ABOUT THE COMPANY


NTPC Limited is the largest thermal power generating
company of India.



It's a public sector company, and was incorporated in the year
1975 to accelerate power development in the country as a
wholly owned company of the Government of India.



At present, Government of India holds 89.5% of the total
equity shares of the company and the balance 10.5% is held
by FIIs, Domestic Banks, Public and others.



The Company other business includes providing consultancy,
project management and supervision, oil and gas exploration,
power trading and coal mining.


As of march 31, 2011, the Company was executing two
projects: Tapovan Hydro Electric Project and Rammam Hydro
Electric Project.



As of March 31, 2011, the Company had installed capacity in
India was 173626.4 mega-watts.



As of March 31, 2011, the Company had five subsidiaries:
NTPC Electric Supply Company Limited, NTPC Vidyut Vyapar
Nigam Limited, NTPC Hydro Limited, Kanti Bijlee Utpadan
Nigam Limited and Bhartiya Rail Bijlee Company Limited.



It was conferred the status of “NAVRATNA” by GOL in 1997
which was raised to “MAHARATNA” in May, 2010.
COMPETETITORS’ OVERVIEW


Tata Power



Reliance Energy



CESC



Adani Power



Torrent Power
SWOT ANALYSIS OF NTPC


COMPETETIVE STRENGTH:

- Leadership position in the Indian power sector
- Strong cash flow
- Effective project implementation
- Sound customer relations and commercial performance
- High operational efficiency of coal-based stations
- Operational efficiency
- Long term agreements for coal and gas supply
- Strategic locations near fuel source
- Ability to turn around underperforming stations
- Strong balance sheet
- Emphasis on corporate governance
WEAKNESS:
- Depleting raw material
- Some plants have become old & need renovation &
modernization


OPPORTUNITIES:
- Huge demand & supply gap
- Upcoming hydro & nuclear sector
- Huge opportunities in consultancy services


 THREATS:

- Rising prices of raw material
- Rising competition from private players like Reliance Energy,
Tata Power etc.
NTPC FUTURE STRATEGY


Maintain market leadership



Improve their operating performance



Pursue fuel security



Diversified fuel mix
RESEARCH METHODOLOGY

-

OBJECTIVE OF THE STUDY:
To study the relative benefits of appraising the thermal project
through balance sheet financing or financing via creating a
special purpose entity & making comparative analysis on the
basis of cost & benefits.

LIMITATION OF STUDY:
- This study is done from the perspective of NTPC Ltd. only.
- Generic Approach in case of Project Assumptions.


METHODOLOGY ADOPTED:
- Data collection is purely Secondary.
- The analysis has been carried out on the basis of Project
information, Assumptions & other necessary details given by
NTPC.

ASSUMPTIONS













Gross capacity of power plant is at 1000 MW(500 * 2)
COD of unit I is assumed to occur after 56 months from the date of main
plant & unit –II is 6 months onwards (62 months after the contract)
Date of project cost has to be taken at 30 Nov 2016
Rupee term loan: equity ratio is assumed to be 70:30
Plant load factor is taken at 85 %
Auxiliary consumption is assumed at 7 % of the gross energy generated.
Tariff has been taken as CERC (terms & conditions for determination of
tariff ) regulation prevalent currently(except escalation in tax & O & M
cost)
Interest in case of debt under balance sheet financing - 11%
Depreciation to be charged on the total cost assuming that total cost
(except land cost) incurred on plant to be phased out in equal proportion
on both the units.
ROE & O & M expenses calculations of Unit I & II we take in equal
proportions.


Interest in case of SPV route is- 12 %



Repayment in case of balance sheet financing -8 years ( 4 yrs after starting
the project)



Interest in case of working capital financing from bank is taken at 11.75 %



Secondary fuel consumption is taken at 1 ml/Kwh



Cost of coal = Rs. 850/1000 kg(primary fuel )



Cost of secondary fuel = Rs. 40/1000 ml with an annual escalation of 0 %.



O & M expenses has been assumed at 0.125 Cr/MW with an annual
escalation of 0 %



Working capital requirements has been assumed as 1 month ;O& M
expenses ;spares =20 % of O & M expenses & coal cost & secondary fuel
cost (2 months value taken)



Company act depreciation -5.28 %; subject to the asset being depreciated till
95 % of cost price.



CERC depreciation -5.28 % p.a. SLM for first 12 years & then spread evenly
over the balanced life of the project.



The project life is assumed to be 25 years in line with the CERC guidelines
prevalent currently.
CONCLUSION


Balance Sheet Financing is the Favoured mode of Financing
for the Company due to following reasons:

- Long experience of the Company in Operation of Power plants
- Strong Balance Sheet
- Lower risk due to long term PPA which combines to allow the
company to raise loans at significantly lower rates.


All these reasons helps to reduce the WACC of the company
and it enjoys decent long term returns.

More Related Content

What's hot

Project on expense booking in the service and stores section of F&A dept. of ...
Project on expense booking in the service and stores section of F&A dept. of ...Project on expense booking in the service and stores section of F&A dept. of ...
Project on expense booking in the service and stores section of F&A dept. of ...
CA Abhimanyu Chakraborty
 
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Ashish Singla
 

What's hot (14)

Gastech 2014
Gastech 2014Gastech 2014
Gastech 2014
 
Project on expense booking in the service and stores section of F&A dept. of ...
Project on expense booking in the service and stores section of F&A dept. of ...Project on expense booking in the service and stores section of F&A dept. of ...
Project on expense booking in the service and stores section of F&A dept. of ...
 
Gas power-infrastructure
Gas power-infrastructureGas power-infrastructure
Gas power-infrastructure
 
Green Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model ToolkitGreen Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model Toolkit
 
SunBurn Test Presentation
SunBurn Test PresentationSunBurn Test Presentation
SunBurn Test Presentation
 
LNG Facility GHG Mitigation Options - Government of Nova Scotia
LNG Facility GHG Mitigation Options - Government of Nova ScotiaLNG Facility GHG Mitigation Options - Government of Nova Scotia
LNG Facility GHG Mitigation Options - Government of Nova Scotia
 
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
LNG proposed standardsNova Scotia Liquefied Natural Gas Proposed Greenhouse G...
 
Bihar policy for promotion of new and renewable energy sources 2011
Bihar policy for promotion of new and renewable energy sources 2011Bihar policy for promotion of new and renewable energy sources 2011
Bihar policy for promotion of new and renewable energy sources 2011
 
IEA-GHG activities and possible collaboration with IEA-ETSAP
IEA-GHG activities and possible collaboration with IEA-ETSAPIEA-GHG activities and possible collaboration with IEA-ETSAP
IEA-GHG activities and possible collaboration with IEA-ETSAP
 
Naice 2010 SPE powerpoint
Naice 2010 SPE powerpointNaice 2010 SPE powerpoint
Naice 2010 SPE powerpoint
 
Affordable 24x7 Power To All @2019- Fuel Security & Distribution Reforms
Affordable 24x7 Power To All @2019- Fuel Security & Distribution Reforms Affordable 24x7 Power To All @2019- Fuel Security & Distribution Reforms
Affordable 24x7 Power To All @2019- Fuel Security & Distribution Reforms
 
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
 
2014 Annual Results ENG 20150404
2014 Annual Results ENG 201504042014 Annual Results ENG 20150404
2014 Annual Results ENG 20150404
 
IEM –Integrated energy management
IEM –Integrated energy managementIEM –Integrated energy management
IEM –Integrated energy management
 

Viewers also liked

Comparative income statement
Comparative income statementComparative income statement
Comparative income statement
Adil Shaikh
 
Analysis Of Annual Report Nestle
Analysis Of Annual Report NestleAnalysis Of Annual Report Nestle
Analysis Of Annual Report Nestle
Ashish Khera
 
Comparitive and common size
Comparitive and common sizeComparitive and common size
Comparitive and common size
Jaswinder Singh
 
Analysis of financial statements
Analysis of financial statementsAnalysis of financial statements
Analysis of financial statements
Adil Shaikh
 
Introduction To Financial Statements And Audit
Introduction To Financial Statements And AuditIntroduction To Financial Statements And Audit
Introduction To Financial Statements And Audit
Mobasher Ali
 
Cipla Balance Sheet analysis
Cipla Balance Sheet analysisCipla Balance Sheet analysis
Cipla Balance Sheet analysis
NewGate India
 
A Project Report On Financial Analysis Of Eicher Motors Limited
A Project Report On Financial Analysis Of Eicher Motors LimitedA Project Report On Financial Analysis Of Eicher Motors Limited
A Project Report On Financial Analysis Of Eicher Motors Limited
Bhavik Parmar
 

Viewers also liked (20)

Comparative income statement
Comparative income statementComparative income statement
Comparative income statement
 
A project report on analysis of financial statement of icici bank
A project report on analysis of financial statement of  icici bankA project report on analysis of financial statement of  icici bank
A project report on analysis of financial statement of icici bank
 
Analysis Of Annual Report Nestle
Analysis Of Annual Report NestleAnalysis Of Annual Report Nestle
Analysis Of Annual Report Nestle
 
Comparitive and common size
Comparitive and common sizeComparitive and common size
Comparitive and common size
 
Project Report on Financial Statement Analysis
Project Report on Financial Statement AnalysisProject Report on Financial Statement Analysis
Project Report on Financial Statement Analysis
 
Analysis of financial statements
Analysis of financial statementsAnalysis of financial statements
Analysis of financial statements
 
A project report on financial statement analysis
A project report on financial statement analysisA project report on financial statement analysis
A project report on financial statement analysis
 
Financial analysis
Financial analysisFinancial analysis
Financial analysis
 
Introduction To Financial Statements And Audit
Introduction To Financial Statements And AuditIntroduction To Financial Statements And Audit
Introduction To Financial Statements And Audit
 
Cipla Balance Sheet analysis
Cipla Balance Sheet analysisCipla Balance Sheet analysis
Cipla Balance Sheet analysis
 
Ratio analysis @ gadag textile mill project report mba finance
Ratio analysis @ gadag textile mill project report mba financeRatio analysis @ gadag textile mill project report mba finance
Ratio analysis @ gadag textile mill project report mba finance
 
A project report on analysis and interpretation of 10 years financial statements
A project report on analysis and interpretation of 10 years financial statementsA project report on analysis and interpretation of 10 years financial statements
A project report on analysis and interpretation of 10 years financial statements
 
A Project Report On Financial Analysis Of Eicher Motors Limited
A Project Report On Financial Analysis Of Eicher Motors LimitedA Project Report On Financial Analysis Of Eicher Motors Limited
A Project Report On Financial Analysis Of Eicher Motors Limited
 
3 years comparative ratio, trend analysis and common size statement of bajaj ...
3 years comparative ratio, trend analysis and common size statement of bajaj ...3 years comparative ratio, trend analysis and common size statement of bajaj ...
3 years comparative ratio, trend analysis and common size statement of bajaj ...
 
Awareness of commodity market a project report on mba finance
Awareness of commodity market a project report on mba financeAwareness of commodity market a project report on mba finance
Awareness of commodity market a project report on mba finance
 
A project report on comparative study of mutual funds in india
A project report on comparative study of mutual funds in indiaA project report on comparative study of mutual funds in india
A project report on comparative study of mutual funds in india
 
Financial statement analysis
Financial statement analysisFinancial statement analysis
Financial statement analysis
 
Finance projects topics
Finance projects topicsFinance projects topics
Finance projects topics
 
Mba project report
Mba project reportMba project report
Mba project report
 
Project report on Financial Statement Analysis and interpretation of A Company
Project report on Financial Statement Analysis and interpretation of A CompanyProject report on Financial Statement Analysis and interpretation of A Company
Project report on Financial Statement Analysis and interpretation of A Company
 

Similar to Comparative analysis of balance sheet funding and project

NTPC LTD.
NTPC LTD.NTPC LTD.
Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power Station
Ayush Khare
 
Infrastructure development in india
Infrastructure development in indiaInfrastructure development in india
Infrastructure development in india
Mukesh Khinchi
 
Summer training project on DVC power plant
Summer training project on DVC power plantSummer training project on DVC power plant
Summer training project on DVC power plant
Ankita Shrestha
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
ADITYA ARYAN
 
Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)
Ankit Kumar
 
Report No. 6 of 2012-13 – Performance Audit of Ultra Mega Power Projects unde...
Report No. 6 of 2012-13 – Performance Audit of Ultra Mega Power Projects unde...Report No. 6 of 2012-13 – Performance Audit of Ultra Mega Power Projects unde...
Report No. 6 of 2012-13 – Performance Audit of Ultra Mega Power Projects unde...
Life of A Public Auditor
 

Similar to Comparative analysis of balance sheet funding and project (20)

Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptx
 
Ntpc
NtpcNtpc
Ntpc
 
NTPC LTD.
NTPC LTD.NTPC LTD.
NTPC LTD.
 
Ntpc project ( mba)
Ntpc project ( mba)Ntpc project ( mba)
Ntpc project ( mba)
 
Black book project on power generation company
Black book project on power generation companyBlack book project on power generation company
Black book project on power generation company
 
Reports ntpc
Reports ntpcReports ntpc
Reports ntpc
 
Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power Station
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
Strategic analysis of NTPC Ltd.
Strategic analysis of NTPC Ltd.Strategic analysis of NTPC Ltd.
Strategic analysis of NTPC Ltd.
 
Infrastructure development in india
Infrastructure development in indiaInfrastructure development in india
Infrastructure development in india
 
Summer training project on DVC power plant
Summer training project on DVC power plantSummer training project on DVC power plant
Summer training project on DVC power plant
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
Equity Market Reactions based on Company’s Financial Strategies
Equity Market Reactions based on Company’s Financial StrategiesEquity Market Reactions based on Company’s Financial Strategies
Equity Market Reactions based on Company’s Financial Strategies
 
Strategy Formulation and Recommendation for PT Gagas Energi Indonesia in Mini...
Strategy Formulation and Recommendation for PT Gagas Energi Indonesia in Mini...Strategy Formulation and Recommendation for PT Gagas Energi Indonesia in Mini...
Strategy Formulation and Recommendation for PT Gagas Energi Indonesia in Mini...
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauli
 
177683808 case-study
177683808 case-study177683808 case-study
177683808 case-study
 
Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)
 
Indian energy efficiency scene..a macro perspective.
Indian energy efficiency scene..a macro perspective.Indian energy efficiency scene..a macro perspective.
Indian energy efficiency scene..a macro perspective.
 
Report No. 6 of 2012-13 – Performance Audit of Ultra Mega Power Projects unde...
Report No. 6 of 2012-13 – Performance Audit of Ultra Mega Power Projects unde...Report No. 6 of 2012-13 – Performance Audit of Ultra Mega Power Projects unde...
Report No. 6 of 2012-13 – Performance Audit of Ultra Mega Power Projects unde...
 
Report Energy Efficiency in India: PAT Scheme - The Way Ahead
Report Energy Efficiency in India: PAT Scheme - The Way AheadReport Energy Efficiency in India: PAT Scheme - The Way Ahead
Report Energy Efficiency in India: PAT Scheme - The Way Ahead
 

Recently uploaded

MASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdfMASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
Cocity Enterprises
 

Recently uploaded (20)

Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
 
Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024
 
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Benefits & Risk Of Stock Loans
Benefits & Risk Of Stock LoansBenefits & Risk Of Stock Loans
Benefits & Risk Of Stock Loans
 
7 steps to achieve financial freedom.pdf
7 steps to achieve financial freedom.pdf7 steps to achieve financial freedom.pdf
7 steps to achieve financial freedom.pdf
 
Bhubaneswar🌹Kalpana Mesuem ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...
Bhubaneswar🌹Kalpana Mesuem  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...Bhubaneswar🌹Kalpana Mesuem  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...
Bhubaneswar🌹Kalpana Mesuem ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswa...
 
W.D. Gann Theory Complete Information.pdf
W.D. Gann Theory Complete Information.pdfW.D. Gann Theory Complete Information.pdf
W.D. Gann Theory Complete Information.pdf
 
Turbhe Fantastic Escorts📞📞9833754194 Kopar Khairane Marathi Call Girls-Kopar ...
Turbhe Fantastic Escorts📞📞9833754194 Kopar Khairane Marathi Call Girls-Kopar ...Turbhe Fantastic Escorts📞📞9833754194 Kopar Khairane Marathi Call Girls-Kopar ...
Turbhe Fantastic Escorts📞📞9833754194 Kopar Khairane Marathi Call Girls-Kopar ...
 
Q1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfQ1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdf
 
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call GirlsKurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
 
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
 
Toronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfToronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdf
 
Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...
 
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdfMASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
 
Dubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai Multiple
Dubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai MultipleDubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai Multiple
Dubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai Multiple
 
Bhubaneswar🌹Ravi Tailkes ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
Bhubaneswar🌹Ravi Tailkes  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...Bhubaneswar🌹Ravi Tailkes  ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
Bhubaneswar🌹Ravi Tailkes ❤CALL GIRLS 9777949614 💟 CALL GIRLS IN bhubaneswar ...
 
GIFT City Overview India's Gateway to Global Finance
GIFT City Overview  India's Gateway to Global FinanceGIFT City Overview  India's Gateway to Global Finance
GIFT City Overview India's Gateway to Global Finance
 
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
 
Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...
 
Technology industry / Finnish economic outlook
Technology industry / Finnish economic outlookTechnology industry / Finnish economic outlook
Technology industry / Finnish economic outlook
 

Comparative analysis of balance sheet funding and project

  • 1. COMPARATIVE ANALYSIS OF BALANCE SHEET FUNDING AND PROJECT FINANCING AT NTPC
  • 2. ABOUT THE COMPANY  NTPC Limited is the largest thermal power generating company of India.  It's a public sector company, and was incorporated in the year 1975 to accelerate power development in the country as a wholly owned company of the Government of India.  At present, Government of India holds 89.5% of the total equity shares of the company and the balance 10.5% is held by FIIs, Domestic Banks, Public and others.  The Company other business includes providing consultancy, project management and supervision, oil and gas exploration, power trading and coal mining.
  • 3.  As of march 31, 2011, the Company was executing two projects: Tapovan Hydro Electric Project and Rammam Hydro Electric Project.  As of March 31, 2011, the Company had installed capacity in India was 173626.4 mega-watts.  As of March 31, 2011, the Company had five subsidiaries: NTPC Electric Supply Company Limited, NTPC Vidyut Vyapar Nigam Limited, NTPC Hydro Limited, Kanti Bijlee Utpadan Nigam Limited and Bhartiya Rail Bijlee Company Limited.  It was conferred the status of “NAVRATNA” by GOL in 1997 which was raised to “MAHARATNA” in May, 2010.
  • 4. COMPETETITORS’ OVERVIEW  Tata Power  Reliance Energy  CESC  Adani Power  Torrent Power
  • 5. SWOT ANALYSIS OF NTPC  COMPETETIVE STRENGTH: - Leadership position in the Indian power sector - Strong cash flow - Effective project implementation - Sound customer relations and commercial performance - High operational efficiency of coal-based stations - Operational efficiency - Long term agreements for coal and gas supply - Strategic locations near fuel source - Ability to turn around underperforming stations - Strong balance sheet - Emphasis on corporate governance
  • 6. WEAKNESS: - Depleting raw material - Some plants have become old & need renovation & modernization  OPPORTUNITIES: - Huge demand & supply gap - Upcoming hydro & nuclear sector - Huge opportunities in consultancy services   THREATS: - Rising prices of raw material - Rising competition from private players like Reliance Energy, Tata Power etc.
  • 7. NTPC FUTURE STRATEGY  Maintain market leadership  Improve their operating performance  Pursue fuel security  Diversified fuel mix
  • 8. RESEARCH METHODOLOGY  - OBJECTIVE OF THE STUDY: To study the relative benefits of appraising the thermal project through balance sheet financing or financing via creating a special purpose entity & making comparative analysis on the basis of cost & benefits. LIMITATION OF STUDY: - This study is done from the perspective of NTPC Ltd. only. - Generic Approach in case of Project Assumptions.  METHODOLOGY ADOPTED: - Data collection is purely Secondary. - The analysis has been carried out on the basis of Project information, Assumptions & other necessary details given by NTPC. 
  • 9. ASSUMPTIONS           Gross capacity of power plant is at 1000 MW(500 * 2) COD of unit I is assumed to occur after 56 months from the date of main plant & unit –II is 6 months onwards (62 months after the contract) Date of project cost has to be taken at 30 Nov 2016 Rupee term loan: equity ratio is assumed to be 70:30 Plant load factor is taken at 85 % Auxiliary consumption is assumed at 7 % of the gross energy generated. Tariff has been taken as CERC (terms & conditions for determination of tariff ) regulation prevalent currently(except escalation in tax & O & M cost) Interest in case of debt under balance sheet financing - 11% Depreciation to be charged on the total cost assuming that total cost (except land cost) incurred on plant to be phased out in equal proportion on both the units. ROE & O & M expenses calculations of Unit I & II we take in equal proportions.
  • 10.  Interest in case of SPV route is- 12 %  Repayment in case of balance sheet financing -8 years ( 4 yrs after starting the project)  Interest in case of working capital financing from bank is taken at 11.75 %  Secondary fuel consumption is taken at 1 ml/Kwh  Cost of coal = Rs. 850/1000 kg(primary fuel )  Cost of secondary fuel = Rs. 40/1000 ml with an annual escalation of 0 %.  O & M expenses has been assumed at 0.125 Cr/MW with an annual escalation of 0 %  Working capital requirements has been assumed as 1 month ;O& M expenses ;spares =20 % of O & M expenses & coal cost & secondary fuel cost (2 months value taken)  Company act depreciation -5.28 %; subject to the asset being depreciated till 95 % of cost price.  CERC depreciation -5.28 % p.a. SLM for first 12 years & then spread evenly over the balanced life of the project.  The project life is assumed to be 25 years in line with the CERC guidelines prevalent currently.
  • 11. CONCLUSION  Balance Sheet Financing is the Favoured mode of Financing for the Company due to following reasons: - Long experience of the Company in Operation of Power plants - Strong Balance Sheet - Lower risk due to long term PPA which combines to allow the company to raise loans at significantly lower rates.  All these reasons helps to reduce the WACC of the company and it enjoys decent long term returns.