1. Curriculum Vitae Abd El-Rahman Wakeb
PERSONAL INFORMATION Abd El-Rahman Wakeb
6th of October City, 2nd District, Building No. 348, Egypt.
+201144331799 / +201098889209 /+966580611146 /
+966535347138
Hossienabdelrhman@yahoo.com --- hossienabdelrhman@hotmail.com
Skype – teto0052
Sex Male | Date of birth 01/09/1959 | Nationality Egyptian
WORK EXPERIENCE
(From July 2015 Till present)
Al MABANI GENERAL CONTRACTING ----KINGDOM OF SAUDI
Project: RIYADH METRO PROJECT-----LINE 1&2(BACS consortium)
AL RIYADH DEVOLPMENT ATHORITY
Engineering: AECOM ARABIA LIMITED
Project value: USD 10.1 B
Scope of work: it is about construction of 2 lines including the structural, architectural, and
electrical design. 52 stations between underground, elevated, and at grade will be executed within
these 2 lines. I am working as Project engineer for an underground station where many activities
and tasks will be executed under my supervision and management.
Traffic deck construction is one of the main activities on site which consists of construction of
footings, walls, piling works which are about drilling, installing, and concreting. I-beams will be
installed later on inside the holes and then connected to the footings using H-beams. After that,
installation of precast plankets will take place. Second of all, deep excavation will occur to enable the
TBM to work properly and safely at a depth of 30 m.
Page 1 / 3
POSITION Construction Manager
2. Curriculum Vitae Abd El-Rahman Wakeb
Page 2 / 3
(From July-2008 TILL 30-6-2015) Archirodon Construction (Overseas) CO. S.A.
Project: Construction of General Cargo Berth, Damietta Port ,Egypt (Jun-2012 to Dec-2014)
▪ Owner: "Damietta Port Authority"
▪ Engineer: “PACER CONSULTANTS”
▪ Project Value: US $146,000,000
▪ Scope of work: (Construction of the General Cargo Berth 340m length and depth 12m
including the construction of the R.C Diaphragm Walls, Piling Works, Dredging Works,
Electrical Works and Fire-fighting Works.
▪ Job Executed:-
Construction of - New cargo berth -340m diaphragm Wall at Damietta Port (front wall
and rear wall).
131 Nor. Of bored piles with Dia. 1.00Mand 40m length.
25 Nor. Of tubular piles with Dia. 0.7mand L=35m In the sea
Project: Banha Power Plant (Nov-2011 to May-2012)
▪ Client: "East Delta Electricity Production Company"
▪ Main Contractor: Archirodon Construction Over Seas
▪ Engineer: “Power Generation for Engineering Services Company” – PGESCo.
▪ Project Value: US $24,967,000
▪ Scope of work: (The project includes design, furnishing, installation and construction of Civil,
Architectural, Electrical and Mechanical works for Banha 750 MW Combined Cycle Project. The
project consists of one combined cycle module configured as 2 x 250 MW Combustion Turbine
Generator, two Heat Recovery Steam Generators and one 250 MW Steam Turbine Generator).
▪ Job Executed:-
668 bored piles with 20 M length and 90 cm Dim.
Off shore work The Intake and discharge by using sheet piles about 550 sheet
Project: Damietta Power Plant, Simple Cycle 500 MW Gas Turbine (Jul-2011 to Oct-2011)
▪ Client: "East Delta Electricity Production Company"
▪ Main Contractor: Kharafi National for Mechanical and Electrical Works
▪ Engineer: “Power Generation for Engineering Services Company” – PGESCo
▪ Project Value: US $36,000,000
▪ Scope of work: (Civil Works package for four Units the 4X125 MW Simple Cycle Gas/Turbine
Power Plant. The project scope is described as the infrastructure of a simple cycle gas turbine
unit's power plant, with an output of 500MW).
▪ Job Executed:-
900 bored piles with 42 M length - φ 1.00
Project: Upgrading Cairo/Alex/Matrouh Desert road - 2Bridge for U Turn cross the Cairo
Alex Desert road (Jul-2010 to Jun-2011)
▪ Main Contractor: ROWAD MODERN ENGINEERING
▪ Budget: Total value of the project 4 million Egyptian Pound
▪ Job Executed:-
328 bored piles with average length 22 Meter.
Successfully 2 load test on nonworking piles with375 ton test load.
Project: Dahshour South Project (Apr-2009 to Nov-2009)
▪ Main Contractor: Arab Contractors
▪ Budget: Total value of the project 6 million Egyptian Pound
▪ Job Executed:-
500 bored pile with average length 25 Meter.
Successfully 5 load test on working piles with 400 ton test load.
3. Curriculum Vitae Abd El-Rahman Wakeb
EDUCATION AND TRAINING
PERSONAL SKILLS
ADDITIONAL INFORMATION
ANNEXES
Page 3 / 3
Mother tongue(s) Arabic
Other language(s) UNDERSTANDING SPEAKING WRITING
Listening Reading Spoken interaction Spoken production
English C1 C1 C1 C1 C1
Levels: A1/2: Basic user - B1/2: Independent user - C1/2 Proficient user
Common European Framework of Reference for Languages
Communication skills ▪ Good communication skills gained through my experience as a construction Manager
▪ Good interpersonal skills with others.
Organisational / managerial skills ▪ Good leadership (currently responsible for a team of 50 people).
▪ Capability to perform under pressure.
Job-related skills ▪ Hydraulics Course
▪ Constructions Course
Computer skills ▪ ICDL Course - good command of all Microsoft Office™ tools
▪ High Qualified In Exploring the Internet.
Memberships
Passport
Marital Status
Military Service
Driving Licence
▪ Member in the Egyptian Science Syndicate ID# 37337
▪ A01195262
▪ Married
▪ Exempted
▪ A
▪ References and/or certifications are available upon requisition.
▪ Copies of degrees and qualifications.