SlideShare uma empresa Scribd logo
1 de 6
Baixar para ler offline
Personal CV
Updated 25/11/2013
1
Ahmed Tayssir Mohamed
Abu Dhabi, UAE
Mobile: (+971) 50 8103673
E-mail:a_tayssir@hotmail.com
ahmedtayssir@yahoo.com
CAREER OBJECTIVE
Seeking a challenging career in a professional organization where my skills of analysis, design,
communication and decision making can be further developed. I wish I would be member in
such organization and to work together to achieve organization objectives successfully and
efficiently.
EDUCATION BACKGROUND
Bachelor of: Electronic and Communication engineering, Faculty of Engineering, CAIRO
University, Egypt. (July 84)
Major : Communication &Electronics
MEMBERSHIP:
-Member of the Egyptian Engineering Syndicate.
PERSONAL DATA
Date of Birth January 21, 1961
Place of Birth Cairo, Egypt
Nationality Egyptian
Marital Status Married, (2 Childrens)
LANGUAGE SKILLS:
Perfect command of Arabic
Perfect command of French
Perfect command of English
COMPUTER SKILLS:
Microsoft office applications.
Internet applications
Flow Elements & Control Valves Calculation Applications
WORKING HISTORY:
27 years of experience as Instrument and control systems engineer.
EXPERIENCE:
Experience in Distributed Control Systems (DCS), PLCs, ESD System, instruments and
measurements for chemical and petroleum process industries.
Personal CV
Updated 25/11/2013
2
Feed and detailed engineering (EPC contracts), procurement services, inspection, installation
details, construction supervision, calibration, maintenance, pre-commissioning, commissioning
and start-up activities, dealing with group of engineers and draftsmen, being a member of a task
forces, conducting meetings with suppliers and clients, preparing projects' schedules, making
technical decisions in light of cost analysis and preparing budget and man-hours estimates for
projects' proposals.
Engineering works included the preparation of detailed specifications for field instruments and
plant control system, logic diagrams, loop diagrams, control room and field layouts, cable routing
details, detailed hook-up and interconnection drawings, preparation of MRQ's and relevant
technical evaluation reports.
A) Feed Engineering Phase:
Issuing of general instrument specifications.
Issuing of DCS/PLC specifications.
Issuing of Control System Overview.
Issuing of instruments data sheets.
Participation in preparing P&ID's and PFD reflecting all control loops and shutdown
philosophies.
Participation in preliminary HAZOP review meetings..
B) Detailed Engineering Phase:
Issuing of MRQ's and MRP's.
Technical bid evaluation and vendor print review.
Issuing of control room layout and cable routing layout.
Issuing of cable lists.
Issuing of M.T.O. for cables and bulks.
Issuing of instrument mechanical, electrical and pneumatic layouts.
Issuing of logic diagrams and Participation in Cause & Effect diagrams.
Issuing of instrument loop diagrams.
Issuing of junction boxes wiring diagram.
Issuing of Control System Database.
Issuing of Control System Graphic Display Diagrams.
Change order evaluation.
C) Site Supervision Phase:
Supervision of the instrumentation construction works which included the following activities:
Cable trays installation.
Cable laying, termination and testing.
Junction boxes installation.
Instrument calibration (switches, transmitters, gauges, automatic tank gauging, …etc)
Instrument installation.
DCS/PLC system installation.
Loop checks with DCS/PLC systems.
Start-up of the plant within the start-up team.
Site technical support activities including construction problem analysis and clearance.
Prepration and issuance of as built drawings.
Personal CV
Updated 25/11/2013
3
D) Inspection Services:
Perform factory acceptance test including system configuration, assuring compliance with
equipment specification, software testing, preparing of punch list and recommendations.
1st-Performed factory acceptance test including system configuration for the following:
-Instrument air compressor control panel, PLC, Model telemechanique at THOME CREPELLE –
FRANCE.
-Control room equipment package including HONEYWELL TDC3000 DCS, SIEMENS PLC and
Marshalling panel at VONK system, HOLLAND.
-Control room equipment package including 4 PLCs, Marshalling panels and supervisory
stations (2 operator work stations and one Engineering work station) at ALSTOM-ITALY.
2nd-Inspection and Testing for the following:
-Level transmitters at MASONEILLAN-FRANCE.
-Level switches at MAGNETROL-BELGIUM.
-Enppi instrument work shop at TRADINCO-HOLLAND.
E) Engineering Review :
-Basic Engineering review for GUPCO-HAP’Y PROJECT at AGIP-ITALY
-Participate with Bechtel USA in the feed engineering for the Egyptian LNG project.
Work History
1-AMEC International Company
From June 15, 2014 till present, (Senior Instrument & Control engineer, PMC for ADMA project
UMM LULU phase 2)
-Define technical requirements and the performance of engineering for the assigned works.
-Review engineering design carried out by consultant/Engineering companies.
-Participate in the clarification meetings with contractors and Vendors to ensure
Compliance with technical specifications &requirements.
2-ABU DHABI COMPANY FOR ONSHORE OIL OPERATION
From May 12, 2013 till May 31, 2014 (Senior Control Engineer, PMC)
-Define technical requirements and the performance of engineering for the assigned works.
-Review engineering design carried out by consultant/Engineering companies including basic
and detailed engineering.
-Prepare technical documents including SOW, Data sheets and requirements for material,
testing and requisitions.
-Carry out basic technical assessment of bid documents for services and material required for
the works.
-Participate in the clarification meetings with contractors and Vendors to ensure
compliance with technical specifications &requirements.
-Provide Technical Evaluation reports.
Personal CV
Updated 25/11/2013
4
3-CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY(CCC):
From June 7,2009 to March 21, 2013 (Senior Project Design Engineer-Instrument)
Worked as I&CS (Instrument and Control Systems) Senior Project Design Engineer on the
following projects:
Ras Laffan Port Expansion Project:
Detail engineering, procurement and supply for all field instruments, F&G Detection system for
approx.90 buildings, Packages PLC’s, SCADA system and interfacing of the new systems with
Plant DCS (by others).
Responsibility:
- Instrument leader, leading a team of nine engineers and six designers.
-Participate in the development and updating of the cost Estimates and schedules for the works.
-Carry out basic technical assessment of bid documents for services and material required for
the project.
- Participate in the clarification meetings with Client and Vendors to ensure compliance with
technical specifications &requirements.
Al-Hosan Gas, SHAH Sulfur Plant Project
Project Details: Installation of two Sulfur storage Tanks at SHAH Plant.
Instrument scope of work is to purchase all the field instruments, cables, bulk materials,
control and On/Off Valves.
Design and purchase of new DCS and relevant detailed engineering documents.
Responsibility: Instrument leader, leading a team of three engineers and two designers.
4-ABU DHABI GAS LIQUEFACTION COMPANY (ADGAS):
From March 04, 2004 to May 31, 2009 (Senior Instrument & Control Eng, PMC)
-Define technical requirements and the performance of engineering for the assigned works.
-Review engineering design carried out by consultant/Engineering companies including
feasibility, conceptual, basic and detailed engineering.
-Prepare technical documents including SOR, Data sheets and requirements for material, testing
and requisitions.
-Carry out basic technical assessment of bid documents for services and material required for
the works. Participate in the clarification meetings with contractors and Vendors to ensure
compliance with technical specifications &requirements.
-Provide Technical Evaluation and Appraisal reports.
-Review the update technical drawings for the installations and ensure conformity of the as-built
status with the Design and Technical requirements.
-Participate in the development and updating of the cost Estimates and schedules for the works.
5-PAN EMIRATES ENGINEERING LIMITED:
From May 19, 2003 to Feb 28, 2004 (Senior Instrument Engineer)
Worked on the following projects:
. GASCO, Installation of new side entry mixers
. ADMA, Nitrogen Package
. ADCO, Asab Artificial Lift Wells
Personal CV
Updated 25/11/2013
5
. Prepare Instrument general specifications.
6-Engineering for Petroleium & Petrochemical Industries (ENPPI) Nov.93 to May 03:
I-From Jan.01, 1998 to May 18, 2003 (Senior Lead Instrument Engineer)
Worked as I&CS (Instrument and Control Systems) Senior Lead Engineer on the following
projects:
Egyptian LNG Project
Participate with Bechtel USA in the FEED Engineering, scope of FEED phase is to issue
project specification, control system specification, issue project valves specification
sheets and prepare all field instruments’ preliminary specification sheets.
Responsibility: Instrument leader.
UGDC, Propane storage Tanks
Project Details: Installation of two Propane storage Tanks at Demiatta port. Instrument
scope of work is to purchase all the field instruments, cables, bulk materials, control and
On/Off Valves.
Design and purchase of new DCS and relevant detailed engineering documents.
Responsibility: Instrument leader, leading a team of three engineers and two designers.
GUPCO, Ha’py Field Development
Project Details : Participate with AGIP-Italy in the Feed Engineering , scope of FEED phase
is to issue project specifications and prepare all Field Instruments preliminary specification
sheets for project MTO.
Participate with AGIP in the detailed engineering phase, scope of detailed engineering is to
prepare all purchase order for field instruments, valves, cables,trays and all required Bulk
Materials.
Responsibility: Instrument leader leading a team of two engineers and two designers.
SIDEPEC, Utilities & Offsite Facilities
Project Details: Instrument scope of work is to purchase all the field instruments, cables, bulk
materials, control and On/Off Valves. Design and purchase of new control system and
relevant detailed engineering documents. Participate in construction, installation and
commissioning of the plant.
Responsibility: Instrument leader, leading a team of three engineers and three designers.
Alex.Petroleum Company, Spent oil Re-Refining Plant
Project Details: Instrument scope of work is to purchase all the field instruments, cables, bulk
materials, control and On/Off Valves. Design and purchase of new control
system(Honeywell TDC3000, Siemens PLC) and relevant detailed engineering documents.
Participate in construction, installation and commissioning of the plant.
Responsibility: Instrument leader, leading a team of three engineers and three designers.
II-From Nov.1,1993 to Dec.31,1997 Worked as I&CS (Instrument and Control Systems) senior
engineer on the following projects:
GEISUM Tie-Ins to SUCO Zeit-Bay
Personal CV
Updated 25/11/2013
6
KHALDA, Plant upgrading
Misr Petroleum company Company, Lube Oil Plant
WORK EXPERIENCE PRIOR TO ENPPI:
From Jan.01,1987 to Oct.31,1993 (Inst. Maintenance Eng.) with GEISUM/CONOCO oil
company:
Responsible for:
* Preventive maintenance and instrument calibration.
*Wellheads control panel maintenance.
*Responsible for support and maintenance of plant control systems based on ALLEN BRADLEY
PLC-5 systems.
*Review stock data reports to identify fast or slow moving items and make recommendation for
future holding levels.
TRAINING COURSES:
Instrument and controls, KILGORE COLLEGE, TEXAS USA
Advanced process control techniques, COMEX-EGYPT.
Design and maintenance for pneumatic control system, GEISUM-EGYPT.
Safety and relief valves, ENPPI-EGYPT.
Honeywell TDC 3000, US implementation, HONEYWELL-BELGIUM.
Dynamic simulation, HYPROTECH, CALGARY-CANADA.
Supervision skills, AMA-CHICAGO, USA
Communications skills, ENPPI, Egypt
Problem solving and decision-making, ENPPI, Egypt

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Irfan Eker CV January 2015
Irfan Eker CV January 2015Irfan Eker CV January 2015
Irfan Eker CV January 2015
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
Resume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineerResume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineer
 
MOHAMED SALEM C.V
MOHAMED  SALEM  C.VMOHAMED  SALEM  C.V
MOHAMED SALEM C.V
 
Peter Fru, Curriculum Vitae
Peter Fru, Curriculum VitaePeter Fru, Curriculum Vitae
Peter Fru, Curriculum Vitae
 
Uday Kiran Updated Resume
Uday Kiran Updated ResumeUday Kiran Updated Resume
Uday Kiran Updated Resume
 
Mohamed Saleh fathy final cv.doc
Mohamed Saleh fathy  final cv.docMohamed Saleh fathy  final cv.doc
Mohamed Saleh fathy final cv.doc
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
 
Mrunal--CV Latest
Mrunal--CV LatestMrunal--CV Latest
Mrunal--CV Latest
 
Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Automation Engineer r3 2-2015
Automation Engineer r3 2-2015
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)
 
CV
CVCV
CV
 
CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
 
Isa-sachin-upstream-onshore.ppt
Isa-sachin-upstream-onshore.pptIsa-sachin-upstream-onshore.ppt
Isa-sachin-upstream-onshore.ppt
 

Destaque

Net proiect-diagnostic-si-strategiile-firmei
Net proiect-diagnostic-si-strategiile-firmeiNet proiect-diagnostic-si-strategiile-firmei
Net proiect-diagnostic-si-strategiile-firmeiConstantin Prisecaru
 
Pravin Chand Resume 2016 pdf
Pravin Chand Resume 2016 pdfPravin Chand Resume 2016 pdf
Pravin Chand Resume 2016 pdfPravin Chand
 
Net proiect-diagnostic-si-strategiile-firmei
Net proiect-diagnostic-si-strategiile-firmeiNet proiect-diagnostic-si-strategiile-firmei
Net proiect-diagnostic-si-strategiile-firmeiConstantin Prisecaru
 
How business can earn more revenue by making an efficient website?
How business can earn more revenue by making an efficient website?How business can earn more revenue by making an efficient website?
How business can earn more revenue by making an efficient website?TechPro Studio
 
cyp4f2-danya and rana
cyp4f2-danya and ranacyp4f2-danya and rana
cyp4f2-danya and ranadanya yousief
 
Why websites will never die?
Why websites will never die?Why websites will never die?
Why websites will never die?TechPro Studio
 

Destaque (10)

Las tics en el turismo
Las tics en el turismoLas tics en el turismo
Las tics en el turismo
 
Net proiect-diagnostic-si-strategiile-firmei
Net proiect-diagnostic-si-strategiile-firmeiNet proiect-diagnostic-si-strategiile-firmei
Net proiect-diagnostic-si-strategiile-firmei
 
Pravin Chand Resume 2016 pdf
Pravin Chand Resume 2016 pdfPravin Chand Resume 2016 pdf
Pravin Chand Resume 2016 pdf
 
Net proiect-diagnostic-si-strategiile-firmei
Net proiect-diagnostic-si-strategiile-firmeiNet proiect-diagnostic-si-strategiile-firmei
Net proiect-diagnostic-si-strategiile-firmei
 
Barcamp 2016
Barcamp 2016Barcamp 2016
Barcamp 2016
 
How business can earn more revenue by making an efficient website?
How business can earn more revenue by making an efficient website?How business can earn more revenue by making an efficient website?
How business can earn more revenue by making an efficient website?
 
cyp4f2-danya and rana
cyp4f2-danya and ranacyp4f2-danya and rana
cyp4f2-danya and rana
 
Why websites will never die?
Why websites will never die?Why websites will never die?
Why websites will never die?
 
Pasos para producir un video
Pasos para producir un videoPasos para producir un video
Pasos para producir un video
 
Pasos para producir un video
Pasos para producir un video Pasos para producir un video
Pasos para producir un video
 

Semelhante a tayssircv_(2)1

(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)Ahmed Kamal
 
Mohamed Hesham - Mechanical Engineer
Mohamed Hesham - Mechanical EngineerMohamed Hesham - Mechanical Engineer
Mohamed Hesham - Mechanical EngineerMohamed Hesham
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1Mohamed Hashim
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa Omar
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer zahirtec
 
Project standards and_specifications_instrumentation_project_engineering_rev01
Project standards and_specifications_instrumentation_project_engineering_rev01Project standards and_specifications_instrumentation_project_engineering_rev01
Project standards and_specifications_instrumentation_project_engineering_rev01gsm0021
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobJibin Jacob
 

Semelhante a tayssircv_(2)1 (20)

(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
Antar Mustafa CV
Antar Mustafa CVAntar Mustafa CV
Antar Mustafa CV
 
CV
CVCV
CV
 
Mohamed Hesham - Mechanical Engineer
Mohamed Hesham - Mechanical EngineerMohamed Hesham - Mechanical Engineer
Mohamed Hesham - Mechanical Engineer
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer
 
MCV
MCVMCV
MCV
 
Veronica Atef Ramzy
Veronica Atef RamzyVeronica Atef Ramzy
Veronica Atef Ramzy
 
Project standards and_specifications_instrumentation_project_engineering_rev01
Project standards and_specifications_instrumentation_project_engineering_rev01Project standards and_specifications_instrumentation_project_engineering_rev01
Project standards and_specifications_instrumentation_project_engineering_rev01
 
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
 
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
 
CV updated February 2017
CV updated  February 2017CV updated  February 2017
CV updated February 2017
 
LAMINE Anouar en
LAMINE Anouar enLAMINE Anouar en
LAMINE Anouar en
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Resume raj bharath be
Resume raj bharath beResume raj bharath be
Resume raj bharath be
 
EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
CV
CVCV
CV
 

tayssircv_(2)1

  • 1. Personal CV Updated 25/11/2013 1 Ahmed Tayssir Mohamed Abu Dhabi, UAE Mobile: (+971) 50 8103673 E-mail:a_tayssir@hotmail.com ahmedtayssir@yahoo.com CAREER OBJECTIVE Seeking a challenging career in a professional organization where my skills of analysis, design, communication and decision making can be further developed. I wish I would be member in such organization and to work together to achieve organization objectives successfully and efficiently. EDUCATION BACKGROUND Bachelor of: Electronic and Communication engineering, Faculty of Engineering, CAIRO University, Egypt. (July 84) Major : Communication &Electronics MEMBERSHIP: -Member of the Egyptian Engineering Syndicate. PERSONAL DATA Date of Birth January 21, 1961 Place of Birth Cairo, Egypt Nationality Egyptian Marital Status Married, (2 Childrens) LANGUAGE SKILLS: Perfect command of Arabic Perfect command of French Perfect command of English COMPUTER SKILLS: Microsoft office applications. Internet applications Flow Elements & Control Valves Calculation Applications WORKING HISTORY: 27 years of experience as Instrument and control systems engineer. EXPERIENCE: Experience in Distributed Control Systems (DCS), PLCs, ESD System, instruments and measurements for chemical and petroleum process industries.
  • 2. Personal CV Updated 25/11/2013 2 Feed and detailed engineering (EPC contracts), procurement services, inspection, installation details, construction supervision, calibration, maintenance, pre-commissioning, commissioning and start-up activities, dealing with group of engineers and draftsmen, being a member of a task forces, conducting meetings with suppliers and clients, preparing projects' schedules, making technical decisions in light of cost analysis and preparing budget and man-hours estimates for projects' proposals. Engineering works included the preparation of detailed specifications for field instruments and plant control system, logic diagrams, loop diagrams, control room and field layouts, cable routing details, detailed hook-up and interconnection drawings, preparation of MRQ's and relevant technical evaluation reports. A) Feed Engineering Phase: Issuing of general instrument specifications. Issuing of DCS/PLC specifications. Issuing of Control System Overview. Issuing of instruments data sheets. Participation in preparing P&ID's and PFD reflecting all control loops and shutdown philosophies. Participation in preliminary HAZOP review meetings.. B) Detailed Engineering Phase: Issuing of MRQ's and MRP's. Technical bid evaluation and vendor print review. Issuing of control room layout and cable routing layout. Issuing of cable lists. Issuing of M.T.O. for cables and bulks. Issuing of instrument mechanical, electrical and pneumatic layouts. Issuing of logic diagrams and Participation in Cause & Effect diagrams. Issuing of instrument loop diagrams. Issuing of junction boxes wiring diagram. Issuing of Control System Database. Issuing of Control System Graphic Display Diagrams. Change order evaluation. C) Site Supervision Phase: Supervision of the instrumentation construction works which included the following activities: Cable trays installation. Cable laying, termination and testing. Junction boxes installation. Instrument calibration (switches, transmitters, gauges, automatic tank gauging, …etc) Instrument installation. DCS/PLC system installation. Loop checks with DCS/PLC systems. Start-up of the plant within the start-up team. Site technical support activities including construction problem analysis and clearance. Prepration and issuance of as built drawings.
  • 3. Personal CV Updated 25/11/2013 3 D) Inspection Services: Perform factory acceptance test including system configuration, assuring compliance with equipment specification, software testing, preparing of punch list and recommendations. 1st-Performed factory acceptance test including system configuration for the following: -Instrument air compressor control panel, PLC, Model telemechanique at THOME CREPELLE – FRANCE. -Control room equipment package including HONEYWELL TDC3000 DCS, SIEMENS PLC and Marshalling panel at VONK system, HOLLAND. -Control room equipment package including 4 PLCs, Marshalling panels and supervisory stations (2 operator work stations and one Engineering work station) at ALSTOM-ITALY. 2nd-Inspection and Testing for the following: -Level transmitters at MASONEILLAN-FRANCE. -Level switches at MAGNETROL-BELGIUM. -Enppi instrument work shop at TRADINCO-HOLLAND. E) Engineering Review : -Basic Engineering review for GUPCO-HAP’Y PROJECT at AGIP-ITALY -Participate with Bechtel USA in the feed engineering for the Egyptian LNG project. Work History 1-AMEC International Company From June 15, 2014 till present, (Senior Instrument & Control engineer, PMC for ADMA project UMM LULU phase 2) -Define technical requirements and the performance of engineering for the assigned works. -Review engineering design carried out by consultant/Engineering companies. -Participate in the clarification meetings with contractors and Vendors to ensure Compliance with technical specifications &requirements. 2-ABU DHABI COMPANY FOR ONSHORE OIL OPERATION From May 12, 2013 till May 31, 2014 (Senior Control Engineer, PMC) -Define technical requirements and the performance of engineering for the assigned works. -Review engineering design carried out by consultant/Engineering companies including basic and detailed engineering. -Prepare technical documents including SOW, Data sheets and requirements for material, testing and requisitions. -Carry out basic technical assessment of bid documents for services and material required for the works. -Participate in the clarification meetings with contractors and Vendors to ensure compliance with technical specifications &requirements. -Provide Technical Evaluation reports.
  • 4. Personal CV Updated 25/11/2013 4 3-CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY(CCC): From June 7,2009 to March 21, 2013 (Senior Project Design Engineer-Instrument) Worked as I&CS (Instrument and Control Systems) Senior Project Design Engineer on the following projects: Ras Laffan Port Expansion Project: Detail engineering, procurement and supply for all field instruments, F&G Detection system for approx.90 buildings, Packages PLC’s, SCADA system and interfacing of the new systems with Plant DCS (by others). Responsibility: - Instrument leader, leading a team of nine engineers and six designers. -Participate in the development and updating of the cost Estimates and schedules for the works. -Carry out basic technical assessment of bid documents for services and material required for the project. - Participate in the clarification meetings with Client and Vendors to ensure compliance with technical specifications &requirements. Al-Hosan Gas, SHAH Sulfur Plant Project Project Details: Installation of two Sulfur storage Tanks at SHAH Plant. Instrument scope of work is to purchase all the field instruments, cables, bulk materials, control and On/Off Valves. Design and purchase of new DCS and relevant detailed engineering documents. Responsibility: Instrument leader, leading a team of three engineers and two designers. 4-ABU DHABI GAS LIQUEFACTION COMPANY (ADGAS): From March 04, 2004 to May 31, 2009 (Senior Instrument & Control Eng, PMC) -Define technical requirements and the performance of engineering for the assigned works. -Review engineering design carried out by consultant/Engineering companies including feasibility, conceptual, basic and detailed engineering. -Prepare technical documents including SOR, Data sheets and requirements for material, testing and requisitions. -Carry out basic technical assessment of bid documents for services and material required for the works. Participate in the clarification meetings with contractors and Vendors to ensure compliance with technical specifications &requirements. -Provide Technical Evaluation and Appraisal reports. -Review the update technical drawings for the installations and ensure conformity of the as-built status with the Design and Technical requirements. -Participate in the development and updating of the cost Estimates and schedules for the works. 5-PAN EMIRATES ENGINEERING LIMITED: From May 19, 2003 to Feb 28, 2004 (Senior Instrument Engineer) Worked on the following projects: . GASCO, Installation of new side entry mixers . ADMA, Nitrogen Package . ADCO, Asab Artificial Lift Wells
  • 5. Personal CV Updated 25/11/2013 5 . Prepare Instrument general specifications. 6-Engineering for Petroleium & Petrochemical Industries (ENPPI) Nov.93 to May 03: I-From Jan.01, 1998 to May 18, 2003 (Senior Lead Instrument Engineer) Worked as I&CS (Instrument and Control Systems) Senior Lead Engineer on the following projects: Egyptian LNG Project Participate with Bechtel USA in the FEED Engineering, scope of FEED phase is to issue project specification, control system specification, issue project valves specification sheets and prepare all field instruments’ preliminary specification sheets. Responsibility: Instrument leader. UGDC, Propane storage Tanks Project Details: Installation of two Propane storage Tanks at Demiatta port. Instrument scope of work is to purchase all the field instruments, cables, bulk materials, control and On/Off Valves. Design and purchase of new DCS and relevant detailed engineering documents. Responsibility: Instrument leader, leading a team of three engineers and two designers. GUPCO, Ha’py Field Development Project Details : Participate with AGIP-Italy in the Feed Engineering , scope of FEED phase is to issue project specifications and prepare all Field Instruments preliminary specification sheets for project MTO. Participate with AGIP in the detailed engineering phase, scope of detailed engineering is to prepare all purchase order for field instruments, valves, cables,trays and all required Bulk Materials. Responsibility: Instrument leader leading a team of two engineers and two designers. SIDEPEC, Utilities & Offsite Facilities Project Details: Instrument scope of work is to purchase all the field instruments, cables, bulk materials, control and On/Off Valves. Design and purchase of new control system and relevant detailed engineering documents. Participate in construction, installation and commissioning of the plant. Responsibility: Instrument leader, leading a team of three engineers and three designers. Alex.Petroleum Company, Spent oil Re-Refining Plant Project Details: Instrument scope of work is to purchase all the field instruments, cables, bulk materials, control and On/Off Valves. Design and purchase of new control system(Honeywell TDC3000, Siemens PLC) and relevant detailed engineering documents. Participate in construction, installation and commissioning of the plant. Responsibility: Instrument leader, leading a team of three engineers and three designers. II-From Nov.1,1993 to Dec.31,1997 Worked as I&CS (Instrument and Control Systems) senior engineer on the following projects: GEISUM Tie-Ins to SUCO Zeit-Bay
  • 6. Personal CV Updated 25/11/2013 6 KHALDA, Plant upgrading Misr Petroleum company Company, Lube Oil Plant WORK EXPERIENCE PRIOR TO ENPPI: From Jan.01,1987 to Oct.31,1993 (Inst. Maintenance Eng.) with GEISUM/CONOCO oil company: Responsible for: * Preventive maintenance and instrument calibration. *Wellheads control panel maintenance. *Responsible for support and maintenance of plant control systems based on ALLEN BRADLEY PLC-5 systems. *Review stock data reports to identify fast or slow moving items and make recommendation for future holding levels. TRAINING COURSES: Instrument and controls, KILGORE COLLEGE, TEXAS USA Advanced process control techniques, COMEX-EGYPT. Design and maintenance for pneumatic control system, GEISUM-EGYPT. Safety and relief valves, ENPPI-EGYPT. Honeywell TDC 3000, US implementation, HONEYWELL-BELGIUM. Dynamic simulation, HYPROTECH, CALGARY-CANADA. Supervision skills, AMA-CHICAGO, USA Communications skills, ENPPI, Egypt Problem solving and decision-making, ENPPI, Egypt