1. Ajit Kumar
A-197 Gali No-20, New Ashok Nagger,Delhi, INDIA
Contact: +917859942214- & 9455323420,
Email: ajit5710646@gmail.com;
Career Objective:
I am looking forward to associate myself with an organization wherein, there is an
opportunity to share, contribute and upgrade my knowledge for development of self
and the organization served.
PROFESSIONAL PROFILE:
A Competitive Professional with 1.3 Years of Experience in managing
Wireless & Wired Networks in the Telecom Sector.
Comprehensive understanding of Wireless Networking concepts pertaining
to RF-GSM/WCDMA networks, GPRS, EDGE Technologies, Drive test on
TEMS 13.0.6 an investigation tool for GSM/WCDMA networks and
optimizing the network related parameters pertaining to capacity, quality,
coverage issues.
Complete conceptual Knowledge in Surveys of RF, LOS & EMF methodology
Along with the testing methods of BB (Broad Band).
Complete conceptual Knowledge in 11A , 11B & INC of Reliance jio 4G
project
TECHNICAL SKILLS:
Wireless Technologies: GPRS, EDGE, GSM, WCDMA.
Telecom tools: TEMS13.0.6investigation tools, mapinfo8.5, GPS-72,72h, Holux-
213U, Excal, Actix, SRM loder V1.2.0, DEV C, KVIL, ISIS. MICROPIC.
PROFESSIONAL EXPERIENCE:
RJIL (Comm4 Telecom India Pvt Ltd).
Duration: Feb 1 - till date.
Designation: Project Coordination & Manager
Present project: RJIL EMF CALCUTION & BROAD BAND, 11A & 11B also INC for
RJIL LTE TDD and FDD SCFT, CLOT.
Tool: VUZE, EXCAL for SCFT & CLOT, ACTIX, SRM loder V1.2.0
ROLES & RESPONSIBILITIES:
Select team members and, if cross-functional as the Core Team Leader, select
Core Team Members
2. Preparing project plan and obtain management approval of the project plan.
Assure that all team embers understand their roles and accept their
responsibilities.
Apply project resources according to the approved project plan.
Track and report on progress to plan.
Analyze the actual performance against the plan and make adjustments consistent
with plan objectives.
Assure timely adaptive action is taken
Establish and publish clear priorities among project activities.
Coordinate management and technical decisions.
Arbitrate and resolve conflict and interface problems within the project.
Provide input on the performance of project team members to their supervisors.
Ensuring EMF report preparation, validation & timely submission of same to
SAMSUNG within timelines.
Executing SCFT DRIVE for self-certification failed cases with EMF tools.
Executing BB test for self-certification failed cases with EMF tools.
Escalating access related issues/signage board related issues timely with RJIL
circle RF team.
Escalating access related 11A, 11B & INC with RJIL circle INC team.
Validating other Operator data received from RJIL wart actual site and make
report for the same.
Having a hands on Knowledge in NEP for uploading the technical data at a time
and upload the site photos individually.
Airtel Project in NSN & Idea Project in Huwai (NR Switch N Radio Pvt Ltd).
Designation: RF Engg
Duration: Jan 2015 to Feb -2016.
ROLES & RESPONSIBILITIES:
Worked as a EMF Co-ordinat or Planning the sites using the MAP info tool according
to the respective locations.
Carrying out advance planning for resource mobilization, manpower deployment and
rendering technical support ensuring the execution of projects within time, cost &
budgetary parameters.
Maintaining the tracker each and every engineer & grade them according to their
abilities & Performance.
Driving the report makers to prepare the reports depending on the customer
requirement & ensure the reports to client with in time lines.
Cross check the reports and sent into customer& upload the reports in their respective
portals.
Performed Drive Test using TEMS 13.0.5 investigation tool.
Planned Drive Test route based on the customer complaints.
Drive Test Data analysed for Optimizing parameters like C/I, C/A, Coverage, Call
Handover, Call Drop, Rx- Level and RX-Quality.
Proposing new sites to overcome Coverage Patches & filling Capacity Areas.
Involved in optimizing activities that include change of frequency, change of power,
Re-orientations, mechanical tilt, electrical tilt, and height changes.
Provided solutions for the worst cells of TCH traffic congestion that includes:
parameter adjustment, utilization of radio features, BTS upgrade recommendation.
3. Involved in new and existing sites optimization include improvement in TCH, RACH,
SDCCH drops and other drops due to quality or coverage issues.
EDUCATION DETAILS:
B.Tech in Electronics & Communication (2011-2015)
Institute of Technology And Management, 67%
XII (2009-2011)
Karmaraj Lion School, Sunderpur, Varanasi (CBSE), 53.3 %
X 2009
Vidyalaya Madhyamic School, Varanasi (CBSE), {SSC) 66%
PERSONAL DETAILS:
Name : Ajit Kumar
Father’s Name : Janardan Prasad Gupta
Date of Birth : 04-06-1994
Languages Known
Passport
:
:
English, Hindi
L8848171
Permanent Address : A-197 Gali No-20,
New Ashok Nagger, Delhi, INDIA
DECLERATION:
I hereby declare that the above mentioned information is correct up to my knowledge and I
bear the responsibility for the correctness of the above mentioned particulars.
AJIT KUMAR