SlideShare uma empresa Scribd logo
1 de 3
Curriculum Vitae Abd El-Rahman Wakeb
PERSONAL INFORMATION Abd El-Rahman Wakeb
6th of October City, 2nd District, Building No. 348, Egypt.
+201144331799 / +201098889209 /+966580611146 /
+966535347138
Hossienabdelrhman@yahoo.com --- hossienabdelrhman@hotmail.com
Skype – teto0052
Sex Male | Date of birth 01/09/1959 | Nationality Egyptian
WORK EXPERIENCE
(From July 2015 Till present)
Al MABANI GENERAL CONTRACTING ----KINGDOM OF SAUDI
Project: RIYADH METRO PROJECT-----LINE 1&2(BACS consortium)
AL RIYADH DEVOLPMENT ATHORITY
Engineering: AECOM ARABIA LIMITED
Project value: USD 10.1 B
Scope of work: it is about construction of 2 lines including the structural, architectural, and
electrical design. 52 stations between underground, elevated, and at grade will be executed within
these 2 lines. I am working as Project engineer for an underground station where many activities
and tasks will be executed under my supervision and management.
Traffic deck construction is one of the main activities on site which consists of construction of
footings, walls, piling works which are about drilling, installing, and concreting. I-beams will be
installed later on inside the holes and then connected to the footings using H-beams. After that,
installation of precast plankets will take place. Second of all, deep excavation will occur to enable the
TBM to work properly and safely at a depth of 30 m.
Page 1 / 3
POSITION Construction Manager
Curriculum Vitae Abd El-Rahman Wakeb
Page 2 / 3
(From July-2008 TILL 30-6-2015) Archirodon Construction (Overseas) CO. S.A.
Project: Construction of General Cargo Berth, Damietta Port ,Egypt (Jun-2012 to Dec-2014)
▪ Owner: "Damietta Port Authority"
▪ Engineer: “PACER CONSULTANTS”
▪ Project Value: US $146,000,000
▪ Scope of work: (Construction of the General Cargo Berth 340m length and depth 12m
including the construction of the R.C Diaphragm Walls, Piling Works, Dredging Works,
Electrical Works and Fire-fighting Works.
▪ Job Executed:-
 Construction of - New cargo berth -340m diaphragm Wall at Damietta Port (front wall
and rear wall).
 131 Nor. Of bored piles with Dia. 1.00Mand 40m length.
 25 Nor. Of tubular piles with Dia. 0.7mand L=35m In the sea
Project: Banha Power Plant (Nov-2011 to May-2012)
▪ Client: "East Delta Electricity Production Company"
▪ Main Contractor: Archirodon Construction Over Seas
▪ Engineer: “Power Generation for Engineering Services Company” – PGESCo.
▪ Project Value: US $24,967,000
▪ Scope of work: (The project includes design, furnishing, installation and construction of Civil,
Architectural, Electrical and Mechanical works for Banha 750 MW Combined Cycle Project. The
project consists of one combined cycle module configured as 2 x 250 MW Combustion Turbine
Generator, two Heat Recovery Steam Generators and one 250 MW Steam Turbine Generator).
▪ Job Executed:-
 668 bored piles with 20 M length and 90 cm Dim.
 Off shore work The Intake and discharge by using sheet piles about 550 sheet
Project: Damietta Power Plant, Simple Cycle 500 MW Gas Turbine (Jul-2011 to Oct-2011)
▪ Client: "East Delta Electricity Production Company"
▪ Main Contractor: Kharafi National for Mechanical and Electrical Works
▪ Engineer: “Power Generation for Engineering Services Company” – PGESCo
▪ Project Value: US $36,000,000
▪ Scope of work: (Civil Works package for four Units the 4X125 MW Simple Cycle Gas/Turbine
Power Plant. The project scope is described as the infrastructure of a simple cycle gas turbine
unit's power plant, with an output of 500MW).
▪ Job Executed:-
 900 bored piles with 42 M length - φ 1.00
Project: Upgrading Cairo/Alex/Matrouh Desert road - 2Bridge for U Turn cross the Cairo
Alex Desert road (Jul-2010 to Jun-2011)
▪ Main Contractor: ROWAD MODERN ENGINEERING
▪ Budget: Total value of the project 4 million Egyptian Pound
▪ Job Executed:-
 328 bored piles with average length 22 Meter.
 Successfully 2 load test on nonworking piles with375 ton test load.
Project: Dahshour South Project (Apr-2009 to Nov-2009)
▪ Main Contractor: Arab Contractors
▪ Budget: Total value of the project 6 million Egyptian Pound
▪ Job Executed:-
 500 bored pile with average length 25 Meter.
 Successfully 5 load test on working piles with 400 ton test load.
Curriculum Vitae Abd El-Rahman Wakeb
EDUCATION AND TRAINING
PERSONAL SKILLS
ADDITIONAL INFORMATION
ANNEXES
Page 3 / 3
Mother tongue(s) Arabic
Other language(s) UNDERSTANDING SPEAKING WRITING
Listening Reading Spoken interaction Spoken production
English C1 C1 C1 C1 C1
Levels: A1/2: Basic user - B1/2: Independent user - C1/2 Proficient user
Common European Framework of Reference for Languages
Communication skills ▪ Good communication skills gained through my experience as a construction Manager
▪ Good interpersonal skills with others.
Organisational / managerial skills ▪ Good leadership (currently responsible for a team of 50 people).
▪ Capability to perform under pressure.
Job-related skills ▪ Hydraulics Course
▪ Constructions Course
Computer skills ▪ ICDL Course - good command of all Microsoft Office™ tools
▪ High Qualified In Exploring the Internet.
Memberships
Passport
Marital Status
Military Service
Driving Licence
▪ Member in the Egyptian Science Syndicate ID# 37337
▪ A01195262
▪ Married
▪ Exempted
▪ A
▪ References and/or certifications are available upon requisition.
▪ Copies of degrees and qualifications.

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Profesional Engineer c.v
Profesional Engineer c.vProfesional Engineer c.v
Profesional Engineer c.v
 
9. Brochure Centre Point
9. Brochure Centre Point9. Brochure Centre Point
9. Brochure Centre Point
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
 
Sr Civil Engineer
Sr Civil EngineerSr Civil Engineer
Sr Civil Engineer
 
Khaled cv07
Khaled cv07Khaled cv07
Khaled cv07
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
cv mohamed mostafa 6
cv mohamed mostafa 6cv mohamed mostafa 6
cv mohamed mostafa 6
 
C.V
C.VC.V
C.V
 
Mahmoud CV 2015
Mahmoud CV 2015Mahmoud CV 2015
Mahmoud CV 2015
 
Ahmad Anis STR
Ahmad Anis STRAhmad Anis STR
Ahmad Anis STR
 
eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)
 
Cv m.safdar.2016
Cv m.safdar.2016Cv m.safdar.2016
Cv m.safdar.2016
 
Moshtak CV 2016 Pic
Moshtak CV 2016  PicMoshtak CV 2016  Pic
Moshtak CV 2016 Pic
 
candidate-inbar giora 2016
candidate-inbar giora 2016candidate-inbar giora 2016
candidate-inbar giora 2016
 
C.V. Eng. Abdulqader 10-8-2015
C.V. Eng. Abdulqader 10-8-2015C.V. Eng. Abdulqader 10-8-2015
C.V. Eng. Abdulqader 10-8-2015
 
Eng. Hassan Ossama CV. 2016 New
Eng. Hassan Ossama CV. 2016 NewEng. Hassan Ossama CV. 2016 New
Eng. Hassan Ossama CV. 2016 New
 
Eng.mohamed abdallh
Eng.mohamed abdallhEng.mohamed abdallh
Eng.mohamed abdallh
 
Cv mohamed al-jabri - 2018
Cv   mohamed al-jabri - 2018Cv   mohamed al-jabri - 2018
Cv mohamed al-jabri - 2018
 
Hosam - CV
Hosam - CV Hosam - CV
Hosam - CV
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 

Destaque (12)

Tipos de comprensoras
Tipos de comprensorasTipos de comprensoras
Tipos de comprensoras
 
Sfg
SfgSfg
Sfg
 
Para Você!
Para Você!Para Você!
Para Você!
 
20150410132144
2015041013214420150410132144
20150410132144
 
espritC&Ctag4in
espritC&Ctag4inespritC&Ctag4in
espritC&Ctag4in
 
2016 Cobb Keynote
2016 Cobb Keynote2016 Cobb Keynote
2016 Cobb Keynote
 
Математический брейн-ринг
Математический брейн-рингМатематический брейн-ринг
Математический брейн-ринг
 
OpenEnergyMonitor: Univeristy of Turin GreenTo Build Workshop
OpenEnergyMonitor: Univeristy of Turin GreenTo Build WorkshopOpenEnergyMonitor: Univeristy of Turin GreenTo Build Workshop
OpenEnergyMonitor: Univeristy of Turin GreenTo Build Workshop
 
Урок экскурсия в аквариум. 1-Б класс.
Урок экскурсия  в аквариум. 1-Б класс.Урок экскурсия  в аквариум. 1-Б класс.
Урок экскурсия в аквариум. 1-Б класс.
 
Workshop Online Copywriting door Dimitri Lambermont
Workshop Online Copywriting door Dimitri LambermontWorkshop Online Copywriting door Dimitri Lambermont
Workshop Online Copywriting door Dimitri Lambermont
 
AAAAAAAAAAAA MOTORSPORTS PRESENTATION FINAL
AAAAAAAAAAAA MOTORSPORTS PRESENTATION FINALAAAAAAAAAAAA MOTORSPORTS PRESENTATION FINAL
AAAAAAAAAAAA MOTORSPORTS PRESENTATION FINAL
 
La gestion del cambio en proyectos técnicos. El caso de Office 365
La gestion del cambio en proyectos técnicos. El caso de Office 365La gestion del cambio en proyectos técnicos. El caso de Office 365
La gestion del cambio en proyectos técnicos. El caso de Office 365
 

Semelhante a Abd El-Rahman Wakeb CV (20)

أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
c v english
c v englishc v english
c v english
 
Engr._Fahad_CV[1]
Engr._Fahad_CV[1]Engr._Fahad_CV[1]
Engr._Fahad_CV[1]
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
Wael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCEDWael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCED
 
cv amr
cv amrcv amr
cv amr
 
elsayed cv last
elsayed cv lastelsayed cv last
elsayed cv last
 
Ahmed as Road design eng
Ahmed as Road design engAhmed as Road design eng
Ahmed as Road design eng
 
george nasralla CV
george nasralla CVgeorge nasralla CV
george nasralla CV
 
CV
CVCV
CV
 
ashraf frieg CV
ashraf frieg CVashraf frieg CV
ashraf frieg CV
 
Ahmed C.V
Ahmed C.VAhmed C.V
Ahmed C.V
 
Mostafa CV
Mostafa CVMostafa CV
Mostafa CV
 
Hendawy ragabb cv update 21 6 2015
Hendawy ragabb cv update 21   6   2015Hendawy ragabb cv update 21   6   2015
Hendawy ragabb cv update 21 6 2015
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015
 
Senior surveyor ragab atta c.v
Senior surveyor ragab atta c.vSenior surveyor ragab atta c.v
Senior surveyor ragab atta c.v
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 

Abd El-Rahman Wakeb CV

  • 1. Curriculum Vitae Abd El-Rahman Wakeb PERSONAL INFORMATION Abd El-Rahman Wakeb 6th of October City, 2nd District, Building No. 348, Egypt. +201144331799 / +201098889209 /+966580611146 / +966535347138 Hossienabdelrhman@yahoo.com --- hossienabdelrhman@hotmail.com Skype – teto0052 Sex Male | Date of birth 01/09/1959 | Nationality Egyptian WORK EXPERIENCE (From July 2015 Till present) Al MABANI GENERAL CONTRACTING ----KINGDOM OF SAUDI Project: RIYADH METRO PROJECT-----LINE 1&2(BACS consortium) AL RIYADH DEVOLPMENT ATHORITY Engineering: AECOM ARABIA LIMITED Project value: USD 10.1 B Scope of work: it is about construction of 2 lines including the structural, architectural, and electrical design. 52 stations between underground, elevated, and at grade will be executed within these 2 lines. I am working as Project engineer for an underground station where many activities and tasks will be executed under my supervision and management. Traffic deck construction is one of the main activities on site which consists of construction of footings, walls, piling works which are about drilling, installing, and concreting. I-beams will be installed later on inside the holes and then connected to the footings using H-beams. After that, installation of precast plankets will take place. Second of all, deep excavation will occur to enable the TBM to work properly and safely at a depth of 30 m. Page 1 / 3 POSITION Construction Manager
  • 2. Curriculum Vitae Abd El-Rahman Wakeb Page 2 / 3 (From July-2008 TILL 30-6-2015) Archirodon Construction (Overseas) CO. S.A. Project: Construction of General Cargo Berth, Damietta Port ,Egypt (Jun-2012 to Dec-2014) ▪ Owner: "Damietta Port Authority" ▪ Engineer: “PACER CONSULTANTS” ▪ Project Value: US $146,000,000 ▪ Scope of work: (Construction of the General Cargo Berth 340m length and depth 12m including the construction of the R.C Diaphragm Walls, Piling Works, Dredging Works, Electrical Works and Fire-fighting Works. ▪ Job Executed:-  Construction of - New cargo berth -340m diaphragm Wall at Damietta Port (front wall and rear wall).  131 Nor. Of bored piles with Dia. 1.00Mand 40m length.  25 Nor. Of tubular piles with Dia. 0.7mand L=35m In the sea Project: Banha Power Plant (Nov-2011 to May-2012) ▪ Client: "East Delta Electricity Production Company" ▪ Main Contractor: Archirodon Construction Over Seas ▪ Engineer: “Power Generation for Engineering Services Company” – PGESCo. ▪ Project Value: US $24,967,000 ▪ Scope of work: (The project includes design, furnishing, installation and construction of Civil, Architectural, Electrical and Mechanical works for Banha 750 MW Combined Cycle Project. The project consists of one combined cycle module configured as 2 x 250 MW Combustion Turbine Generator, two Heat Recovery Steam Generators and one 250 MW Steam Turbine Generator). ▪ Job Executed:-  668 bored piles with 20 M length and 90 cm Dim.  Off shore work The Intake and discharge by using sheet piles about 550 sheet Project: Damietta Power Plant, Simple Cycle 500 MW Gas Turbine (Jul-2011 to Oct-2011) ▪ Client: "East Delta Electricity Production Company" ▪ Main Contractor: Kharafi National for Mechanical and Electrical Works ▪ Engineer: “Power Generation for Engineering Services Company” – PGESCo ▪ Project Value: US $36,000,000 ▪ Scope of work: (Civil Works package for four Units the 4X125 MW Simple Cycle Gas/Turbine Power Plant. The project scope is described as the infrastructure of a simple cycle gas turbine unit's power plant, with an output of 500MW). ▪ Job Executed:-  900 bored piles with 42 M length - φ 1.00 Project: Upgrading Cairo/Alex/Matrouh Desert road - 2Bridge for U Turn cross the Cairo Alex Desert road (Jul-2010 to Jun-2011) ▪ Main Contractor: ROWAD MODERN ENGINEERING ▪ Budget: Total value of the project 4 million Egyptian Pound ▪ Job Executed:-  328 bored piles with average length 22 Meter.  Successfully 2 load test on nonworking piles with375 ton test load. Project: Dahshour South Project (Apr-2009 to Nov-2009) ▪ Main Contractor: Arab Contractors ▪ Budget: Total value of the project 6 million Egyptian Pound ▪ Job Executed:-  500 bored pile with average length 25 Meter.  Successfully 5 load test on working piles with 400 ton test load.
  • 3. Curriculum Vitae Abd El-Rahman Wakeb EDUCATION AND TRAINING PERSONAL SKILLS ADDITIONAL INFORMATION ANNEXES Page 3 / 3 Mother tongue(s) Arabic Other language(s) UNDERSTANDING SPEAKING WRITING Listening Reading Spoken interaction Spoken production English C1 C1 C1 C1 C1 Levels: A1/2: Basic user - B1/2: Independent user - C1/2 Proficient user Common European Framework of Reference for Languages Communication skills ▪ Good communication skills gained through my experience as a construction Manager ▪ Good interpersonal skills with others. Organisational / managerial skills ▪ Good leadership (currently responsible for a team of 50 people). ▪ Capability to perform under pressure. Job-related skills ▪ Hydraulics Course ▪ Constructions Course Computer skills ▪ ICDL Course - good command of all Microsoft Office™ tools ▪ High Qualified In Exploring the Internet. Memberships Passport Marital Status Military Service Driving Licence ▪ Member in the Egyptian Science Syndicate ID# 37337 ▪ A01195262 ▪ Married ▪ Exempted ▪ A ▪ References and/or certifications are available upon requisition. ▪ Copies of degrees and qualifications.