. Silver and Gold Corporate Presentation - November 2012
U.S. Silver and Gold Corporate Presentation - November 2012U.S. Silver and Gold Corporate Presentation - November 2012
U.S. Silver and Gold Corporate Presentation - November 2012ussilver
 
U.S. Silver and Gold Corporate Presentation - November 2 2012
U.S. Silver and Gold Corporate Presentation - November 2 2012U.S. Silver and Gold Corporate Presentation - November 2 2012
U.S. Silver and Gold Corporate Presentation - November 2 2012ussilver
 
U.S. Silver and Gold Corporate Presentation - November 2 2012
U.S. Silver and Gold Corporate Presentation - November 2 2012U.S. Silver and Gold Corporate Presentation - November 2 2012
U.S. Silver and Gold Corporate Presentation - November 2 2012ussilver
 
U.S. Silver and Gold Corporate Presentation - November 2 2012
U.S. Silver and Gold Corporate Presentation - November 2 2012U.S. Silver and Gold Corporate Presentation - November 2 2012
U.S. Silver and Gold Corporate Presentation - November 2 2012ussilver
 

Semelhante a Alder Presentation November 23 2012 (18)

Alder Presentation November 2013
Alder Presentation November 2013Alder Presentation November 2013
Alder Presentation November 2013
 
2013 12-03-alder presentation
2013 12-03-alder presentation2013 12-03-alder presentation
2013 12-03-alder presentation
 
Alder Presentation October 2013
Alder Presentation October 2013Alder Presentation October 2013
Alder Presentation October 2013
 
Alder Presentation September 2013
Alder Presentation September 2013Alder Presentation September 2013
Alder Presentation September 2013
 
Alder pres 03_2_12_ver3
Alder pres 03_2_12_ver3Alder pres 03_2_12_ver3
Alder pres 03_2_12_ver3
 
07 11 12_f
07 11 12_f07 11 12_f
07 11 12_f
 
Alder Presentation August 2013
Alder Presentation August 2013Alder Presentation August 2013
Alder Presentation August 2013
 
04 12 12
04 12 1204 12 12
04 12 12
 
2013 05-07-alder presentation
2013 05-07-alder presentation2013 05-07-alder presentation
2013 05-07-alder presentation
 
May 2012
May 2012May 2012
May 2012
 
2013 05-28-alder presentation
2013 05-28-alder presentation2013 05-28-alder presentation
2013 05-28-alder presentation
 
Alder Presentation July 2013
Alder Presentation July 2013Alder Presentation July 2013
Alder Presentation July 2013
 
U.S. Silver and Gold Corporate Presentation - November 2012
U.S. Silver and Gold Corporate Presentation - November 2012U.S. Silver and Gold Corporate Presentation - November 2012
U.S. Silver and Gold Corporate Presentation - November 2012
 
U.S. Silver and Gold Corporate Presentation - November 2 2012
U.S. Silver and Gold Corporate Presentation - November 2 2012U.S. Silver and Gold Corporate Presentation - November 2 2012
U.S. Silver and Gold Corporate Presentation - November 2 2012
 
U.S. Silver and Gold Corporate Presentation - November 2 2012
U.S. Silver and Gold Corporate Presentation - November 2 2012U.S. Silver and Gold Corporate Presentation - November 2 2012
U.S. Silver and Gold Corporate Presentation - November 2 2012
 
U.S. Silver and Gold Corporate Presentation - November 2 2012
U.S. Silver and Gold Corporate Presentation - November 2 2012U.S. Silver and Gold Corporate Presentation - November 2 2012
U.S. Silver and Gold Corporate Presentation - November 2 2012
 
Aa ggold presentation 01 10-11
Aa ggold presentation 01 10-11Aa ggold presentation 01 10-11
Aa ggold presentation 01 10-11
 
NEW
NEWNEW
NEW
 

Mais de AlderResources

Alder Presentation March 2014
Alder Presentation March 2014Alder Presentation March 2014
Alder Presentation March 2014AlderResources
 
2014 03-01-alder presentation
2014 03-01-alder presentation2014 03-01-alder presentation
2014 03-01-alder presentationAlderResources
 
2014 02-03-alder presentation
2014 02-03-alder presentation2014 02-03-alder presentation
2014 02-03-alder presentationAlderResources
 
Alder Presentation December 7 2012
Alder Presentation December 7 2012Alder Presentation December 7 2012
Alder Presentation December 7 2012AlderResources
 
Alder Presentation November 23 2012
Alder Presentation November 23 2012Alder Presentation November 23 2012
Alder Presentation November 23 2012AlderResources
 

Mais de AlderResources (7)

Alder Presentation March 2014
Alder Presentation March 2014Alder Presentation March 2014
Alder Presentation March 2014
 
2014 03-01-alder presentation
2014 03-01-alder presentation2014 03-01-alder presentation
2014 03-01-alder presentation
 
2014 02-03-alder presentation
2014 02-03-alder presentation2014 02-03-alder presentation
2014 02-03-alder presentation
 
Alder Presentation December 7 2012
Alder Presentation December 7 2012Alder Presentation December 7 2012
Alder Presentation December 7 2012
 
Alder Presentation November 23 2012
Alder Presentation November 23 2012Alder Presentation November 23 2012
Alder Presentation November 23 2012
 
08 09 12
08 09 1208 09 12
08 09 12
 
08 09 12_new
08 09 12_new08 09 12_new
08 09 12_new
 

Alder Presentation November 23 2012

  • 1. TSX-V: ALR WELL POSITIONED IN AN EMERGING COPPER-GOLD PORPHYRY DISTRICT November 2012 1
  • 2. Forward Looking Statements This document contains forward-looking statements under Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to the development potential and timetable of the Rosita project; the timing and amount of estimated future development and exploration; costs of future activities; capital and operating expenditures; success of exploration activities; government regulation of mining operations; and environmental risks. Generally, forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements, including but not limited to risks related to: timing and availability of external financing on acceptable terms; unexpected events and delays during construction, expansion and start-up; variations in ore grade and recovery rates; receipt and revocation of government approvals; actual results of exploration and mining activities; changes in project parameters as plans continue to be refined; future prices of metals; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking statements except in accordance with applicable securities laws. The technical and scientific information included herein has been reviewed and approved by Joseph Arengi, M.Sc., P.Geo , President and CEO of the Company, and a qualified person under National Instrument 43-101 of the Canadian Securities Administrators. 2
  • 3. Investment Highlights Past producing • Option to earn a 65% interest in the high grade copper-gold-silver Rosita project Rosita Project in • Historic production of 245 million lbs Cu, 160,000 oz Au and 2.6 million oz Ag Nicaragua from two pits Well positioned in • Located in the prolific Mining Triangle of northeast Nicaragua • 7 km north of Calibre Mining/B2Gold’s Primavera prospect, a significant an emerging copper-gold porphyry discovery mining district • Stable, pro-mining government • Stockpiles include a NI 43-101 compliant inferred resource of 8 million tonnes High grade containing 108.5 million lbs Cu, 118,500 oz Au and 2.4 million oz Ag (1.01% resource Cu Eq. grade1)23 • Initial 5,500 m drill program has identified a 1.1 km long and 200 m deep Cu- Significant Au-Ag mineralized zone at the Santa Rita deposit exploration upside • Drill highlights include 0.57% Cu, 1.52 g/t Au and 5.93 g/t Ag over 15 m, 29.54 g/t Au over 8 m and 1.42% Cu, 0.18 g/t Au and 20.45 g/t Ag over 10 m Experienced • Experienced management team and Board of Directors Management – Extensive exploration and community relations experience in Nicaragua 1. Assumes a long term copper price of US$2.90/lb, gold price of US$1,200/oz and silver price of US$24/oz. 2. See Data in NI 43-101 Technical Report entitled “Technical Report on Mineral Resource Estimate of the Rosita Stockpiles” dated June 22, 2012 and filed on SEDAR. 3. As reported in the news release issued by Alder on May 9, 2012, the inferred resource estimate totals 7.95 mt, at an average grade of 0.62% Cu, 0.46 g/t Au and 9.2 g/t Ag 3 with an overall copper equivalent grade of 1.01%. The inferred mineral resource contains 108 million pounds of Cu, 118,500 ounces of Au and 2.35 million ounces of Ag.
  • 4. Management and Board of Directors Joseph Arengi | President and CEO Don Dudek | Chairman • 35 years of exploration and operational experience • Held various roles with junior and senior exploration and throughout Canada, Nicaragua, South America and mining companies over the past 28 years Africa • Currently serves as Senior VP Technical Services for • Credited with discovering 4 billion pounds of copper Endeavour Mining Corp. and prior to that he served as and 60 million ounces of silver in Botswana Exploration Manager for Aur Resources Inc. Ryan Ptolemy | CFO Rene Bharti | Director • Certified General Accountant and CFA charter holder • Has held roles in several public and private companies, • Currently CFO of Rodinia Lithium Inc. and Belo Sun including experience in the mining sector which will be Mining Corp. important for the company's development of its projects in Nicaragua Josh van Deurzen | Corporate Secretary Dan Bruno | Director • Corporate and securities lawyer, working as a legal consultant to various public and private companies in • Over 15 years of investment experience and was the resource-based sector previously a Managing Director of a US based Investment Bank and a Director, in the Investment Banking group at GMP Securities Ltd. Hon. Pierre Pettigrew | Director • Former Minister of Foreign Affairs and currently Executive Advisor, Deloitte Touche LLP • Current board member of several public companies Will Randall | Director • Professional Geologist and currently President and CEO of Rodinia Lithium Inc. 4
  • 5. Share Capital and Share Performance TSX Venture Symbol ALR $0.45 3.50 Share Price (Nov 12, 2012) $0.08 $0.40 3.00 $0.35 Share Price (52-week range) $0.06 - $0.29 Volume (millions) Price (CAD) 2.50 $0.30 Issued and Outstanding 72.8 million $0.25 2.00 Fully Diluted1 95.8 million $0.20 1.50 Cash and Marketable Securities $1.0 million $0.15 1.00 Market Capitalization (Basic) $5.8 million $0.10 0.50 $0.05 Insider/Institutional Holders 8.6% $- 0.00 Jan-11 Jan-12 Jul-12 Jul-11 Mar-11 Mar-12 Nov-12 Sep-11 Nov-11 Sep-12 May-11 May-12 1. 7,025,000 options outstanding with a weighted average exercise price of $0.21 and a weighted average life of 2.7 years and 15,952,019 warrants outstanding with an exercise price of $0.20 expiring on January 31, 2014. Volume Price 5
  • 7. Project Overview • Option agreement with Calibre Mining to earn a 65% interest in the Rosita D concession by making the following payments: – Project expenditures of C$4.0 million (C$0.5 million already spent) – Issuance of 1,000,000 shares over a four year period (400,000 shares have been issued) • NI 43-101 compliant inferred stockpile resource of 108.5 million lbs Cu, 118,500 oz Au and 2,354,300 oz Ag1,2 • Completed an initial 5,500 m drill program centered on the past producing Santa Rita and R-13 deposits • Mineralization below the Santa Rita pit is open along strike to the east, west and down dip • Exploration upside from the Bambana prospect located 4 km northwest of Santa Rita – 400 m drill program completed • Historical data suggests a significant precious metal component to the mineralized system 1. See Data in NI 43-101 Technical Report entitled “Technical Report on Mineral Resource Estimate of the Rosita Stockpiles” dated June 22, 2012 and filed on SEDAR. 2. As reported in the news release issued by Alder on May 9, 2012, the inferred resource estimate totals 7.95 mt, at an average grade of 0.62% Cu, 0.46 g/t Au and 9.2 g/t Ag with an overall copper equivalent grade of 1.01%. The inferred mineral resource contains 108 million pounds of Cu, 118,500 ounces of Au and 2.35 million ounces of Ag. 7
  • 8. Project Location • The Rosita D concession covers 3,356 hectares in the prolific Mining Triangle of northeast Nicaragua, 275 km northeast of the capital city of Managua • 7 km north of the Primavera prospect (Calibre Mining/B2Gold), where a significant porphyry style Au-Cu mineralization has been discovered • Rated the safest country in Central America with a long mining history • Modern infrastructure and easily accessible • Stable, supportive and democratically elected government Cobre Panama supportive of foreign investment 605 M tonnes Cu • Supportive mining laws with an attractive tax regime: 3% NSR, 30% Cerro Colorado 1,445 M tonnes Cu Net Profits Tax • Three producing gold mines: – La Libertad and El Limon Mines (B2Gold) – Bonanza Mine (Hemco) Prolific, underexplored mining district with a stable, pro-mining government 8
  • 9. Nicaragua – An Emerging Porphyry District Bonanza 3.0M ozs Au production* Puerto Cabezas Managua Forest Reserve Rosita 108M lbs Cu, 118K ozs Au, 2.4M ozs Ag resource Primavera Alder B2Gold/Calibre Discovery 261.7M @ 0.78 G/T Au, 0.30% Cu Calibre Calibre-B2Gold Siuna Hemco 2.3M ozs Au production* *See data in NI43-101 Technical Report entitled “Technical Report on the Copper-Gold-Silver Porphyry/Skarn Project at the Rosita D Concession dated January 5, 2012 which is filed on SEDAR. Mining Triangle of Nicaragua has produced over 305 million lbs Cu and 8 million oz Au 9
  • 10. Project History • Concession hosts the historic open-pit Santa Rita copper-gold-silver deposit 1906 - 1912 Exploration and mining production – Historic production of 245 million lbs Cu, 1916 – 1918 Tunnel and drilling 160,000 oz Au and 2.61 million oz Ag 1950 Tunnel sampling and diamond drilling – Reported mill recoveries of 60 – 80% 1955 Diamond drilling • Early mining focused on high grade ore (5.37 1959 – 1974 Mining million tonnes of ore mined grading 2.06% Cu, 0.93 g/t Au and 15.08 g/t Ag) with 2% copper 1981 – 1983 Geophysical survey, soil sampling and diamond drilling stockpiled 1996 – 1998 RC drilling, Geophysical survey and • First gold recovery during the last five years of soil sampling production 2008 Trenching and rock sampling • Mine closed in 1975 due to low copper prices 2009 – 2010 Trenching, mapping, soil sampling and diamond drilling • Management believes that a substantial amount of Cu-Au-Ag mineralization lies both 2011 - 2012 Channel sampling and RC sampling on stockpiles below and adjacent to the Santa Rita pit High grade deposit with substantial historical copper, gold and silver production 10
  • 11. Project Geology, Targets and Prospects Multiple highly prospective targets yet to be drilled Refer to press release dated Nov 1, 2012 11
  • 12. Santa Rita Inferred Stockpile Mineral Resource Santa Rita Stockpiles – Compliant Inferred Resource Effective Date: June 22, 2012 TONNES Cu Au Ag CuEq Cu Au Ag STOCKPILE (Mt) (%) (g/t) (g/t) (%) (M lbs) (oz) (oz) NORTH 3.33 0.78 0.58 10.3 1.25 56.99 62,100 1,100,900 SOUTH 2.20 0.33 0.49 5.1 0.69 16.16 34,700 360,000 NE 0.55 0.50 0.22 9.6 0.75 6.06 3,800 168,300 EAST 1.88 0.71 0.30 12.0 1.03 29.33 17,900 725,100 TOTALS 7.95 0.62 0.46 9.2 1.01 108.54 118,500 2,354,300 Notes on Mineral Resource Estimation 1. See Data in NI 43-101 Technical Report entitled “Technical Report on Mineral Resource Estimate of the Rosita Stockpiles” dated June 22, 2012 and filed on SEDAR. 2. The mineral resource estimate base case is reported at a 0.15% copper equivalent cut-off grade; this cut-off incorporates consideration of mining and processing cost, recoveries, commodity prices and selling cost. 3. The mineral resource estimate is reported on an undiluted basis. 4. The mineral resource estimate assumes a long term copper price of US$2.90/lb, a gold price of US$1,200/oz and a silver price of US$24/oz. 5. Rounding as required by NI 43-101 reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content. 6. Tonnage and grade measurements are in metric units. Contained gold and silver ounces are reported as troy ounces, contained copper pounds as imperial pounds. 7. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. 8. The quantity and grade of reported inferred mineral resources in this estimation are uncertain in nature and there has been insufficient exploration to define these inferred mineral resources as indicated or measured mineral resources and it is uncertain if further exploration will result in upgrading them to indicated or measured mineral resources. Robust resource base at low resource discovery cost of $0.01/lb Cu1 1. Based on the inferred copper mineral resource and total exploration expenditures of $900,000 12
  • 13. Santa Rita and R-13 Deposits 0.49Cu, 1.15Au, 4.4Ag/4m 29.54/8m 0.80Cu, 10.45Au, 21.83Ag/3m 1.42Cu, 0.18Au, 20.45Ag/10m 0.87Cu, 0.81Au, 7.96Ag/10m 6.90/8.0, 1.76/4m IP Anomaly Potential to add additional tonnage to an already robust stockpile resource Refer to press release dated Nov 1, 2012 13
  • 14. Santa Rita/R-13 Deposit Skarn Cu Mineralization 0.54Cu/ 24.4m 2.27Cu/ 16.7m Note: Alder has not yet verified the historic drill results reported herein and does not intend to use this information for purposes other than planning and prioritizing exploration targets. See News Release of May 31, 2012 and September 11, 2012 14
  • 15. Santa Rita/R-13 Deposit Skarn Au/Ag Mineralization Crosscutting New Gold Zones Note: Alder has not yet verified the historic drill results reported herein and does not intend to use this information for purposes other than planning and prioritizing exploration targets. See News Release of May 31, 2012 and September 11, 2012 15
  • 16. Santa Rita Targets A Multiple Cu-Au-Ag skarn targets, historic resource B Santa Rita/R-13 corridor, Cu-Au-Ag skarn C New Au discovery, 29.54 g/t Au/8m* D IP Anomaly Porphyry Cu target, strong porphyry textures, highly anomalous Cu, Au * Refer to news release dated Sept 5, 2012 16
  • 18. Bambana Targets • Located 4 km northwest of the Santa Rita deposit • Calibre Mining completed three drill holes that returned intercepts of up to 50 m grading 0.42% Cu, 7.00 g/t Ag and 11.5 m grading 0.51% Cu, 7.56 g/t Ag and 0.25 g/t Au • Prospect pit returned 2.8m grading 6.28% Cu, 0.74 g/t Au, 132.75 g/t Ag 18
  • 19. Bambana Area – T3 Prospect • Trench returned porphyry-style mineralization that included 12 m grading 3.32% Cu, 0.22 g/t Au and 37.55 g/t Ag • Rock-chip sampling at two benches returned two wide intercepts of 29 m grading 2.09% Cu, 0.19 g/t Au and 14.6 g/t Ag and 29 m grading 1.98% Cu, 0.14 g/t Au and 14.4 g/t Ag • 400 m drill program has successfully confirmed the presence of shallow, high grade, oxide copper and silver mineralization • Untested IP chargeability anomaly with porphyry copper potential Close proximity to the Santa Rita pit provides future development upside * Refer to news release dated Jun 13, 2012 and Nov 1, 2012 19
  • 20. Bambana Area – Tipispan Prospect • Historic drilling returned porphyry-style mineralization that included 50 m grading 0.42% Circular Magnetic Cu and 7.00 g/t Ag and 11.5 m grading 0.51% Feature Cu, 0.25 g/t Au and 10.41 g/t Ag BB10-03 • Rock-chip sampling at prospect pit returned 2.8 m grading 6.28% Cu, 0.74 g/t Au and 132.75 g/t Ag BB10-01 • Mineralized zone traced >200 m on surface and 0.42% Cu 7.00 g/t Ag / 50.0m 100 m vertical depth BB10-02 Tipispan 0.51 Cu, 0.25 Au 7.56 Ag / 11.5m T3 919 1.23 Cu, 0.36 Au, 10.63 Ag / 13.0m Zopilote* 920 176,000 tonnes @ 0.90% Cu 1.74 Cu, 0.09 Au, (Oxide) 16.64 Ag / 18.0m 79,000 tonnes @ 0.97% Cu (Sulphide) Close proximity to the Santa Rita pit provides future development upside * Refer to news release dated Nov 1, 2012 20
  • 21. Bambana Prospect – T3 Zone Bench Sample 3.07% Cu, 0.14 g/t Au and 14.4 g/t Ag over 1 m * Refer to news release dated Jun 13, 2012 and Nov 1, 2012 21
  • 22. Ground Magnetic Survey – 108 km A number of prospective anomalies warrant follow-up exploration work 22
  • 23. Geophysics Compilation IP Targets A number of prospective anomalies warrant follow-up exploration work 23
  • 24. Exploration and Development Timeline Milestone Q1 2013 Q2 2013 Q3 2013 Q4 2013 Diamond Drilling – Santa Rita (7,500 m) Diamond Drilling – Bambana (2,500 m) Metallurgical Testing Resource Estimate – Santa Rita Scoping Study General Exploration 24
  • 25. Reasons to Invest Past producing project Well positioned in a stable Robust resource base with with significant economic and emerging mining exploration upside potential district • Previously a high grade, open- • Located in the prolific Mining • Stockpiles include a NI 43-101 pit mine with historic Triangle of northeast compliant inferred resource of production of 245 million lbs Nicaragua, host to several 8 million tonnes containing Cu, 160,000 oz Au and 2.61 significant copper and gold 108.5 million lbs Cu, 118,500 million oz Ag porphyry deposits oz Au and 2.4 million oz Ag • Potential for project with • Stable, pro-mining government (1.01% Cu Eq. grade1)23 excellent economics at current with supportive mining laws • Excellent drill results illustrate copper price levels and an attractive mining tax the potential to establish a regime significant high grade resource 1. Assumes a long term copper price of US$2.90/lb, gold price of US$1,200/oz and silver price of US$24/oz. 2. See Data in NI 43-101 Technical Report entitled “Technical Report on Mineral Resource Estimate of the Rosita Stockpiles” dated June 22, 2012 and filed on SEDAR. 3. As reported in the news release issued by Alder on May 9, 2012, the inferred resource estimate totals 7.95 mt, at an average grade of 0.62% Cu, 0.46 g/t Au and 9.2 g/t Ag 25 with an overall copper equivalent grade of 1.01%. The inferred mineral resource contains 108 million pounds of Cu, 118,500 ounces of Au and 2.35 million ounces of Ag.
  • 26. TSX-V: ALR 65 Queen Street West, Suite 800 Toronto, ON, M5H 2M5 info@alderresources.ca Follow us: Joseph Arengi Don Dudek Michael McAllister President and CEO Chairman Manager, IR (416) 309-4296 (416) 861-2261 (416) 309-2134 jarengi@alderresources.ca mmcallister@alderresources.ca 26
  • 27. Santa Rita and R-13 Drill Highlights To Thickness Cu Au Ag Hole ID Area From (m) (m) (m) (%) (g/t) (g/t) D901 Sta Rita 75 85.9 10.9 0.36 0.15 6.32 " 89 92 3 0.12 1.27 3.57 D906 R-13 213 217 4 0.49 1.15 4.40 D910 Sta Rita 50 115 65 0.20 1.48 (1.00 cut) 2.00 Including 84 92 8 <0.1 6.90 (3.03 cut) <0.1 and 100 115 15 0.57 1.52 5.93 and 106 110 4 1.46 3.22 15.25 D911 R-13 173 179 6 0.05 1.86 3.15 and 262 292 30 0.31 1.10 5.78 including 289 292 3 0.80 10.45 (10.33 cut) 21.83 including 290 291 1 0.48 30.37 (30.00 cut) 11.6 D912 Santa Rita 156 158 2 1.24 1.45 12.25 and 197 201 4 0.03 1.76 0.09 D914 Sta Rita 235 250 15 0.04 15.82 (5.62 cut) 0.23 including 240 248 8 0.04 29.54 (9.38 cut) 0.29 including 241 243 2 0.04 110.69 (30.00 cut) 0.60 D915 Santa Rita 57 63 6 0.36 0.15 3.07 and 96 149 53 0.50 0.08 6.44 including 128 138 10 1.42 0.18 20.45 and 129 133 4 1.94 0.25 30.05 D916 Santa Rita 7 12 5 0.33 0.09 1.14 D917 Santa Rita 0 55 55 0.05 0.31 0.86 including 8 14 6 0.19 1.07 3.62 and 98 105 7 0.32 0.13 4.37 and 165 169 4 0.35 0.55 2.40 D918 Santa Rita 71 85 14 0.87 0.81 7.96 Excellent drill results illustrate the potential to establish a significant high grade resource Refer to press release dated May 31, 2011; Nov 1, 2012 27