The document summarizes several steel bridges that received prizes at a world steel bridge symposium. It describes each bridge's key features and highlights their innovative and aesthetic designs that addressed constructability challenges. The bridges honored included a tied arch bridge in Michigan, a long span bridge in Kentucky with unique erection techniques, and the restoration of a historic suspension bridge in Oregon to meet current standards.
3. Prize Bridge Jury
Matt Farrar, Idaho DOT
Andrew Herrmann, Hardesty Hanover
Thomas Lulay, CH2M Hill
Myint Lwin, FHWA
4. Major Span
US-93 Burro Creek Canyon Bridge
Northwest Arizona
(between Phoenix & Las Vegas)
5.
6.
7.
8.
9.
10. • used innovative erection
techniques, weathering steel,
and classis arch design ... to
produce a good looking
structure
• constructability issues were
crucial ... construction
mitigated environmental
impacts
• consideration given to
construction and worker
safety are an important
aspect of design
11. US-93 Burro Creek Canyon Bridge
Designer - Arizona Department of Transportation
Phoenix, AZ
Shafi Hasan
Fabricator - PDM Bridge
Detailer – Tensor Engineering
Erector – Traylor Brothers
17. • wise use of constructability &
fabrication input early in the
design phase …a beautiful
example of a quality design,
fabrication and construction
effort
• impressive high steel tubs
with innovative ‘angel wing’
erection technique
• aesthetically superior …
constructability issues well
thought out …pleasing span to
depth ratio and symmetry
18. Raccoon Creek Bridge
Designer - Palmer Engineering
Winchester, KY
Brad Robson
Fabricator – High Steel Structures
Detailer – Tensor Engineering
Erector – Bush & Burchett
24. • the steel design addressed
numerous constraints &
challenges at this location …
an artistic solution
• good appearance with
pressurized box for arch to
minimize corrosion
• several innovative solutions.
slender and aesthetic with
complex details in context
sensitive format
25. I-94 Modified Tied Arch Bridge
Designer – Alfred Benesch & Company
Lansing, MI
Muthia Kasi
Ihab Darwish
Fabricator - PDM Bridge
Detailer – CanDraft, Inc.
Erector – Whaley Steel Construction
31. • innovative use of rolled shapes
offers competitive choices to
designers for short span bridges
• good example of steel’s
viability over concrete …
simple, clean, with easy
construction
• aesthetically pleasing …
innovative continuity
connection …simple details,
constructible, economical
alternate to prestress concrete
• standardization and keeping
details simple are the keys to
make steel sections competitive
32. US-36 over Box Elder Creek
Designer – Colorado Department of Transportation
Denver, CO
Teddy Meshesha
Fabricator – Big R Manufacturing
Detailer – Big R Manufacturing
Erector – Structures, Inc.
37. • use of steel counterweight
was requested by citizens and
solved by the design team
• clean appearance with
counterweights hidden
between approach span
girders
• minimizing counterweight
resulted in a pleasing look ...
haunch on approach spans
complimented lift span ...
good symmetry
• good use of steel to push the
state of the practice.
43. • the design & construction
teams worked well to insure
this complex bridge was
constructible over traffic
• innovative triple arch truss …
complicated erection to
achieve success
• structure seems to rise and fly
over the interstate … good
use of steel to make a
remarkable bridge
• the sweeping view of the
triple rib steel arch provides a
pride of the community …
prefabricated segments
facilitate the construction
44. Highland Bridge
Designer – Jacobs Carter Burgess
Denver, CO
Jeff Mehle
Fabricator – King Fabrication
Detailer – King Fabrication
Erector – Harmon Constructors
50. • design effort paid good
attention to detail … historic
reconstruction to meet current
loads and to resist NorthWest
climate impacts
• historic preservation of
Steinman suspension system
• admirable project to rehabilitate
and preserve an historic
landmark
• great restoration of a historic
suspension bridge to meet
current seismic and traffic
needs
51. St. Johns Bridge
Designer – OBEC Consulting Engineers
Jim Bollman
Oregon DOT
Frank Nelson
Fabricator – Hogan Fabrication
Detailer – Hogan Fabrication
Erector – Max J. Kuney Construction